Brooklyn · Block 5693 · Lot 4 · 11220

5713 8 Avenue

3 floors · 2 apartments · 3,135 sq ft · built 1920 · class S2 · owner of record: 366 Sw Realty Inc.

4open violations
$18,750ECB/OATH penalties owed
0HPD class C (immediately hazardous)
430dto Gas piping inspection (2027 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 309 days
Required only if the owner doesn't live there
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 430 days
Next cycle year 2027

Open violations

ECB / OATH (9) · $18,750 owed
IssuedViolationHearingBalance
Sep 23, 2026Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39176661J AS OF 9/23/2026., FILE A CERTIFICATE
#39205306P
Dec 2, 2026
PENDING
$1,250
Sep 23, 2026Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39176663N AS OF 9/23/2026., FILE A CERTIFICATE
#39205308Z
Dec 2, 2026
PENDING
$1,250
Feb 9, 2026Construction CLASS - 1
WORK WITHOUT PERMIT: ATOI, OBSERVED A 3-STORY MIXED-USE BUILDING. ON THE 2ND FLOOR, SRO UNIT #203 WAS OBSERVED WITH A THREE-PIECE BATHROOM, INCLUDING INSTALLED WATER SUPPLY AND WASTE LINES. NO PERMIT WAS ISSUED
#39176663N
Dec 14, 2026
$2,500
Feb 9, 2026Construction CLASS - 1
ATOI, OBSERVED A 3-STORY MIXED-USE BUILDING. THE 2ND AND 3RD FLOORS ERECTED FULL-HEIGHT PARTITION WALLS, GIVING RISE TO MULTIPLE SRO UNITS ARRANGED IN A ROOMING-HOUSE LAYOUT. A TOTAL OF 8 SRO UNITS ON THE 2ND F
#39176661J
Dec 14, 2026
PENDING
$2,500
Feb 9, 2026Construction CLASS - 1
AT TIME OF INSPECTION OBSERVED 3 STORY MULTI DWELLING BUILDING 3RD FLOOR FIRE ESCAPE LEADING ONTO THE ROOF OBSTRUCTED, STORED ITEMS REFRIGERATOR AND ARCADE GAME, OBSTRUCTING THE FIRE ESCAPE LADDER LEADING TO TH
#39176665R
Dec 14, 2026
$2,500
Feb 9, 2026Unknown CLASS - 2
ATOI, OBSERVED A 3-STORY MIXED-USE BUILDING. 2ND FLOOR WAS CONVERTED INTO MULTIPLE SRO UNITS, ARRANGED IN A ROOMING LAYOUT WITH KEY-LOCKING MECHANISMS AND NUMBERED DWELLING UNIT ENTRANCE DOORS. UNIT #206 WAS OB
#39176664P
Dec 14, 2026
$2,500
Feb 9, 2026Unknown CLASS - 2
ATOI, OBSERVED A 3-STORY MIXED-USE BUILDING. 2ND FLOOR WAS CONVERTED INTO MULTIPLE SRO UNITS, ARRANGED IN A ROOMING LAYOUT WITH KEY-LOCKING MECHANISMS AND NUMBERED DWELLING UNIT ENTRANCE DOORS. UNIT #205 WAS OB
#39176660H
Dec 14, 2026
$2,500
Feb 9, 2026Plumbing CLASS - 2
ATOI, OBSERVED A 3-STORY MIXED-USE BUILDING. 2ND AND 3RD FLOORS CONVERTED INTO MULTIPLE SRO UNITS, ARRANGED IN A ROOMING-HOUSE LAYOUT WITH KEY-LOCKING MECHANISMS AND NUMBERED DWELLING-UNIT ENTRANCE DOORS. A TOT
#39176666Z
Dec 14, 2026
$1,250
Feb 9, 2026Unknown CLASS - 2
ATOI, OBSERVED A 3-STORY MIXED-USE BUILDING. 2ND FLOOR WAS CONVERTED INTO MULTIPLE SRO UNITS, ARRANGED IN A ROOMING LAYOUT WITH KEY-LOCKING MECHANISMS AND NUMBERED DWELLING UNIT ENTRANCE DOORS. UNIT #203 WAS OB
#39176662L
Dec 14, 2026
$2,500
DOB (0)

None open.

DOB NOW Safety (1)
IssuedViolationStatus
Oct 14, 2026AEUHAZ FTC-AEU-HAZ
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 14, 2026DOB SafetyAEUHAZ: Open
Sep 23, 2026ECBConstruction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39176661J AS OF 9/23/2026., FILE A CERTIFICATEOpen
Sep 23, 2026ECBConstruction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39176663N AS OF 9/23/2026., FILE A CERTIFICATEOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 27, 2026, 5:35 PM ET. BBL 3056930004.

Look up another building