2 floors · 2 apartments · 3,300 sq ft · built 1899 · class S2 · owner of record: 569 Bay Ridge Parkway Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Required only if the owner doesn't live there |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 778 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 16, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN EGRESS, BLOCKED STAIRCASE. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35673305P ISSUED ON 7/17/2023 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 2 #35677196N | Jun 1, 2026 DEFAULT | $3,125 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 6, 2024 | B | Apt 1FLOOR · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... EXCEEDED 8 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 1FLOOR, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 17100919 ISSUED 06-JUL-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-20 | Dec 11, 2024 |
| Jul 8, 2024 | B | Apt 1FLOOR · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1FLOOR, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 12, 2024 |
| Jul 8, 2024 | B | Apt 1FLOOR · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 1FLOOR, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 12, 2024 |
| Jul 8, 2024 | B | Apt 1FLOOR · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 1FLOOR, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 12, 2024 |
| Jul 8, 2024 | B | Apt 1FLOOR · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1FLOOR, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 12, 2024 |
| Jul 8, 2024 | B | Apt 1FLOOR · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT EAST WALL IN THE BATHROOM LOCATED AT APT 1FLOOR, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 12, 2024 |
| Jul 8, 2024 | B | Apt 1FLOOR · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 1FLOOR, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 12, 2024 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 12:25 PM ET. BBL 3059310060.