7 floors · 36 apartments · 23,827 sq ft · built 1910 · class D6 · owner of record: 58 East Partners, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 44 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 60 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 775 days | Next cycle year 2028 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $114,250 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 827 days | Filing window not open yet |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-28 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 5, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING EXTERIOR WALLS/FACADE AND APPURTENACES.NOTE:AT THE TIME OF INSPECTION OBSERVED AT EXPOSURE 1 SOUTH ELEVATION CRACK WINDOW SILL 4 FLOOR.SPALLING BRICKS AT 2ND FLOOR AND DAMAGED FACAD #35577784L | Aug 11, 2022 IN VIOLATION | $1,513 |
| Apr 23, 2021 | Construction CLASS - 1 FAILURE TO REPAIR SWARMP CONDITIONS IN A TIMELY MANNERS.OWNER FAILED TO REPAIR "SPALLING BRICKS,CRACKED WINDOW SILL AND BRICK LOVING ON DOORLINTEL" WITH IN THE TIME FRAME RECOMMENDED BY QEWI,QEWI GAD ASHOORI IN #35559637M | Sep 2, 2021 IN VIOLATION | $2,500 |
| Nov 8, 2013 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN A CODE COMPLAINT MANNER. AT TIME OF INSPECTION I OBSERVED GAS METERS & GAS PIPING INSTALLED IN PUBLIC HALLWAYS. AS PER NYC BC (14.13.3) C26-135.0;P115.6,& FGC-E.2.2 GAS METERS & GAS #35008835M | Feb 7, 2014 IN VIOLATION | $0 |
| Mar 5, 2007 | Construction Non-Hazardous FAILURE TO MAINTAIN INTERIOR BLDG.DEFECTS NOTED:IN APT 3E KITCHEN,BEDRMS & BATHRM FLOOR SLOPPING.APPROX 2" TO 3" ALSO NOTED INTERIOR PARTITION WALL SEPARATING BEDROOM & KITCHEN VERTICAL CRACK ALONG THE BEDROOM #34558430Y | Dec 6, 2007 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jul 19, 2017 | CONSTRUCTION THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED FOR APPLICATION/ PERMIT#122787118 FOR INTENT TO REVOKE APPROVALS AND PERMITS. STOP ALL WORK AND MAKE SITE SAFE. PROVIDE APPROPRIATE INFORMATION TO BOROUGH OF FICE #0305HM | DOB VIOLATION - ACTIVE |
| Jul 19, 2017 | CONSTRUCTION THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED FOR APPLICATION/ PERMIT#122855801 FOR INTENT TO REVOKE APPROVALS AND PERMIT. STOP ALL W ORK IMMEDIATELY AND MAKE SITE SAFE. PROVIDE INFORMATION TO BOROUGH OFF ICE #0307HM | DOB VIOLATION - ACTIVE |
| Jul 19, 2017 | CONSTRUCTION THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED FOR APPLICATION/ PERMIT#122787145 FOR INTENT TO REVOKE APPROVALS AND PERMITS. STOP ALL WORK IMMEDIATELY AND MAKE SITE SAFE. PROVIDE APPROPRIATE INFORMATION T O THE BOROUGH OFFICE #0306HM | DOB VIOLATION - ACTIVE |
| Dec 31, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013 #00384 | DOB VIOLATION - ACTIVE |
| Mar 16, 1999 | LOCAL LAW 62/91 - BOILERS #00985 | DOB VIOLATION - ACTIVE |
| Mar 18, 1993 | LOCAL LAW 62/91 - BOILERS #11727 | DOB VIOLATION - ACTIVE |
| May 22, 1990 | ELECTRIC SIGNS #STA6M | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Dec 31, 2013 | Facades FISPNRF FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013 | Active |
| Mar 16, 1999 | Boiler LL6291 | Active |
| Mar 18, 1993 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 31, 2017 | B | Apt 7B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 7B, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 5, 2017 |
| May 31, 2017 | B | Apt 7B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 7B, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 5, 2017 |
| Jun 5, 2008 | B | Apt 6A · D26-10.01, 10.05 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE 6 STY FRONT EAST APT 6A. , SECTION '' '' | Jul 10, 2008 |
| Jun 5, 2008 | B | Apt 5E · D26-10.01, 10.05 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE AT 5 STY REAR EAST APT 5E. LOCATED AT APT 5E | Jul 10, 2008 |
| Jun 5, 2008 | B | Apt 2B · D26-10.01 ADM CODE PROPERLY SECURE THE LOOSE DOOR 2ND STY FRONT WEST APT 2B BATHROOM. , SECTION '' '' | Jul 10, 2008 |
| Jun 5, 2008 | B | Apt 3D · D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING 3RD STY REAR APT 3D AT BATHROOM. , SECTION '' '' | Jul 10, 2008 |
| Jun 5, 2008 | B | Apt 3D · D26-10.01, 10.05 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE 3RD STY REAR APT 3D. , SECTION '' '' | Jul 10, 2008 |
| Jun 5, 2008 | B | Apt 3RD · D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING THROUGHOUT APT 3RD STY REAR WEST APT 3D. , SECTION '' '' | Jul 10, 2008 |
| Jun 5, 2008 | C | Apt 3D · D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING BATHROOM 3RD STY REAR WEST APT 3D ER1. LOCATED AT APT 3D | Jun 11, 2008 |
| Jun 5, 2008 | A | Apt 2A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING 2 STY SOUTHEAST APT 2A AT PRIVATE HALL. , SECTION '' '' | Sep 8, 2008 |
| Jun 5, 2008 | B | Apt 2B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BATHROOM TILE WALLS & FLOOR 2ND STY FRONT WEST APT 2B. , SECTION '' '' | Jul 10, 2008 |
| Jun 5, 2008 | B | Apt 6D · D26-10.01, 10.05 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE 6 STY REAR APT 6D. , SECTION '' '' | Jul 10, 2008 |
| Jun 5, 2008 | B | Apt 2E · D26-10.01, 10.05 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE 2 STY REAR EAST APT 2E. , SECTION '' '' | Jul 10, 2008 |
| May 5, 1998 | B | Apt 7B · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SOOT ENTRANCE 7 STY SOUTHWEST APT 7B. LOCATED AT APT 7B | Jun 22, 1998 |
| May 5, 1998 | B | Apt 7B · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SOOTED WEST WALLS NORTH ROOM KITCHEN AND CENTER ROOM 7 STY SOUTHWEST APT 7B. LOCATED AT APT 7B | Jun 22, 1998 |
| May 5, 1998 | B | Apt 7B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SHEETROCK CEILING KITCHEN AND CENTER ROOM 7 STY SOUTHWEST APT 7B. LOCATED AT APT 7B | Jun 22, 1998 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 5:05 PM ET. BBL 1004430048.