Brooklyn · Block 4799 · Lot 24 · 11203

590 Maple Street

3 floors · 6 apartments · 6,000 sq ft · built 1931 · class C2 · owner of record: Sng Capital Investors, Llc

295open violations
$4,375ECB/OATH penalties owed
93HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 70 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 70 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 70 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 86 days
Annual

Open violations

ECB / OATH (2) · $4,375 owed
IssuedViolationHearingBalance
Oct 16, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLAINT MANNER. AT TIME OF INSPECTION OBSERVED MISSING BRICKS AT WINDOW HEADER AT LEFT SIDE OF BUILDING AT 3FL. ALSO OBSERVED A RUSTED AND CHIPPED PAINT THROUGHOUT FIRE
#39208270X
Dec 23, 2026
PENDING
$1,250
Nov 11, 2020Construction CLASS - 2
AT TIME OF INSPECTION OBSERVED 3RD FLOOR LEVEL WINDOW TOP INSTATE OF DISREPAIR CONDITION WITH ROTTED METAL LINTEL AND MISSING STUCCO WITH GAP. ALSO OBSERVED MASONRY PARAPET AT ROOF LEVEL SLIGHTLY LEANING IN TOW
#39031867H
Mar 17, 2021
DEFAULT
$3,125
DOB (28)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#12332
DOB VIOLATION - ACTIVE
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#11223
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#43424
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
#22470
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#24278
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#44127
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#11791
DOB VIOLATION - ACTIVE
Nov 8, 2019LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#06884
DOB VIOLATION - ACTIVE
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#08722
DOB VIOLATION - ACTIVE
Feb 24, 2017LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
#06717
DOB VIOLATION - ACTIVE
Mar 3, 2015LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
#11340
DOB VIOLATION - ACTIVE
May 15, 2014LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
#12713
DOB VIOLATION - ACTIVE
Mar 1, 2013LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
#09860
DOB VIOLATION - ACTIVE
Dec 13, 2011LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
#13044
DOB VIOLATION - ACTIVE
Dec 31, 2009LOW PRESSURE BOILER

#15199
DOB VIOLATION - ACTIVE
Jan 1, 2009LOCAL LAW 62/91 - BOILERS

#11665
DOB VIOLATION - ACTIVE
Jan 3, 2008LOCAL LAW 62/91 - BOILERS

#11642
DOB VIOLATION - ACTIVE
Jan 19, 2007LOCAL LAW 62/91 - BOILERS

#12108
DOB VIOLATION - ACTIVE
Jan 6, 2006LOCAL LAW 62/91 - BOILERS

#11589
DOB VIOLATION - ACTIVE
Jan 31, 2005LOCAL LAW 62/91 - BOILERS

#12465
DOB VIOLATION - ACTIVE
Mar 19, 2003LOCAL LAW 62/91 - BOILERS

#20628
DOB VIOLATION - ACTIVE
Mar 26, 2002LOCAL LAW 62/91 - BOILERS

#22072
DOB VIOLATION - ACTIVE
Mar 16, 1999LOCAL LAW 62/91 - BOILERS

#20952
DOB VIOLATION - ACTIVE
May 4, 1998LOCAL LAW 62/91 - BOILERS

#18099
DOB VIOLATION - ACTIVE
Aug 29, 1995LOCAL LAW 62/91 - BOILERS

#24326
DOB VIOLATION - ACTIVE
Jun 1, 1994LOCAL LAW 62/91 - BOILERS

#05419
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#22526
DOB VIOLATION - ACTIVE
Jun 1, 1993LOCAL LAW 62/91 - BOILERS

