6 floors · 51 apartments · 50,117 sq ft · built 1937 · class D4 · owner of record: 57 Park Terr W Owners
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 50,117 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 412 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2243). Agency page | Dec 31, 2033 in 2604 days | Next due 2033 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-05 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 3, 2025 | Construction CLASS - 2 ATOI OBSERVED ONE WORKER ON COSTRUCTION ACTIVITY IN APTS 1E AND 1D PERMIT# M01080081-I1-GC, PERMIT EXP. ON 01/01/2025, AND NO APPROVED PLAN AVAILABLE AT CONSTRUCTION SITE, ECB VIOLATION ISSUED., OBTAIN ALL PERM #39140130X | Feb 18, 2027 PENDING | $1,250 |
| Oct 25, 2024 | Construction CLASS - 1 UPON INSPECTION OBSERVED AT 1FLR - APT.1E, 2-MEN DOING DEMO AS PER DOB DRAWINGS. HOWEVER, DURING THE INSPECTION I NOTED LIGHT FIXTURES REMOVED AT VARIOUS LOCATIONS WITH EXPOSED BX CABLE AND A CONJUNCTION BOX NE #39128645N | Feb 6, 2025 IN VIOLATION | $1,250 |
| Oct 25, 2024 | Unknown CLASS - 1 UPON INSP., OBSERVED AT 1FLR - APT 1D & 1E, 2-MEN DOING DEMO AS PER DOB DRAWINGS. HOWEVER, WORKERS CURRENTLY NOT FOLLOWING THAT ALL ALTER., CONSTR., OR PARTIAL DEMO WORK MUST BE PERFORMED INCOMPLIANCE WITH A TE #39128643J | Feb 6, 2025 IN VIOLATION | $5,000 |
| May 10, 2024 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS# 35666616R ISSUED ON 03/14/2023 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01, COMPLY WITH COMMISSIONER'S ORDE #39114109M | Jul 18, 2024 DEFAULT | $6,250 |
| Dec 28, 2023 | Construction CLASS - 1 UNLAWFUL ACTS: FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION# 35666616R ISSUED ON 03/14/23 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. (FAILURE #39102363J | Oct 24, 2024 DEFAULT | $6,250 |
| Mar 14, 2023 | Construction CLASS - 1 3303.10 FAILURE TO COMPLY WITH TENANT PROTECTION PLAN.NOTE AT TIME OF INSPECTION,I OBSERVED WORK UNDER THE AFOREMENTIONED JOB NUMBER.THE CONTRACTOR FAILED TO COMPLY WITH THE HEALTH REQUIREMENT SECTION OF THE TP #35666616R | May 18, 2023 DEFAULT | $6,250 |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2025 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00045 | DOB VIOLATION - ACTIVE |
| Jan 8, 2025 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00046 | DOB VIOLATION - ACTIVE |
| Apr 29, 1991 | ELEVATOR DEVICE #1P2008 #1300C01 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Jan 8, 2025 | AEUHAZ FTC-AEU-HAZ | Active |
| Jan 8, 2025 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 2:21 PM ET. BBL 1022430399.