3 floors · 2 apartments · 3,600 sq ft · built 1920 · class S2 · owner of record: Ny Lorimer Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 314 days | Required only if the owner doesn't live there |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 801 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-29 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION #00856 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION #00502 | DOB VIOLATION - ACTIVE |
| Jun 23, 2022 | CONSTRUCTION STRUCTURE RENDERED NON-COMPLIANT. AT FRONT OF BUILDING AT CORNER EXP.1+2 WOODEN COLUMN HAS BEEN DISLODGED AND SPLIT COMPROMISING STRUCTURAL STABILITY DUE TO MOTOR VEHICLE IMPACTING BUILDING. #22-01932 | DOB VIOLATION - ACTIVE |
| Jun 23, 2022 | CONSTRUCTION EMERGENCY WORK-BLDG DAMAGED BY CAR IMPACT ON 6/23/2022.THE NORTHWEST COLUMN WAS SEVERELY DAMAGED & DISPLACED.THE BUILDING IS STRUCTURALLY COMPROMISED.THERE IS POTENTIAL COLLAPSE IMMED INSTLL TEMP SHORNG @N-W CRNR UNDR DIRCT &CONT SUPRVOF PE.INSTALL FENCE @NORTH & WEST.FILE PRMT W/IN 48HRS WRK STRT #FEU30101XC | DOB VIOLATION - ACTIVE |
| Jun 23, 2022 | CONSTRUCTION FAILURE TO MAINTAIN-BLDG DAMAGED ON 6/23/2022 BY CAR IMPACTING THE BLDG.NORTH-WEST CORNER SEVERELY DAMAGED.CRACKS NOTED @2&3 FLRS ABOVE SEVERE DAMAGE NOTED @STORE FRONT OWNER ENGAGE NYSPE & CONTRCTR-EVALU ENTIRE BLDG & RPR UNDER PRMT.FILE PRMT BY 8/1/2022.START WORK BY 9/1/2022 #FEU30102XC | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-HP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for HP Device | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 3:42 PM ET. BBL 3027570005.