| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 34,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 185 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 185 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 795 days | Next cycle year 2028 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-13 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 21, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:THERE IS ALOOK IN THE ROOF AREA ABOVE THE EXIT DOORS AT EXIT#6 WHICH IS DAMAGINGTHE WALLS AND CEILING FROM WATER DAMAGE.REM:REPAIR/REPLACE FIX LEAK,RE #35727554R | Aug 20, 2026 POP/IN-VIO | $0 |
| Apr 21, 2026 | Construction CLASS - 2 REISSUE#35691955X FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:THE DOORS AT RM#109 NEED TO DO REPLACED.VERY OLD AND BEYOND REPAIR.CRACKED,SPLIT,BROKEN TO THE EXTENT THEY CANNOT BE USED.DON'T OPEN #35727551L | Aug 20, 2026 POP/IN-VIO | $0 |
| Apr 21, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:IN ROOM#7(UPPER LEVEL)THE ROOF ABOVE IS LEAKING WHEN RAIN FALLS.DAMAGE TO WALLS AND CEILING AT THE CORNER OF THE ROOM AGAINST THE OUTSIDE WALL.REM:REP #35727555Z | Aug 20, 2026 POP/IN-VIO | $0 |
| Apr 21, 2026 | Construction CLASS - 2 REISSUE#35691954Y FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:THERE IS VERY OBVIOUS WATER DAMAGE ON WALLS AND CEILING IN THELIBRARY.MOSTLY THE UPPER SECTION OF THE WALL NEAR THE EXIT SIGN.REM:RE #35727553P | Aug 20, 2026 POP/IN-VIO | $0 |
| Apr 21, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:THERE ARE 2 EXHAUST FANS MOUNTED ON THE ROOF THAT ARE NOT WORKING.THESE 2 EXHAUST FANS PROVIDE THE VENTILATION FOR THE BATHROOMS ON THE 2ND AND 3RD FL #35727552N | Aug 20, 2026 POP/IN-VIO | $0 |
| Apr 9, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: THE DOORS AT RM #109 NEED TO BE REPLACED. THEY ARE VERY OLD AND BEYOND REPAIR.NORMAL OPERATION IS IMPOSSIBLE, CAN'T OPEN OR CLOSE. REMEDY: REPAIR/RE #35691955X | Jul 15, 2025 POP/IN-VIO | $0 |
| Apr 9, 2025 | Construction CLASS - 2 RE-ISSUE #35674606N. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: WATER DAMAGE IS VERY OBVIOUS IN THE LIBRARY. MOSTLY THE UPPER WALL NEAR EXIT SIGN GETS WORSE WITH EACH RAINS. REMEDY: REPAIR/RE #35691954Y | Jul 15, 2025 POP/IN-VIO | $0 |
| Mar 26, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:IN THE LIBRARY,RM#4,THERE IS WATER DAMAGE AT THE UPPER WALL(LEFT OF EXIT SIGN)WITH EACH RAIN THE DAMAGE GETS WORSE.SOURCE OF THIS LEAK NEEDS TO BE FOA #35674606N | May 3, 2024 POP/IN-VIO | $0 |
| Feb 23, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3;27-345. NOTE AT CELLAR LEVEL IN ELECTRICAL ROOM NO FIRE STOPPING AROUND PIPES PENETRATING THRU THE WALLS. REMEDY: PROVIDE & MAINT #35560820Z | Jul 7, 2021 DEFAULT | $3,125 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
None open.