2 floors · 6,724 sq ft · built 2020 · class E2 · owner of record: 7011 Grand Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1159 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 20, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR 39169733Y., FILE A CERTIFICATE OF CORRECTION #39208510X | Dec 29, 2026 PENDING | $1,250 |
| Feb 25, 2026 | Construction CLASS - 1 AT TIME OF INSPECTION, OBSERVED COMPLETED EXTERIOR WORK AT EXPOSURE 4 DESPITE STOP WORK ORDER ISSUED 04/14/2023 UNDER COMPLAINT #4873588 DIRECTING CESSATION OF ALL EXTERIOR WORK AT THIS EXPOSURE. CONTRARY TO AC #39550908J | May 11, 2027 DEFAULT | $25,000 |
| Dec 8, 2025 | Construction CLASS - 2 NOTED AT TIME OF INSPECTION JOB SITE FENCE IN A STATE OF DISREPAIR, SAFEGUARD PUBLIC AND PROPERTY #39169734X | Feb 17, 2026 DEFAULT | $10,000 |
| Dec 8, 2025 | Construction CLASS - 1 ECB ISSUED FOR FAILURE TO MAINTAIN. DUE TO EXCESSIVE WATER AT CELLAR LEVEL, REPAIR AND/REPLACE #39169733Y | Feb 17, 2026 DEFAULT | $12,500 |
| Mar 4, 2022 | Construction CLASS - 1 3303.2.3 UNPROTECTED POWER LINES(ELECTRICAL)AT TIME OF INSPECTION,I OBSERVED SWS AT EXP1 WITH UNPROTECTED POWER LINES APPROX 5FT FROM SWS.THIS CREATES A HAZARDOUS CONDITION FOR WORKERS AND PERSONEL TO BE ELECTR #35505309J | Aug 30, 2022 DEFAULT | $12,500 |
| Mar 4, 2022 | Construction CLASS - 2 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATION.AT TIME OF INSPECTION AT A 2 STORY NEW BUILDING,OBSERVED SWS AT EXP1 MISSING BRACINGSSTEEL SIDEWALL BRIDGE LEGS WAS OUT OF PLUMB.MISSING BEAM CLAMS AND SCR #35505310R | Sep 15, 2022 DEFAULT | $10,000 |
| Mar 4, 2022 | Construction CLASS - 1 3303.4.1.1 PEDESTRIAN SIDEWALK MAINTANANCE.AT TIME OF INSPECTION AT A 2 STORY NEW BUILDING,OBSERVED AT EXP1 PUBLIC SIDEWALK SEVERELY CRACKEDAND UNEVEN.THIS CONDITION CREATES TRIPPING HAZARD FOR PEDESTRIAN AND W #35505311Z | Sep 15, 2022 DEFAULT | $12,500 |
| Dec 9, 2020 | Construction CLASS - 2 JOBSITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION.AT TIME OF INSPECTION.I OBSERVED THAT JOBSITE FENCE WAS LEANING AT EXPO#1 AN MISSING PANELS AT EXPO#2.ALSO AT EXPO#2 PANELS WERE NOT PAINTED HU #35511284N | Mar 2, 2021 DEFAULT | $2,500 |
| Dec 9, 2020 | Construction CLASS - 1 PROVISION OF LAW:BC3301.6.DESIGN DRAWINGS-TEMPORARY PLATFORM.AT TIME OF MY INSPECTION I OBSERVE TWO TEMPORARY PLATFORMS ON OF THE PLATFORM WAS STACKED WITH CMV BLOCKS.UPON REQUEST OF DESIGN DRAWING FOR PLATFORM #35511285P | Mar 2, 2021 DEFAULT | $6,250 |
| Oct 3, 2019 | Construction CLASS - 2 JOBSITE FENCE NOT CONSTRUCT PURSUAT TO SUBSECTION.AT TIME OF MY INSPECTION OF A NEW 2 STORIE BUILDING WORK YET TO BEGIN,I OBSERVED THE JOBSITE FENCE AND GATES WERE LEANING OUT ONTO THE SIDEWALK APPROX 2FT TOP T #35456017J | Mar 10, 2020 IN VIOLATION | $400 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 20, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR 39169733Y., FILE A CERTIFICATE OF CORRECTION | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 11:16 PM ET. BBL 4026110309.