Queens · Block 8276 · Lot 620 · 11362

57-40 Marathon Parkway

3 floors · 75,600 sq ft · built 1964 · class W1 · owner of record: Nyc Department Of Education

8open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
62dto Energy audit and retro-commissioning (2026)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 62 days
Keep the report on file (not filed with DOB)
Energy audit and retro-commissioning (2026) Likely applies
Local Law 87 · Calendar year 2026
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 8276). Agency page

Dec 31, 2026
in 62 days
Due this year
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-17 (Accepted). Agency page

Dec 31, 2026
in 62 days
2 of 2 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 75,600 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 183 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 183 days
Annual filing
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 427 days
Next cycle year 2027

Open violations

ECB / OATH (3)
IssuedViolationHearingBalance
May 13, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED SEVERAL CLASSROOMS DOORS NOT SELF-CLOSING THROUGHOUT SCHOOL(GROUND FLOOR TO SECOND FLOOR). REMEDY: REPAIR AND/OR REPLACE.
#35732856Z
Jun 18, 2026
POP/IN-VIO
$0
May 13, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NO FIRE STOPPING PER BC 712.3; 27-345. NOTED FIRE STOPPING MISSING AROUND PIPES AT GAS METER ROOM. REMEDY: PROVIDE/MAINTAIN FIRE STOPPING.
#35732858M
Jun 18, 2026
POP/IN-VIO
$0
May 13, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED SPALLING PLASTER ON WALLS AT CORRIDORS(BOTH SIDES) AT GROUND FLOOR 1ST AND 2ND FLOORS. REMEDY: REPAIR AND/OR REPLACE.
#35732857K
Jun 18, 2026
POP/IN-VIO
$0
DOB (1)
IssuedViolationStatus
Oct 1, 2019RETAINING WALL
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
#01028
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Oct 1, 2019Retaining Walls FTF-RW-INITL
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 30, 2026, 12:59 PM ET. BBL 4082760620.

Look up another building