3 floors · 6 apartments · 6,000 sq ft · built 1931 · class C2 · owner of record: Sng Capital Investors, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 70 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 16, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLAINT MANNER. AT TIME OF INSPECTION OBSERVED MISSING BRICKS AT WINDOW HEADER AT LEFT SIDE OF BUILDING AT 3FL. ALSO OBSERVED A RUSTED AND CHIPPED PAINT THROUGHOUT FIRE #39208270X | Dec 23, 2026 PENDING | $1,250 |
| Nov 11, 2020 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED 3RD FLOOR LEVEL WINDOW TOP INSTATE OF DISREPAIR CONDITION WITH ROTTED METAL LINTEL AND MISSING STUCCO WITH GAP. ALSO OBSERVED MASONRY PARAPET AT ROOF LEVEL SLIGHTLY LEANING IN TOW #39031867H | Mar 17, 2021 DEFAULT | $3,125 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #12332 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #11223 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #43424 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #22470 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #24278 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #44127 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #11791 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #06884 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #08722 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #06717 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #11340 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #12713 | DOB VIOLATION - ACTIVE |
| Mar 1, 2013 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT #09860 | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT #13044 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #15199 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #11665 | DOB VIOLATION - ACTIVE |
| Jan 3, 2008 | LOCAL LAW 62/91 - BOILERS #11642 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #12108 | DOB VIOLATION - ACTIVE |
| Jan 6, 2006 | LOCAL LAW 62/91 - BOILERS #11589 | DOB VIOLATION - ACTIVE |
| Jan 31, 2005 | LOCAL LAW 62/91 - BOILERS #12465 | DOB VIOLATION - ACTIVE |
| Mar 19, 2003 | LOCAL LAW 62/91 - BOILERS #20628 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #22072 | DOB VIOLATION - ACTIVE |
| Mar 16, 1999 | LOCAL LAW 62/91 - BOILERS #20952 | DOB VIOLATION - ACTIVE |
| May 4, 1998 | LOCAL LAW 62/91 - BOILERS #18099 | DOB VIOLATION - ACTIVE |
| Aug 29, 1995 | LOCAL LAW 62/91 - BOILERS #24326 | DOB VIOLATION - ACTIVE |
| Jun 1, 1994 | LOCAL LAW 62/91 - BOILERS #05419 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #22526 | DOB VIOLATION - ACTIVE |
| Jun 1, 1993 | LOCAL LAW 62/91 - BOILERS #05418 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| Mar 1, 2013 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT | Active |
| Dec 13, 2011 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Jan 3, 2008 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Jan 6, 2006 | Boiler LL6291 | Active |
| Jan 31, 2005 | Boiler LL6291 | Active |
| Mar 19, 2003 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Mar 16, 1999 | Boiler LL6291 | Active |
| May 4, 1998 | Boiler LL6291 | Active |
| Aug 29, 1995 | Boiler LL6291 | Active |
| Jun 1, 1994 | Boiler LL6291 | Active |
| Jun 1, 1993 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jan 31, 2018 | I | §27-2153 ADM CODE THE PREMISES HAS BEEN SELECTED TO PARTICIPATE IN THE ALTERNATIVE ENFORCEMENT PROGRAM WHICH MAY RESULT IN BUILDING-WIDE INSPECTIONS, FEES, AND EXTENSIVE REPAIR WORK TO CORRECT VIOLATIONS AND UNDERLYING CONDITIONS. CHARGES FOR REPAIR WORK DONE PURSUANT TO THIS ORDER, IF NOT PAID, WIL | — |
| Sep 3, 2026 | B | § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL. | Oct 8, 2026 |
| Sep 3, 2026 | B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE GARBADGE BAGS OBSTRUCTING ENTRANCE LEADING TO BASEMENT AT BUILDING FRONT YARD | Oct 8, 2026 |
| Aug 3, 2026 | B | Apt 6 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 7, 2026 |
| Aug 3, 2026 | B | Apt 6 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CRACKED GLASS PANE AT LOWER SASH OF WINDOW AT NORTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 7, 2026 |
| May 5, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 8, 2026 |
| Mar 24, 2026 | B | Apt 6 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT LESS THAN 10 SQFT WINDOW FRAME FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 18426335 ISSUED 22-NOV-25 HAS BEEN UPGRADED TO CLASS B PER A | Apr 28, 2026 |
| Mar 24, 2026 | B | Apt 6 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT LESSTHAN 10 SQFT CEILING IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 18426338 ISSUED 22-NOV-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2017.3a( | Apr 28, 2026 |
| Jan 2, 2026 | C | Apt 6 · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 8, 2026 |
| Jan 2, 2026 | C | Apt 4 · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 4, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 8, 2026 |
| Jan 2, 2026 | C | Apt 6 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 8, 2026 |
| Jan 2, 2026 | B | Apt 2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR KNOB IN THE ENTRANCE LOCATED AT APT 2, 1st STORY | Feb 6, 2026 |
| Jan 2, 2026 | C | Apt 4 · § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED WIRES AT NORTH AND SOUTH WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 4, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 8, 2026 |
| Jan 2, 2026 | B | Apt 2 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 6, 2026 |
| Jan 2, 2026 | C | Apt 4 · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILNG IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 4, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 8, 2026 |
| Nov 24, 2025 | B | Apt 6 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING KNOB AT, RADIATIOR SHUT OFF VALVE , WEST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 29, 2025 |
| Nov 24, 2025 | C | Apt 6 · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 3, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 6, 3rd STORY, 1st APART | Dec 20, 2025 |
| Nov 24, 2025 | B | Apt 6 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 29, 2025 |
| Nov 24, 2025 | A | Apt 6 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 27, 2026 |
| Nov 24, 2025 | B | Apt 6 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING KNOB AT DOOR TO CLOSET , SOUTH WALL , IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 29, 2025 |
