3 floors · 2 apartments · 4,200 sq ft · built 1931 · class S2 · owner of record: Jds 57, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 308 days | Required only if the owner doesn't live there |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1160 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-17 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 16, 1997 | LOCAL LAW 62/91 - BOILERS #214237 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 16, 1997 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 21, 2026 | B | Apt 2 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 25, 2026 |
| Jul 21, 2026 | C | Apt 2 · 867 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CONDUCIVE TO PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, G | Aug 16, 2026 |
| Jul 21, 2026 | B | Apt 2 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 25, 2026 |
| Jul 21, 2026 | A | Apt 2 · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 24, 2026 |
| Jul 21, 2026 | B | Apt 2 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 25, 2026 |
| Jul 21, 2026 | A | Apt 2 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 24, 2026 |
| Jul 21, 2026 | B | Apt 2 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 25, 2026 |
| Jul 21, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOORLOCK AT BUILDING ENTRANCE AT 1st PUBLIC HALL FROM EAST, 1st STORY | Aug 25, 2026 |
| Jul 21, 2026 | B | Apt 2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 25, 2026 |
| Jul 21, 2026 | B | Apt 2 · § 27-2026 ADMIN. CODE: REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET , IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 25, 2026 |
| Jul 21, 2026 | B | Apt 2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 25, 2026 |
| Jul 21, 2026 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 25, 2026 |
| Jul 21, 2026 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 25, 2026 |
| Jul 17, 2026 | B | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT SOUTH WALL, AT PUBLIC HALL, 2nd STORY | Aug 21, 2026 |
| Jul 17, 2026 | B | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT THE SOUTH AND NORTH WALLS, AT PUBLIC HALL, 1st STORY | Aug 21, 2026 |
| Jul 17, 2026 | B | § 27-2005, 2007 ADMIN. CODE: REMOVE ALL ENCUMBRANCES CONSISTING OF CARBOARD AND PLASTIC BUCKET ON THE FLOOR, AT PUBLIC HALL, 1st STORY | Aug 21, 2026 |
| Jul 17, 2026 | B | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT NORTH WALL, AT PUBLIC HALL STAIRS, 1st STORY | Aug 21, 2026 |
| Jul 17, 2026 | B | § 27-2005, 2007 ADMIN. CODE: REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ARTICLES THROUGHOUT THROUGHOUT AND OBSTRUCTED APARTMENT ENTRANCE OF THE EGRESS PATH AT PUBLIC HALL, 2nd STORY | Aug 21, 2026 |
| Jul 17, 2026 | B | § 27-2010, 2011, 2012 ADMIN. CODE: REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE FLOOR, AT PUBLIC HALL, 3rd STORY | Aug 21, 2026 |
| Jul 17, 2026 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED | Oct 20, 2026 |
| Date | Source | What | Now |
|---|---|---|---|
| Jul 21, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Jul 21, 2026 | HPD C | 867 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CONDUCIVE TO PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, G | Open |
| Jul 21, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Jul 21, 2026 | HPD A | § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Jul 21, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Jul 21, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Jul 21, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Jul 21, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOORLOCK AT BUILDING ENTRANCE AT 1st PUBLIC HALL FROM EAST, 1st STORY | Open |
| Jul 21, 2026 | HPD B | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Jul 21, 2026 | HPD B | § 27-2026 ADMIN. CODE: REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET , IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Jul 21, 2026 | HPD B | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Jul 21, 2026 | HPD B | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Jul 21, 2026 | HPD B | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Jul 17, 2026 | HPD B | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT SOUTH WALL, AT PUBLIC HALL, 2nd STORY | Open |
| Jul 17, 2026 | HPD B | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT THE SOUTH AND NORTH WALLS, AT PUBLIC HALL, 1st STORY | Open |
| Jul 17, 2026 | HPD B | § 27-2005, 2007 ADMIN. CODE: REMOVE ALL ENCUMBRANCES CONSISTING OF CARBOARD AND PLASTIC BUCKET ON THE FLOOR, AT PUBLIC HALL, 1st STORY | Open |
| Jul 17, 2026 | HPD B | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT NORTH WALL, AT PUBLIC HALL STAIRS, 1st STORY | Open |
| Jul 17, 2026 | HPD B | § 27-2005, 2007 ADMIN. CODE: REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ARTICLES THROUGHOUT THROUGHOUT AND OBSTRUCTED APARTMENT ENTRANCE OF THE EGRESS PATH AT PUBLIC HALL, 2nd STORY | Open |
| Jul 17, 2026 | HPD B | § 27-2010, 2011, 2012 ADMIN. CODE: REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE FLOOR, AT PUBLIC HALL, 3rd STORY | Open |
| Jul 17, 2026 | HPD A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 5:34 AM ET. BBL 3008470141.