| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2020-12-16 (Accepted). Agency page | Dec 31, 2026 in 64 days | 2 of 2 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 202,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 185 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 185 days | Annual filing |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 177). Agency page | Dec 31, 2027 in 429 days | Next due 2027 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $54,900 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 481 days | No Cycle 10 report on record yet |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 795 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 28, 2026 | Construction CLASS - 1 AT TIME OF INSPECTION OF A 17 STORIES BUILDING UNDER STRUCTURAL MODIFICATION I OBSERVED DEMOLITION ACTIVITIES IN PROGRESS IN PART OF 4TH FLOOR SECTION IN THE BUILDING WITH USE OF MECHANICAL EQUIPMENT UPON REVIE #39557139X | Oct 1, 2026 DEFAULT | $2,530 |
| Jan 16, 2024 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #900392. REMEDY: FILE ACCEPTABLE REPORT. #37026685H | May 2, 2024 IN VIOLATION | $0 |
| Mar 30, 2020 | Construction CLASS - 2 SEC. 27-929.1 AC 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/19,IN AN OFFICE BLDG #37018868K | Jul 2, 2020 DEFAULT | $0 |
| Nov 15, 2019 | Construction CLASS - 2 27-929.1 A.C. 27-929-1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/19,IN AN OFFICE BUILDIN #37016047Y | Feb 13, 2020 DEFAULT | $0 |
| Aug 13, 2018 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS AND APPURTENANCES. NOTE: EXP#1 EAST ELEVATION - I OBSERVED ON 6TH FLOOR PUSH OF SHELF ANGLES BRICKS AT SPANDREL BENEATH 7TH FLOOR WINDOW SILL. THIS CONDITION WAS #35319521H | Jan 3, 2019 IN VIOLATION | $0 |
| Jan 11, 2018 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. AT TIME OF INSPECTION I OBSERVED ON EXPOSURE #1 EAST ELEVATION:-CRACKED BRICKS ON 13TH FLOOR SOUTH EAST CORNER LINTEL HEIGHT; DAMAGED & MISSING MO #35265084H | Oct 23, 2018 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #01731 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #01732 | DOB VIOLATION - ACTIVE |
| Sep 21, 2025 | CONSTRUCTION STRUCTURE RENDERED NON COMPLAINT. AT THE CORNER OF EXP#1 AND 2 SIDE WALK SHED 5 UPRIGHT COLUMNS SHIFTED, CROSS BRACE BENT, JUNIOR BEAM SHIFTED DUE TO CAR STRIKE SWS. #25-02187 | DOB VIOLATION - ACTIVE |
| Sep 21, 2025 | CONSTRUCTION STRUCTURE RENDERED NON COMPLIANT AT TIME OF INPSECTION OBSERVED AT COR NER OF EXPOSURE 1 AND EXPOSURE 2 SWS HAS 5 UPRIGHT COLUMNS SHIFTED CROSS BRACES BENT AND JUNIOR BEANS SHIFTED DUE TO CAR STRIKING SWS #CER01CR | DOB VIOLATION - ACTIVE |
| Nov 1, 2023 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FAILURE TO CORRECT SWARMP CONDITIONS #00137 | DOB VIOLATION - ACTIVE |
| Feb 21, 2023 | HAZARDOUS CONDITION (FACADE) CYCLE 9B UNSAFE REPORT FILED #910960 | DOB VIOLATION - ACTIVE |
| Mar 15, 2021 | ELEVATOR #9027/698858 | DOB VIOLATION - ACTIVE |
| Mar 15, 2021 | ELEVATOR #9027/698857 | DOB VIOLATION - ACTIVE |
| Sep 3, 2019 | SPRINKLER FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019 #NRF00372 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Sep 2, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Nov 1, 2023 | Facades FISPFCS CYCLE 9B FAILURE TO CORRECT SWARMP CONDITIONS | Active |
| Feb 21, 2023 | Facades FISPHAZ CYCLE 9B UNSAFE REPORT FILED | Active |
| Sep 3, 2019 | Sprinklers FTF-SP-FINAL | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Sep 2, 2026 | DOB Safety | AEUHAZ: | Open |
| Jul 28, 2026 | ECB | Construction: AT TIME OF INSPECTION OF A 17 STORIES BUILDING UNDER STRUCTURAL MODIFICATION I OBSERVED DEMOLITION ACTIVITIES IN PROGRESS IN PART OF 4TH FLOOR SECTION IN THE BUILDING WITH USE OF MECHANICAL EQUIPMENT UPON REVIE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)