5 floors · 30 apartments · 25,910 sq ft · built 1923 · class C1 · owner of record: Heights Estates
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 50 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 66 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 25,910 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 171 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 171 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 294 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 415 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-29 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 30, 2009 | Construction CLASS - 1 SEC.28-201.1 FAILURE TO COMPLY WITH ORDER OF THE COMMISSIONERS IN THAT OCCUPANCY OF PREMISES IS CONTRARY TO VACATE ORDER 16/2009 ISSUED 1/20/09 NOTED CONST OCCUPANCY OF AT LEAST 1 ROOM W/O A WINDOW FULL BATH & #34766057L | Apr 28, 2011 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jan 20, 2009 | CONSTRUCTION WORK W/OUT PERMIT #ERRH01 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 15, 2026 | B | Apt 2F · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 19, 2026 |
| Oct 15, 2026 | B | Apt 2F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND THE SINK FIXTURE IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 19, 2026 |
| Oct 15, 2026 | B | Apt 2F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 19, 2026 |
| Oct 15, 2026 | B | Apt 2F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER CABINET SHELVES AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 19, 2026 |
| Oct 8, 2026 | B | Apt 2F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 12, 2026 |
| Oct 8, 2026 | B | Apt 2F · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 12, 2026 |
| Oct 8, 2026 | B | Apt 2F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 12, 2026 |
| Oct 8, 2026 | B | Apt 2F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 12, 2026 |
| Oct 8, 2026 | B | Apt 2F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 12, 2026 |
| Oct 8, 2026 | B | Apt 2F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 12, 2026 |
| Sep 22, 2026 | C | Apt 2F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 28, 2026 |
| Sep 22, 2026 | B | Apt 2F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE HARDWOOD FLOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 27, 2026 |
| Jul 17, 2025 | B | Apt 2A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THEN 10 SQ FT OF MOLD ON THE NORTH WALL, THE SOUTH WALL, THE WEST WALL, THE EAST WALL AND THE CEILING IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Aug 21, 2025 |
| Mar 12, 2025 | C | Apt 2A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 30 SQ. FT. AT THE NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Apr 7, 2025 |
| Mar 12, 2025 | C | Apt 2A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 30 SQ. FT. AT THE WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Apr 7, 2025 |
| Dec 19, 2023 | A | Apt BASEME · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION THE CEILING IN THE BATHROOM LOCATED AT APT BASEME, 1st APARTMENT FROM NORTH AT EAST | Mar 23, 2024 |
| May 26, 2015 | B | Apt 2C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING , EAST, AND WEST WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 30, 2015 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 15, 2026 | HPD B | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Oct 15, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND THE SINK FIXTURE IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Oct 15, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Oct 15, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER CABINET SHELVES AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Oct 8, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Oct 8, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Oct 8, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Oct 8, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Oct 8, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Oct 8, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Sep 22, 2026 | HPD C | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Sep 22, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE HARDWOOD FLOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 3:37 AM ET. BBL 1021610100.