Manhattan · Block 2243 · Lot 399 · 10034

57 Park Terrace West

6 floors · 51 apartments · 50,117 sq ft · built 1937 · class D4 · owner of record: 57 Park Terr W Owners

10open violations
$26,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
47dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 50,117 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 412 days
Next cycle year 2027
Energy audit and retro-commissioning (2033) Likely applies
Local Law 87 · Calendar year 2033
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2243). Agency page

Dec 31, 2033
in 2604 days
Next due 2033
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-05 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (6) · $26,250 owed
IssuedViolationHearingBalance
Mar 3, 2025Construction CLASS - 2
ATOI OBSERVED ONE WORKER ON COSTRUCTION ACTIVITY IN APTS 1E AND 1D PERMIT# M01080081-I1-GC, PERMIT EXP. ON 01/01/2025, AND NO APPROVED PLAN AVAILABLE AT CONSTRUCTION SITE, ECB VIOLATION ISSUED., OBTAIN ALL PERM
#39140130X
Feb 18, 2027
PENDING
$1,250
Oct 25, 2024Construction CLASS - 1
UPON INSPECTION OBSERVED AT 1FLR - APT.1E, 2-MEN DOING DEMO AS PER DOB DRAWINGS. HOWEVER, DURING THE INSPECTION I NOTED LIGHT FIXTURES REMOVED AT VARIOUS LOCATIONS WITH EXPOSED BX CABLE AND A CONJUNCTION BOX NE
#39128645N
Feb 6, 2025
IN VIOLATION
$1,250
Oct 25, 2024Unknown CLASS - 1
UPON INSP., OBSERVED AT 1FLR - APT 1D & 1E, 2-MEN DOING DEMO AS PER DOB DRAWINGS. HOWEVER, WORKERS CURRENTLY NOT FOLLOWING THAT ALL ALTER., CONSTR., OR PARTIAL DEMO WORK MUST BE PERFORMED INCOMPLIANCE WITH A TE
#39128643J
Feb 6, 2025
IN VIOLATION
$5,000
May 10, 2024Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS# 35666616R ISSUED ON 03/14/2023 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01, COMPLY WITH COMMISSIONER'S ORDE
#39114109M
Jul 18, 2024
DEFAULT
$6,250
Dec 28, 2023Construction CLASS - 1
UNLAWFUL ACTS: FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION# 35666616R ISSUED ON 03/14/23 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. (FAILURE
#39102363J
Oct 24, 2024
DEFAULT
$6,250
Mar 14, 2023Construction CLASS - 1
3303.10 FAILURE TO COMPLY WITH TENANT PROTECTION PLAN.NOTE AT TIME OF INSPECTION,I OBSERVED WORK UNDER THE AFOREMENTIONED JOB NUMBER.THE CONTRACTOR FAILED TO COMPLY WITH THE HEALTH REQUIREMENT SECTION OF THE TP
#35666616R
May 18, 2023
DEFAULT
$6,250
DOB (3)
IssuedViolationStatus
Jan 8, 2025FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00045
DOB VIOLATION - ACTIVE
Jan 8, 2025FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00046
DOB VIOLATION - ACTIVE
Apr 29, 1991ELEVATOR
DEVICE #1P2008
#1300C01
VIOLATION UNSERVED ECB-ACTIVE
DOB NOW Safety (6)
IssuedViolationStatus
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 12)
Active
Jan 8, 2025AEUHAZ FTC-AEU-HAZ
Active
Jan 8, 2025AEUHAZ FTC-AEU-HAZ
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)