3 floors · 377,896 sq ft · built 1960 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-15 (Accepted). Agency page | Dec 31, 2026 in 63 days | 4 of 4 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 377,896 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 184 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 184 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 428 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 6882). Agency page | Dec 31, 2032 in 2255 days | Next due 2032 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 7, 2026 | Construction CLASS - 2 REISSUED ECB#35721244Y FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT BOILER ROOM WATER PENETRATION THROUGH FOUNDATION AND FLOOR SLAB.REM:REPAIR AND/OR REPLACE. #35732835J | Jul 15, 2026 POP/IN-VIO | $0 |
| May 7, 2026 | Construction CLASS - 2 REISSUED ECB#35721248L EXIT DOOR NOT SELF-CLOSING.NOTED EXIT DOORS NOTSELF-CLOSING AT:EXIT#16,EXIT#18.REM:REPAIR/REPLACE DOOR. #35732832Y | Jul 15, 2026 POP/IN-VIO | $0 |
| May 7, 2026 | Construction CLASS - 2 REISSUED ECB#35721243M FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED SMOKE DOORS NOT CLOSING PROPERLY AT:CLASSROOM#109,BY EXIT#18,2ND FLOOR STAIRS B,E,F,I;3RD FLOOR STAIRS A,B,C,D,E,G,H,L,M.REM:RE #35732836L | Jul 15, 2026 POP/IN-VIO | $0 |
| May 7, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED LOADING DOCK IN DISREPAIR-WATER LEAKING INTO SPACE BELOW.REM:REPAIR AND/OR REPLACE. #35732837N | Jul 15, 2026 POP/IN-VIO | $0 |
| May 7, 2026 | Construction CLASS - 2 REISSUED ECB#35721246H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED NO GUARDRAILS AT ALL ROOF PARAPET WALLS.REM:REPAIR AND/ORREPLACE. #35732834H | Jul 15, 2026 POP/IN-VIO | $0 |
| May 7, 2026 | Construction CLASS - 2 REISSUED ECB#35721247J FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED WATER DAMAGED CEILINGS AT CLASSROOMS#219 AND 1ST FLOOR CORRIDOR BY CAFETERIA.REM:REPAIR AND/OR REPLACE. #35732833X | Jul 15, 2026 POP/IN-VIO | $0 |
| May 7, 2026 | Construction CLASS - 2 REISSUED ECB#35721249N FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBIC CORRIDORS PER BC 1006.1;27-381.NOTED EMERGENCY LIGHTS NOT WORKING AT 1ST FLOOR STAIR #35732831M | Jul 15, 2026 POP/IN-VIO | $0 |
| May 7, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED CRUMBLING/MISSING CONCRETE AT STEP STAIRS TO ELECTRICAL ROOM.REM:REPAIR AND/OR REPLACE. #35732838P | Jul 15, 2026 POP/IN-VIO | $0 |
| Jul 22, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. LACK OF EMERGENCY LIGHTING FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-542. NOTED: EMERGENCY LIGHTS THAT DID NOT WORK WHEN TESTED WER #35721249N | Sep 8, 2025 POP/IN-VIO | $0 |
| Jul 22, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: 3RD FLR STAIRCASES A AND B, C AND D, E, G AND H, L AND M DOES NOT CLOSE PROPERLY.2ND FLR STAIRCASES B, E AND F, I DOES NOT CLOSE PROPERLY. EXIT 16 A #35721248L | Sep 8, 2025 POP/IN-VIO | $0 |
| Jul 22, 2025 | Construction CLASS - 2 REISSUE #35684809M. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT CELLAR LEVEL BOILER ROOM, WATER PENETRATION THROUGH FOUNDATION WALLS AND FLOOR SLAB. APPROX 1" OF STANDING WATER ACCUMULATED #35721244Y | Sep 8, 2025 POP/IN-VIO | $0 |
| Jul 22, 2025 | Construction CLASS - 2 REISSUE #35684807Z. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: ROOFTOP PARAPET WALLS UNDER REQUIRED 42" HEIGHT, NO GUARDRAILS PROVIDED. REMEDY: REPAIR AND/OR REPLACE. #35721246H | Sep 8, 2025 POP/IN-VIO | $0 |
| Jul 22, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: WATER PENETRATION FROM 3RD FLOOR ROOM 313 SCIENCE LAB TO ROOM 219 CEILING. ALSO WATER PENETRATION FROM ROOF TO 1ST FLR. CEILING IN TWO SPOTS NEAR BO #35721247J | Sep 8, 2025 POP/IN-VIO | $0 |
| Jul 21, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: FIRST FLOOR ROOM "109" DOES NOT CLOSE PROPERLY. HAVE TO FORCE DOOR CLOSE. REMEDY: REPAIR AND/OR REPLACE. #35721243M | Sep 8, 2025 POP/IN-VIO | $0 |
| Aug 26, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT CELLARLEVEL BOILER ROOM, WATER PENETRATION THROUGH FOUNDATION WALLS AND FLOOR SLAB. APPROX 1" OF STANDING WATER ACCUMUALTED IN CORNER BY BOILER RO #35684809M | Oct 2, 2024 POP/IN-VIO | $0 |
| Aug 26, 2024 | Construction CLASS - 2 REISSUE #35672997K. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED ROOFTOP PARAPET WALLS UNDER REQUIRED 42" HEIGHT. NO RAILINGPROVIDED. REMEDY: PROVIDE RAILING/PARAPET HEIGHT. #35684807Z | Oct 2, 2024 POP/IN-VIO | $0 |
| Jul 21, 2023 | Construction CLASS - 2 REISSUE # 35655414P: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER AT ROOFTOP PARAPET FAILURE TO PROVIDE PROPER HEIGHT RAILING AT MINIMUM 42" REMEDY: PROVIDE RAILING TO HEIGHT AT ROOFTOP #35672997K | Oct 31, 2023 POP/IN-VIO | $0 |
| Jun 21, 2022 | Construction CLASS - 2 REISSUE35591777Y(8/24/21) FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER:ROOFTOP PARAPET WALLS UNDER REQUIRED 42"HT REPAIR/PROVIDE RAILS #35655414P | Sep 20, 2022 POP/IN-VIO | $0 |
| Aug 24, 2021 | Construction CLASS - 2 NOV #35500841N.FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT ROOFTOP PARAPET IS LESS THAN 42" IN HEIGHT.REMEDY:PROVIDE RAILING/PARAPET. #35591777Y | Dec 21, 2021 POP/IN-VIO | $0 |
| Jul 13, 2020 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT ROOF TOP,PARAPET IS LESS THAN 42'INCH IN HEIGHT. REMEDY: PROVIDE RAILING/PARAPET. #35500841N | Oct 27, 2020 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #19465 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #19463 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #19464 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #18045 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #18043 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #18044 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #05417 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 11) | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 8:55 AM ET. BBL 4068820001.