#05418
DOB VIOLATION - ACTIVE
DOB NOW Safety (28)
IssuedViolationStatus
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 9)
Active
Sep 23, 2024Boiler LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
Nov 8, 2019Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Active
Feb 24, 2017Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Active
Mar 3, 2015Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
Active
May 15, 2014Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Active
Mar 1, 2013Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
Active
Dec 13, 2011Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Active
Dec 31, 2009Boiler LBLVIO
Active
Jan 1, 2009Boiler LL6291
Active
Jan 3, 2008Boiler LL6291
Active
Jan 19, 2007Boiler LL6291
Active
Jan 6, 2006Boiler LL6291
Active
Jan 31, 2005Boiler LL6291
Active
Mar 19, 2003Boiler LL6291
Active
Mar 26, 2002Boiler LL6291
Active
Mar 16, 1999Boiler LL6291
Active
May 4, 1998Boiler LL6291
Active
Aug 29, 1995Boiler LL6291
Active
Jun 1, 1994Boiler LL6291
Active
Jun 1, 1993Boiler LL6291
Active
HPD (237) · C 93 · B 110 · A 33
IssuedClassViolationCorrect by
Jan 31, 2018I§27-2153 ADM CODE THE PREMISES HAS BEEN SELECTED TO PARTICIPATE IN THE ALTERNATIVE ENFORCEMENT PROGRAM WHICH MAY RESULT IN BUILDING-WIDE INSPECTIONS, FEES, AND EXTENSIVE REPAIR WORK TO CORRECT VIOLATIONS AND UNDERLYING CONDITIONS. CHARGES FOR REPAIR WORK DONE PURSUANT TO THIS ORDER, IF NOT PAID, WIL—
Sep 3, 2026B§ 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL.Oct 8, 2026
Sep 3, 2026B§ 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE GARBADGE BAGS OBSTRUCTING ENTRANCE LEADING TO BASEMENT AT BUILDING FRONT YARDOct 8, 2026
Aug 3, 2026BApt 6 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHSep 7, 2026
Aug 3, 2026BApt 6 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CRACKED GLASS PANE AT LOWER SASH OF WINDOW AT NORTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHSep 7, 2026
May 5, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 8, 2026
Mar 24, 2026BApt 6 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT LESS THAN 10 SQFT WINDOW FRAME FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 18426335 ISSUED 22-NOV-25 HAS BEEN UPGRADED TO CLASS B PER AApr 28, 2026
Mar 24, 2026BApt 6 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT LESSTHAN 10 SQFT CEILING IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 18426338 ISSUED 22-NOV-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2017.3a(Apr 28, 2026
Jan 2, 2026CApt 6 · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHJan 8, 2026
Jan 2, 2026CApt 4 · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 4, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHJan 8, 2026
Jan 2, 2026CApt 6 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHJan 8, 2026
Jan 2, 2026BApt 2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR KNOB IN THE ENTRANCE LOCATED AT APT 2, 1st STORYFeb 6, 2026
Jan 2, 2026CApt 4 · § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED WIRES AT NORTH AND SOUTH WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 4, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHJan 8, 2026
Jan 2, 2026BApt 2 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 6, 2026
Jan 2, 2026CApt 4 · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILNG IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 4, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHJan 8, 2026
Nov 24, 2025BApt 6 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING KNOB AT, RADIATIOR SHUT OFF VALVE , WEST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHDec 29, 2025
Nov 24, 2025CApt 6 · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 3, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 6, 3rd STORY, 1st APARTDec 20, 2025
Nov 24, 2025BApt 6 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHDec 29, 2025
Nov 24, 2025AApt 6 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 27, 2026
Nov 24, 2025BApt 6 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING KNOB AT DOOR TO CLOSET , SOUTH WALL , IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHDec 29, 2025
Nov 24, 2025BApt 6 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CRACKED WOOD FLOOR IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHDec 29, 2025
Nov 24, 2025CApt 6 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CRACKED GASS AT UPPER SASH WINDOW , 2ND FROM EAST AT SOUTH IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHNov 30, 2025
Nov 24, 2025BApt 6 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING KNOB AT RADIATOR SHUT OFF VALVE , SOUTH WALL, IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHDec 29, 2025
Nov 24, 2025CApt 6 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ROTTEN WOOD FLOOR IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHNov 30, 2025
Nov 24, 2025BApt 6 · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS INOPERATIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHDec 29, 2025
Nov 24, 2025BApt 6 · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES INOPERATIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHDec 29, 2025
