Brooklyn · Block 149 · Lot 14 · 11201

589 Fulton Street

52 floors · 591 apartments · 565,326 sq ft · built 2023 · class D6 · owner of record: Brook Ny Residential Llc

13open violations
$11,250ECB/OATH penalties owed
1HPD class C (immediately hazardous)
58dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 58 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 58 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 74 days
Annual
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page

Feb 21, 2027
in 110 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 565,326 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 179 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 179 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 302 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1154 days
Next cycle year 2029
Energy audit and retro-commissioning (2029) Likely applies
Local Law 87 · Calendar year 2029
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 149). Agency page

Dec 31, 2029
in 1154 days
Next due 2029

Open violations

ECB / OATH (2) · $11,250 owed
IssuedViolationHearingBalance
Sep 30, 2026Construction CLASS - 2
AT THE TIME OF INSPECTION OF A 52 STORY MIXED USED BUILDING I OBSERVED CONSTRUCTION ACTIVITY AT EXP 3/ 4. WORKERS INSTALLING AND WELDING STEEL, NO APPROVED DRAWINGS PROVIDED AND NO SSM ON SITE. STOP ALL WORK UN
#39559978X
Dec 9, 2026
PENDING
$1,250
Sep 30, 2026Construction CLASS - 1
AT THE TIME OF INSPECTION OF A 52 STORY MIXED USED BUILDING I OBSERVED CONSTRUCTION ACTIVITY AT EXP 3/ 4. WORKERS INSTALLING AND WELDING STEEL, NO APPROVED DRAWINGS PROVIDED AND NO SSM ON SITE. STOP ALL WORK UN
#39559977Y
Dec 9, 2026
PENDING
$10,000
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (11) · C 1 · B 4 · A 6
IssuedClassViolationCorrect by
Oct 21, 2026BApt 11J · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM IN THE ENTIRE APARTMENT LOCATED AT APT 11J, 11th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 25, 2026
Oct 20, 2026AApt 11J · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES WASH BASIN IN THE BATHROOM LOCATED AT APT 11J, 11th STORY, APARTMENT AT WESTJan 23, 2027
Oct 16, 2026BApt 50K · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CASEMENT OPERATOR AT 2ND WINDOW FROM SOUTH AT WEST IN THE 3rd ROOM FROM NORTH LOCATED AT APT 50K, 50th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 20, 2026
Aug 24, 2026AApt 50K · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 50K, 50th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 27, 2026
Aug 24, 2026AApt 50K · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 50K, 50th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 27, 2026
Aug 24, 2026AApt 50K · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 50K, 50th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 27, 2026
Aug 20, 2026CApt 50K · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WASHBASIN IN THE BATHROOM LOCATED AT APT 50K, 50th STORY, 1st APARTMENT FROM WEST AT NORTHAug 26, 2026
May 26, 2026AApt 50K · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 50K, 50th STORY, 1st APARTMENT FROM WEST AT NORTHAug 29, 2026
May 26, 2026BApt 50K · § 27-2005 HMC: REFIT SWING WINDOW AT NORTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 50K, 50th STORY, 1st APARTMENT FROM WEST AT NORTHJun 30, 2026
May 26, 2026AApt 50K · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL CEILINGS ALL WALLS THROUGHOUT IN THE ENTRANCE LOCATED AT APT 50K, 50th STORY, 1st APARTMENT FROM WEST AT NORTHAug 29, 2026
May 26, 2026BApt 50K · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND WINDOW SASH IN THE BATHROOM LOCATED AT APT 50K, 50th STORY, 1st APARTMENT FROM WEST AT NORTHJun 30, 2026

Issued in the last 120 days

DateSourceWhatNow
Oct 21, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM IN THE ENTIRE APARTMENT LOCATED AT APT 11J, 11th STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Oct 20, 2026HPD A§ 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES WASH BASIN IN THE BATHROOM LOCATED AT APT 11J, 11th STORY, APARTMENT AT WESTOpen
Oct 16, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CASEMENT OPERATOR AT 2ND WINDOW FROM SOUTH AT WEST IN THE 3rd ROOM FROM NORTH LOCATED AT APT 50K, 50th STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Sep 30, 2026ECBConstruction: AT THE TIME OF INSPECTION OF A 52 STORY MIXED USED BUILDING I OBSERVED CONSTRUCTION ACTIVITY AT EXP 3/ 4. WORKERS INSTALLING AND WELDING STEEL, NO APPROVED DRAWINGS PROVIDED AND NO SSM ON SITE. STOP ALL WORK UNOpen
Sep 30, 2026ECBConstruction: AT THE TIME OF INSPECTION OF A 52 STORY MIXED USED BUILDING I OBSERVED CONSTRUCTION ACTIVITY AT EXP 3/ 4. WORKERS INSTALLING AND WELDING STEEL, NO APPROVED DRAWINGS PROVIDED AND NO SSM ON SITE. STOP ALL WORK UNOpen
Aug 24, 2026HPD A§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE FOYER LOCATED AT APT 50K, 50th STORY, 1st APARTMENT FROM SOUTH AT WESTClosed
Aug 24, 2026HPD A§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 50K, 50th STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Aug 24, 2026HPD A§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 50K, 50th STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Aug 24, 2026HPD A§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 50K, 50th STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Aug 20, 2026HPD C§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WASHBASIN IN THE BATHROOM LOCATED AT APT 50K, 50th STORY, 1st APARTMENT FROM WEST AT NORTHOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 3, 2026, 4:13 AM ET. BBL 3001490014.

Look up another building