Brooklyn · Block 1625 · Lot 1 · 11221

585 Quincy Street

4 floors · 9 apartments · 10,020 sq ft · built 1931 · class C7 · owner of record: 585 Kc Properties Llc

56open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 50 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 66 days
Annual
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 781 days
Next cycle year 2028

Open violations

ECB / OATH (6)
IssuedViolationHearingBalance
Nov 5, 2020Construction CLASS - 2
NO LIGHTS UNDER SIDEWALK SHED NOTE:AT TIME OF MY INSPECTION OF AN INACTIVE JOBSITE I OBSERVED THAT THE 8 FIXTURES UNDER SHED IN FRONT OF BLDG WAS NOT ILLUMINATED AFTER DARK THIS CONSTRUCTION,CREATES A HAZARD FO
#35510089N
Nov 26, 2021
IN VIOLATION
$0
Oct 31, 2018Construction CLASS - 1
WORK WITHOUT A PERMIT. NOTED: AT TIME OF INSPECTION, OBSERVED AT THE REAR YARD A MAKE SHIFT SHANTY WAS CONSTRUCTED OUT OF COMBUSTIBLE MATERIALS. REMVOE THE SHANTY OR OBTAIN A PERMIT. REM: COMPLY WITH CODE.
#35364390J
Aug 19, 2019
IN VIOLATION
$0
Oct 31, 2018Unknown CLASS - 1
ELECTRICAL WORK WITHOUT A PERMIT.OBSERVED AT 8:00AM (1)100 AMP SERVICESWITCH INSTALLED IN BASEMENT AND DISCONNECT SWITCH INSTALLED FOR BOILER IN BASEMENT.NO APPLICATION ON FILE FOR ELECTRICAL WORK IN BASEMENT.R
#35354601L
Aug 21, 2019
IN VIOLATION
$0
Oct 31, 2018Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING. NOTED: AT TIME OF INSPECTION, OBSERVED AT THE ROOF, DECORATIVE CORNICE BEING SUPPORTED BY A PIECE OF 8 X 8 LUMBER NEEDS TO BE REPLACED OR REPAIRED. REM: COMPLY WITH CODE.
#35364391L
Aug 21, 2019
IN VIOLATION
$0
Oct 31, 2018Unknown CLASS - 1
UNAPPROVED,UNSAFE,UNSUITABLE ELECTRICAL EQUIPMENT DEVICES APPARATUS APPLIANCES MATERIALS OR WIRING IN USE.DEFECTIVE ELECTRICAL FIXTURES THROUGHOUT APARTMENT.(2)AND EXPOSE ELECTRICAL WIRING THROUGHTOUT BASEMENT
#35354602N
Aug 21, 2019
IN VIOLATION
$0
Jan 3, 2006Boilers Hazardous
51/50A/50B. 50A-COVER MISSING ON MAN. RESET PRESSURE CONTROL. 50B-VALVES MISSING ON GAUGE GLASS VALVES. 51-PICK UP 86 PARTS PER MILLION CO ON FRONT OF BOILER I SHUT BOILER.
#32047111J
Feb 27, 2006
IN VIOLATION
$0
DOB (27)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#09847
DOB VIOLATION - ACTIVE
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#08786
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#37903
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
#17794
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#19470
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#39428
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#13388
DOB VIOLATION - ACTIVE
Jul 21, 2021CONSTRUCTION
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTROL NO.322124 ISSUED ON 04/23/2020 AFTER A 3-ALARM FIRE TOOK PLACE AT THE PROPERTY ON 04/20/2020.THIS ORDER REQ'D THAT STRUCTRL REPR WORK PERMIT BE OBT'D NO LATER THAN 05/29/2020.AS OF 07/21/2021,NO STRUCTRL REPR PERMT HAS BEEN OBT'D TO RPR THE BLDG.CM
#FEU30301FF
DOB VIOLATION - ACTIVE
Apr 23, 2020CONSTRUCTION
FAILURE TO MAINTAIN-BLDG SUFFERED FIRE DMG ON 4/20/20.ROOF&ROOF JOISTS ABOVE UNIT#7@4FL SEVERLY DMGD.ROOF ABOVE UNIT#8 SEVERAL HOLES,ORNAMNTL METAL @EXP1&2-SEVERLY DMGD & AT RISK OF COLLAPSE ONTO PUBLIC SIDEWALK UNITS 7&8 INTER DMG,UNITS@1,2&3 FLS WATER DMG.THRUOUT.OWNR ENGAGE NYPE &CONTRCT-EVAL ENT
#FEU30301FF
DOB VIOLATION - ACTIVE
Apr 20, 2020CONSTRUCTION
EMERG WORK-FIRE4/20/20-SEVERAL UNITS SUFFRD FIRE DMG ROOF&ROOF JOISTS ABOV UNIT#7-4FL,ROOF ABOV UNIT#8 SEVRL HOLES,EXP1&2 ORNAMENTL METAL CORNICE SEVRLY DMGD&AT RISK OF COLLAPSE ONTO PUBLC SIDEWLK.OWNR IMMED ENGAGE NYSPE&CONTRCT.INSTAL SWS ALNG EXP1&2 EXTND 5'BEYND PROP LINES& SEAL&WATER TITE ROOF O
#FEU30301FF
DOB VIOLATION - ACTIVE
Apr 20, 2020CONSTRUCTION
PREMISE RENDERED NON COMPLIANT DUE TO FIRE LEAVING ROOF OPEN WITH HAZARD FROM DAMGE TO CORNICE
#CER01LP
DOB VIOLATION - ACTIVE
Nov 8, 2019LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#08228
DOB VIOLATION - ACTIVE
Jan 23, 2019FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00309
DOB VIOLATION - ACTIVE
Jan 23, 2019FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00307
DOB VIOLATION - ACTIVE
Jan 23, 2019FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00308
DOB VIOLATION - ACTIVE
Jan 23, 2019FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00310
DOB VIOLATION - ACTIVE
Feb 13, 2004LOCAL LAW 62/91 - BOILERS

