2 floors · 4 apartments · 3,280 sq ft · built 1923 · class C3 · owner of record: Esther Heller
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 68 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 68 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 84 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 312 days | Registered through 2027-09-01 |
None open.
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Feb 26, 2015 | C | Apt 1L · SECTION 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 6; WG TO REPLACE = 0; WG TO REPAIR = 0; LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH | Mar 26, 2015 |
| Feb 26, 2015 | C | Apt 1L · SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT EAST 1 AND EAST 2 CLOSET WALLS IN THE 1st ROOM FROM NORTH LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 6, 2015 |
| Feb 26, 2015 | C | Apt 1L · SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE RADIATOR AIR VALVE IN THE 1st ROOM FROM NORTH LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 6, 2015 |
| Feb 26, 2015 | B | Apt 1L · SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 2, 2015 |
| Feb 26, 2015 | B | Apt 1L · SECTION 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 2, 2015 |
| Feb 26, 2015 | C | Apt 1L · SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING, EAST AND SOUTH WALLS APPROXIMATELY 34 SQUARE FEET IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 6, 2015 |
| Feb 26, 2015 | C | Apt 1L · SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT EAST AND WEST WALLS APPROXIMATELY 100 SQUARE FEET IN THE KITCHEN LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 6, 2015 |
| Dec 8, 2014 | C | SECTION 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM .. AT CELLAR | Dec 16, 2014 |
| Dec 5, 2014 | A | Apt 1L · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, CEILING, EAST WALL, WEST WALL IN THE KITCHEN LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 10, 2015 |
| Dec 5, 2014 | A | Apt 1L · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 10, 2015 |
| Dec 5, 2014 | C | Apt 1L · SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 13, 2014 |
| Dec 5, 2014 | A | Apt 1L · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, CEILING, SOUTH WALL IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 10, 2015 |
| Dec 5, 2014 | A | Apt 1L · SECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 10, 2015 |
| Dec 5, 2014 | A | Apt 1L · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, SOUTH WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 10, 2015 |
| Dec 5, 2014 | A | Apt 1L · SECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM NORTH AT EAST WALL, 1st RISER FROM NORTH AT EAST WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 10, 2015 |
| Dec 5, 2014 | C | Apt 1L · SECTION 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY ?11-06(B)(2) 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 1L, 1st | Jan 30, 2015 |
| Dec 5, 2014 | C | Apt 1L · SECTION 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY ?11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 5th ROOM FROM EAST LOCATED AT APT | Jan 30, 2015 |
| Dec 5, 2014 | B | Apt 1L · SECTION 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). INOPERABLE IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 9, 2015 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 4:17 PM ET. BBL 3013250018.