| Nov 24, 2025 | B | Apt 6 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CRACKED WOOD FLOOR IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 29, 2025 |
| Nov 24, 2025 | C | Apt 6 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CRACKED GASS AT UPPER SASH WINDOW , 2ND FROM EAST AT SOUTH IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 30, 2025 |
| Nov 24, 2025 | B | Apt 6 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING KNOB AT RADIATOR SHUT OFF VALVE , SOUTH WALL, IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 29, 2025 |
| Nov 24, 2025 | C | Apt 6 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ROTTEN WOOD FLOOR IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 30, 2025 |
| Nov 24, 2025 | B | Apt 6 · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS INOPERATIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 29, 2025 |
| Nov 24, 2025 | B | Apt 6 · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES INOPERATIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 29, 2025 |
| Nov 24, 2025 | C | Apt 6 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 20, 2025 |
| Nov 24, 2025 | A | Apt 6 · § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 27, 2026 |
| Nov 24, 2025 | B | Apt 6 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGLAZE THE PORCELAIN PAINT AT BATHTUB , WEST WALL , IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 29, 2025 |
| Nov 24, 2025 | B | Apt 6 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GASKET AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 29, 2025 |
| Nov 24, 2025 | A | Apt 6 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING KNOB AT NORTH WALL CABINETS IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 27, 2026 |
| Nov 24, 2025 | B | Apt 6 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SADDLE AT DOOR EAST WALL IN THE FOYER LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 29, 2025 |
| Nov 24, 2025 | C | Apt 6 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT SOUTH WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY | Dec 18, 2025 |
| Nov 24, 2025 | C | Apt 6 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1s | Dec 18, 2025 |
| Nov 24, 2025 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE STRIKE PLATE LOCKING DEVICE ON DOOR FRAME AT BUILDING ENTRANCE | Nov 30, 2025 |
| Nov 24, 2025 | C | Apt 6 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st | Dec 18, 2025 |
| Nov 24, 2025 | B | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF .. YARD | Dec 29, 2025 |
| Nov 24, 2025 | A | Apt 6 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH AT WEST, THE 3rd ROOM FROM NORTH AT WEST, THE 3rd ROOM FROM NORTH AT EAST, THE FOYER , THE PRIVATE HALLWAY LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EA | Feb 27, 2026 |
| Nov 24, 2025 | A | Apt 6 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 27, 2026 |
| Nov 24, 2025 | A | Apt 6 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st WINDOW FRAME FROM NORTH AT EAST WALL, CEILING, 1st WALL CABINET FROM WEST AT NORTH WALL, WEST WALL IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 27, 2026 |
| Nov 24, 2025 | A | Apt 6 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 27, 2026 |
| Nov 24, 2025 | A | Apt 6 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, 1st DOOR FRAME FROM EAST AT SOUTH WALL, SOUTH WALL, 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME, 1st CLOSET FROM EAST AT SOUTH WALL DOOR, 1st WINDOW FRAME FROM WEST AT NORTH WALL, WEST WALL, NORTH | Feb 27, 2026 |
| Nov 24, 2025 | A | Apt 6 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st WINDOW FRAME FROM EAST AT SOUTH WALL, CEILING, SOUTH WALL IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 27, 2026 |
| Nov 24, 2025 | C | Apt 6 · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 30, 2025 |
| Nov 24, 2025 | B | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING HANDRAIL AT STAIR BELOW GRADE, NORTHEAST SECTION, BUILDING FRONT YARD | Dec 29, 2025 |
| Nov 24, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE .. YARD | Dec 29, 2025 |
| Nov 24, 2025 | B | Apt 6 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 29, 2025 |
| Nov 24, 2025 | B | Apt 6 · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 29, 2025 |
| Nov 24, 2025 | A | Apt 6 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL, NORTH WALL, EAST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 27, 2026 |
| Nov 24, 2025 | A | Apt 6 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 27, 2026 |
| Nov 24, 2025 | A | Apt 6 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THR 1st RISER FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 27, 2026 |
| Nov 24, 2025 | A | Apt 6 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME, 1st CLOSET FROM EAST AT SOUTH WALL DOOR IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 27, 2026 |
| Nov 24, 2025 | A | Apt 6 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 27, 2026 |
| Nov 24, 2025 | A | Apt 6 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 27, 2026 |
| Nov 24, 2025 | A | Apt 6 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, SOUTH WALL IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 27, 2026 |
| Nov 24, 2025 | A | Apt 6 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 27, 2026 |
| Nov 24, 2025 | A | Apt 6 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 27, 2026 |
| Nov 24, 2025 | A | Apt 6 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 27, 2026 |
| Nov 24, 2025 | C | Apt 6 · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 30, 2025 |
| Nov 24, 2025 | A | Apt 6 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 27, 2026 |
Showing 60 of 237. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 16, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN A CODE COMPLAINT MANNER. AT TIME OF INSPECTION OBSERVED MISSING BRICKS AT WINDOW HEADER AT LEFT SIDE OF BUILDING AT 3FL. ALSO OBSERVED A RUSTED AND CHIPPED PAINT THROUGHOUT FIRE | Open |
| Sep 3, 2026 | HPD B | § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL. | Open |
| Sep 3, 2026 | HPD B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE GARBADGE BAGS OBSTRUCTING ENTRANCE LEADING TO BASEMENT AT BUILDING FRONT YARD | Open |
| Aug 3, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Aug 3, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CRACKED GLASS PANE AT LOWER SASH OF WINDOW AT NORTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 4:07 PM ET. BBL 3047990024.