Manhattan · Block 307 · Lot 24 · 10002

59 Allen Street

5 floors · 57,807 sq ft · built 1910 · class G9 · owner of record: Lerner William

5open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
183dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 62 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 57,807 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 183 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 183 days
Annual filing
Energy audit and retro-commissioning (2027) Likely applies
Local Law 87 · Calendar year 2027
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 307). Agency page

Dec 31, 2027
in 427 days
Next due 2027
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 793 days
Next cycle year 2028

Open violations

ECB / OATH (0)

None open.

DOB (3)
IssuedViolationStatus
Mar 21, 2025CONSTRUCTION
EWO PARKING STRUCT (SUBCELLAR, CELLAR, FL 1-3) OBSERVED MISSING FIRE- PROOFIN DETERIORATED SPAULLED MASONRY & MORTAR JOINTS CAUSING AN HAZRD TO VEHICULAR/PEDESTRN TRAFFIC. REMDY:RETAIN A NYS RDP TO SUPERV THE IM -MEDITE INSTALL OF SAFTY MEAS & PROVIDE SHORING. WORK DONE UNDR F/TSU -PERV OF NYS RDP.
#PS10302JL
DOB VIOLATION - ACTIVE
Apr 5, 2024CONSTRUCTION
EMERGENCY WORK ORDER TO UNSAFE PARKING STRUCTURE CONSISTING 5 LEVELS.O BSERVED RUSTED METAL CEILING PANEL WITH HOLES IN VARIOUS LOCATIONS AT LEVELS 1,2,3.CRACKING BRICKS,SPALLED BRICKS,CRACKED CEILING WITH HOLES AT LEVELS 4,5 AT VARIOUS LOCATIONS.REMEDY:OWNER TO RETAIN A NYS RD PRO TO DIRECT AND SUP
#FA10302YC
DOB VIOLATION - ACTIVE
Sep 17, 2020CONSTRUCTION
DUE TO FIRE
#CER03SM
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 3)
Active
Dec 31, 2024Parking Structures FTC-PS-UNSAFE
Unsafe report of parking structures filed.
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 30, 2026, 5:44 AM ET. BBL 1003070024.

Look up another building