Manhattan · Block 2158 · Lot 67 · 10040

570 West 190 Street

5 floors · 29 apartments · 24,805 sq ft · built 1923 · class C1 · owner of record: Gvs Properties Iv, Llc

12open violations
$10,000ECB/OATH penalties owed
3HPD class C (immediately hazardous)
45dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 45 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 45 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 61 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 289 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 410 days
Next cycle year 2027
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-04 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2) · $10,000 owed
IssuedViolationHearingBalance
Apr 9, 2026Construction CLASS - 2
PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. AT TIME OF INSPECTION, I OBSERVED DISLODGED PARAPET PANEL DELAMINATED FROM ITS POSITION, CRACKING OPEN AT THE BASE OF SHED PARAPET WALL. AT EXPOSURE #1 N
#35729626X
Sep 3, 2026
DEFAULT
$10,000
Jan 28, 2013Construction CLASS - 2
FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES. DEFECT NOTED: LOOSEMORTAR JOINTS AND MISSING POINTINGS THRU OUT AT EXP 3 FACADE AND LOOSEMORTAR JOINTS AND MISSING PAINTINGS ON 4TH FLR TO ROOF LEVEL FACADE
#35004172M
Mar 14, 2013
WRITTEN OFF
$0
DOB (2)
IssuedViolationStatus
Apr 9, 2026CONSTRUCTION
FTM BLDG. OBSRVED BULGING LINTEL BRICKS, MULTI LOCATIONS, STEP CRACKS, LOOSE BRICKS, OPEN MORTAR JOINTS AR EXP 1 NORTH ELEVATION, MISSING BRICKS, LOOSE BRICKS, OPEN MORTAR JOINTS, BULGING LINTELS BRICKS, STEP CRACKS MULTI LOCATIONS, AT EXP 4 WEST ELEVATION. REMEDY: OWNER TO REP LACE AND/OR REPAIR
#SR11203YC
DOB VIOLATION - ACTIVE
Mar 19, 2025CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.OBSERVED STEP CRACKS AND BULDGING BRICK WORK IN MULTIPLE LOCATIONS ON EXP1 & 4 AND A T ROOF LEVEL.REMEDY:REPAIR AND/OR REPLACE BUILDING FACADE AND APPURTEN ANCES
#SR11202XN
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
HPD (7) · C 3 · B 4 · A 0
IssuedClassViolationCorrect by
Sep 3, 2026CApt 1E · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTSep 17, 2026
Sep 1, 2026BApt 1E · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTOct 6, 2026
Sep 1, 2026BApt 1E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTOct 6, 2026
Sep 1, 2026BApt 1E · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTOct 6, 2026
Sep 1, 2026BApt 1E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTOct 6, 2026
Oct 22, 2024CApt 5C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTHNov 17, 2024
Oct 22, 2024C§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MORTAR JOINTS AND BRICKS ABOVE 5TH WINDOW HEADER FROM EAST AT SOUTH AT BUILDING FRONT , 5th STORYOct 28, 2024

Issued in the last 120 days

DateSourceWhatNow
Sep 3, 2026HPD C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Sep 1, 2026HPD B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Sep 1, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Sep 1, 2026HPD B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Sep 1, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 16, 2026, 6:48 PM ET. BBL 1021580067.

Look up another building