Nov 24, 2025CApt 6 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHDec 20, 2025
Nov 24, 2025AApt 6 · § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 27, 2026
Nov 24, 2025BApt 6 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGLAZE THE PORCELAIN PAINT AT BATHTUB , WEST WALL , IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHDec 29, 2025
Nov 24, 2025BApt 6 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GASKET AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHDec 29, 2025
Nov 24, 2025AApt 6 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING KNOB AT NORTH WALL CABINETS IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 27, 2026
Nov 24, 2025BApt 6 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SADDLE AT DOOR EAST WALL IN THE FOYER LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHDec 29, 2025
Nov 24, 2025CApt 6 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT SOUTH WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORYDec 18, 2025
Nov 24, 2025CApt 6 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1sDec 18, 2025
Nov 24, 2025C§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE STRIKE PLATE LOCKING DEVICE ON DOOR FRAME AT BUILDING ENTRANCENov 30, 2025
Nov 24, 2025CApt 6 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1stDec 18, 2025
Nov 24, 2025B§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF .. YARDDec 29, 2025
Nov 24, 2025AApt 6 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH AT WEST, THE 3rd ROOM FROM NORTH AT WEST, THE 3rd ROOM FROM NORTH AT EAST, THE FOYER , THE PRIVATE HALLWAY LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAFeb 27, 2026
Nov 24, 2025AApt 6 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 27, 2026
Nov 24, 2025AApt 6 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st WINDOW FRAME FROM NORTH AT EAST WALL, CEILING, 1st WALL CABINET FROM WEST AT NORTH WALL, WEST WALL IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 27, 2026
Nov 24, 2025AApt 6 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 27, 2026
Nov 24, 2025AApt 6 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, 1st DOOR FRAME FROM EAST AT SOUTH WALL, SOUTH WALL, 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME, 1st CLOSET FROM EAST AT SOUTH WALL DOOR, 1st WINDOW FRAME FROM WEST AT NORTH WALL, WEST WALL, NORTH Feb 27, 2026
Nov 24, 2025AApt 6 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st WINDOW FRAME FROM EAST AT SOUTH WALL, CEILING, SOUTH WALL IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 27, 2026
Nov 24, 2025CApt 6 · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHNov 30, 2025
Nov 24, 2025B§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING HANDRAIL AT STAIR BELOW GRADE, NORTHEAST SECTION, BUILDING FRONT YARDDec 29, 2025
Nov 24, 2025B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE .. YARDDec 29, 2025
Nov 24, 2025BApt 6 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHDec 29, 2025
Nov 24, 2025BApt 6 · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHDec 29, 2025
Nov 24, 2025AApt 6 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL, NORTH WALL, EAST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 27, 2026
Nov 24, 2025AApt 6 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 27, 2026
Nov 24, 2025AApt 6 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THR 1st RISER FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 27, 2026
Nov 24, 2025AApt 6 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME, 1st CLOSET FROM EAST AT SOUTH WALL DOOR IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 27, 2026
Nov 24, 2025AApt 6 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 27, 2026
Nov 24, 2025AApt 6 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 27, 2026
Nov 24, 2025AApt 6 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, SOUTH WALL IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 27, 2026
Nov 24, 2025AApt 6 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 27, 2026
Nov 24, 2025AApt 6 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 27, 2026
Nov 24, 2025AApt 6 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 27, 2026
Nov 24, 2025CApt 6 · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHNov 30, 2025
Nov 24, 2025AApt 6 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 27, 2026

Showing 60 of 237. Full list on the agency site.

Issued in the last 120 days

DateSourceWhatNow
Oct 16, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN A CODE COMPLAINT MANNER. AT TIME OF INSPECTION OBSERVED MISSING BRICKS AT WINDOW HEADER AT LEFT SIDE OF BUILDING AT 3FL. ALSO OBSERVED A RUSTED AND CHIPPED PAINT THROUGHOUT FIREOpen
Sep 3, 2026HPD B§ 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL.Open
Sep 3, 2026HPD B§ 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE GARBADGE BAGS OBSTRUCTING ENTRANCE LEADING TO BASEMENT AT BUILDING FRONT YARDOpen
Aug 3, 2026HPD B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHOpen
Aug 3, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CRACKED GLASS PANE AT LOWER SASH OF WINDOW AT NORTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 22, 2026, 4:07 PM ET. BBL 3047990024.

Look up another building