2 floors · 2 apartments · 1,792 sq ft · built 1920 · class B3 · owner of record: An Ju Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 311 days | Required only if the owner doesn't live there |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 20, 2026 | C | Apt 1 · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Jun 13, 2026 |
| May 19, 2026 | B | Apt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 23, 2026 |
| May 19, 2026 | C | Apt 1 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE 2nd BATHROOM LOCATED AT APT 1, 1st STORY | Jun 12, 2026 |
| May 19, 2026 | A | Apt 1 · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE KITCHEN , THE 1st ROOM FROM NORTH, THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 22, 2026 |
| May 19, 2026 | C | Apt 1 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT SOUTH WALL, BASEBOARD AT WEST WALL, WEST WALL IN THE 6th ROOM FROM NORTH | Jun 12, 2026 |
| May 19, 2026 | B | Apt 1 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET AT EAST WALL IN THE 6th ROOM FROM NORTH AT WEST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 23, 2026 |
| May 19, 2026 | A | Apt 1 · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FROM EAST AT SOUTH WALL IN THE 2nd BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 22, 2026 |
| May 19, 2026 | B | Apt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 23, 2026 |
| May 19, 2026 | A | Apt 1 · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST WALL IN THE 6th ROOM FROM NORTH AT WEST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 22, 2026 |
| Feb 19, 2026 | B | Apt 1FL · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES ELECTRIC OUTLET AT THE NORTH WALL IN THE KITCHEN LOCATED AT APT 1FL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 26, 2026 |
| Feb 19, 2026 | C | Apt 1FL · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 1FL, 2nd STORY, 1st APART | Mar 15, 2026 |
| Feb 19, 2026 | A | Apt 1FL · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , EAST WALL, EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 1FL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | May 25, 2026 |
| Feb 19, 2026 | B | Apt 1FL · § 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE AT BATHTUB IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 1FL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 26, 2026 |
| Feb 19, 2026 | B | Apt 1FL · § 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE AT BATHTUB IN THE 1st BATHROOM FROM EAST LOCATED AT APT 1FL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 26, 2026 |
| Feb 19, 2026 | B | Apt 1FL · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES ELECTRIC OUTLET AT THE NORTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 1FL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 26, 2026 |
| Feb 19, 2026 | B | Apt 1FL · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1FL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 26, 2026 |
| Feb 19, 2026 | A | Apt 1FL · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st BATHROOM FROM EAST, THE 3rd ROOM FROM EAST AT NORTH, THE 4th ROOM FROM EAST, THE KITCHEN LOCATED AT APT 1FL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | May 25, 2026 |
| Feb 19, 2026 | B | Apt 1FL · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE EAST WALL IN THE KITCHEN LOCATED AT APT 1FL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 26, 2026 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 3:28 PM ET. BBL 4026550029.