#22474
DOB VIOLATION - ACTIVE
Mar 19, 2003LOCAL LAW 62/91 - BOILERS

#15778
DOB VIOLATION - ACTIVE
Mar 26, 2002LOCAL LAW 62/91 - BOILERS

#17002
DOB VIOLATION - ACTIVE
Feb 27, 2001LOCAL LAW 62/91 - BOILERS

#16007
DOB VIOLATION - ACTIVE
Feb 7, 2000LOCAL LAW 62/91 - BOILERS

#16498
DOB VIOLATION - ACTIVE
Mar 16, 1999LOCAL LAW 62/91 - BOILERS

#16258
DOB VIOLATION - ACTIVE
May 4, 1998LOCAL LAW 62/91 - BOILERS

#27686
DOB VIOLATION - ACTIVE
Sep 16, 1997LOCAL LAW 62/91 - BOILERS

#221470
DOB VIOLATION - ACTIVE
Feb 10, 1997LOCAL LAW 62/91 - BOILERS

#21014
DOB VIOLATION - ACTIVE
Aug 29, 1995LOCAL LAW 62/91 - BOILERS

#38182
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#38795
DOB VIOLATION - ACTIVE
DOB NOW Safety (23)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 3)
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Sep 23, 2024Boiler LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
Nov 8, 2019Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
Jan 23, 2019AEUHAZ FTC-AEU-HAZ
Active
Jan 23, 2019AEUHAZ FTC-AEU-HAZ
Active
Jan 23, 2019AEUHAZ FTC-AEU-HAZ
Active
Jan 23, 2019AEUHAZ FTC-AEU-HAZ
Active
Feb 13, 2004Boiler LL6291
Active
Mar 19, 2003Boiler LL6291
Active
Mar 26, 2002Boiler LL6291
Active
Feb 27, 2001Boiler LL6291
Active
Feb 7, 2000Boiler LL6291
Active
Mar 16, 1999Boiler LL6291
Active
May 4, 1998Boiler LL6291
Active
Sep 16, 1997Boiler LL6291
Active
Feb 10, 1997Boiler LL6291
Active
Aug 29, 1995Boiler LL6291
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 5:24 PM ET. BBL 3016250001.

Look up another building