1 floors · 13,500 sq ft · built 1925 · class O7 · owner of record: C J Williams Funeral Realty
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 68 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-01 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 22, 2026 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED AT EXP.1 (FRONT OF BUILDING) FACADE BULGING AND SHIFTED AT PARAPET LEVEL MULTIPLE LOCATIONS. ALSO CRACKS AND SHIFTED BRICKS AT MULTIPLE LOCATION OF EXP.1 AND EXP.2 (LEFT SIDE OF B #39202349L | Jan 29, 2027 PENDING | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Aug 28, 2026 | CONSTRUCTION ENGINEERS REPORT REQUIRED DUE TO BULGING/SHIFTED FACADE AND CRACKS AT EXP.1 AND EXP.2 #26-02128 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #18669 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #38952 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 31, 2026 | DOB | IMMEDIATE EMERGENCY: REMEDY: INSTALL APPROXIMATELY 175 LINEAR FEET OF SIDEWALK SHED AS FOLLOWS: 145 LINEAR FEET ALONG EXPOSURE 1 (BROADWAY) TO RETURN APPROXIMATELY 30 LINEAR FEET ALONG EXPOSURE 2 (W 233 STREET) TO SAFEGUARD THE PUBLIC | Closed |
| Aug 28, 2026 | DOB | CONSTRUCTION: ENGINEERS REPORT REQUIRED DUE TO BULGING/SHIFTED FACADE AND CRACKS AT EXP.1 AND EXP.2 | Open |
| Aug 22, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED AT EXP.1 (FRONT OF BUILDING) FACADE BULGING AND SHIFTED AT PARAPET LEVEL MULTIPLE LOCATIONS. ALSO CRACKS AND SHIFTED BRICKS AT MULTIPLE LOCATION OF EXP.1 AND EXP.2 (LEFT SIDE OF B | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 9:04 AM ET. BBL 2032670104.