6 floors · 30 apartments · 24,144 sq ft · built 1914 · class C1 · owner of record: West 175th Housing Development Fund Corp Oration
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 412 days | Next cycle year 2027 |
None open.
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 17, 2026 | B | Apt 25 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 25, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Aug 21, 2026 |
| Jul 17, 2026 | B | Apt 25 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 25, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Aug 21, 2026 |
| Dec 16, 2024 | C | Apt 21 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 21, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 11, 2025 |
| Dec 16, 2024 | C | Apt 21 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 21, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 11, 2025 |
| Aug 31, 2023 | B | § 27-2081 ADM CODE DISCONTINUE USE OF ROOMS FOR LIVING, DISCONNECT PLUMBING FIXTURES AND PROPERLY SEAL PIPE CONNECTIONS AT 2 WATER CLOSETS, 2 WASHBASINS, 2 BATH TUBS, SHOWER STALL, AND RESIDENTIAL SINK AT CELLAR | Oct 5, 2023 |
| Aug 31, 2023 | B | § 27-2070 ADM CODE DISCONTINUE UNLAWFUL COOKING SPACE OR FILE PLANS AND APPLICATION WITH THIS DEPARTMENT TO LEGALIZE SAME, IF LAWFULLY FEASIBLE, GAS RANGE AT CELLAR | Oct 5, 2023 |
| Aug 18, 2021 | C | Apt 35 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 35, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Sep 13, 2021 |
| Aug 18, 2021 | C | Apt 35 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 35, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Sep 13, 2021 |
| Jan 7, 2020 | C | Apt 35 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 35, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jan 28, 2020 |
| Mar 28, 2019 | C | Apt 35 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 35, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Apr 18, 2019 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 2:07 PM ET. BBL 1021330028.