5 floors · 15 apartments · 14,006 sq ft · built 2025 · class D7 · owner of record: Gw S6 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 46 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 62 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 290 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 777 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 13, 2025 | Unknown CLASS - 2 BC 3309.10_AT TIME OF MY INSPECTION ON ACTIVE JOBSITE OF A 6 STORY NB, I OBSERVED THAT ROOF PROTECTION WAS NOT INSTALLED AS PER CODE EXP#4 ADJACENT PROPERTY/ROOF PROTECTION WAS NOT BUILD AS PER PLAN(NOT FU #39540129L | Mar 17, 2026 IN VIOLATION | $2,500 |
| Mar 27, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED: ACTIVE JOB SITE. FORM WORK AT 4TH FLOOR LEVEL. UPON REVIEW DEPARTMENT RECORD IT APPEAR, STRUCTURAL APPLICATION# B00254135-I1-ST IN CONJUCTION WITH NB# 321091377 WHICH HAS NOT YET #39538425N | Mar 31, 2026 IN VIOLATION | $625 |
| Mar 26, 2025 | Unknown CLASS - 2 AT TIME OF INSPECTION OBSERVED: ACTIVE JOB SITE AT 4TH FL.FORM WORK, CONSTRUCTION REACHED 40' HEIGHT APPROX. NO OVERHEAD PROTECTION AS PER SITE SAFETY PLAN FOR ADJOINING PROPERTIES AT EXPOSURE# 3 AND 4 AT REAR, #39538423J | Jun 4, 2025 IN VIOLATION | $5,000 |
| Mar 26, 2025 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED: GC FAILURE TO PROVIDE ADEQUATE STORAGE ZONE EXPO# 2 MECHANICAL EQUIPMENT GENERATOR AND CONCRETE WASHOUT BOX WITHOUT PROPER ENCLOSURE NO 4' CONTINUES BARRIER AND WIRE SCREEN THE S #39538424L | Jun 4, 2025 IN VIOLATION | $2,400 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 9:51 AM ET. BBL 3024550034.