Brooklyn · Block 186 · Lot 31 · 11217

564 Atlantic Avenue

4 floors · 7 apartments · 4,800 sq ft · built 1910 · class C7 · owner of record: 562-4 Atlantic Avenue Partners

12open violations
$3,650ECB/OATH penalties owed
1HPD class C (immediately hazardous)
62dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 62 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 62 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 78 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 306 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1158 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-15 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2) · $3,650 owed
IssuedViolationHearingBalance
Aug 25, 2026Construction CLASS - 2
AT TIME OF INSPECTION OBSERVED SIDEWALK SHED INSTALLED AT EXP# 1 MISSING SWS PARAPET INFORMATION PANEL CONTRARY TO BC 3301.9.2 MISSING INFORMATION PANEL CAN DELAY RESPONSE IN CASE OF AN EMERGENCY NOT HAVING THE
#39558316M
Nov 4, 2026
PENDING
$1,250
Aug 25, 2026Construction CLASS - 2
AT 4:45AM OBSERVED 4 STORY BUILDING WITH SIDEWALK SHED INSTALLED AT EXP# 1 THAT WAS NOT ILLUMINATED AS STIPULATED IN BC3307.6.4.8 CREATES HAZARDOUS CONDITIONS FOR PEDESTRIANS OF SLIPS AND TRIPS DUE TO INADEQUAT
#39558315K
Nov 4, 2026
PENDING
$2,400
DOB (2)
IssuedViolationStatus
Mar 26, 2002LOCAL LAW 62/91 - BOILERS

#13341
DOB VIOLATION - ACTIVE
Feb 10, 1997LOCAL LAW 62/91 - BOILERS

#16693
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Mar 26, 2002Boiler LL6291
Active
Feb 10, 1997Boiler LL6291
Active
HPD (6) · C 1 · B 4 · A 1
IssuedClassViolationCorrect by
Apr 5, 2019A§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTEDJul 9, 2019
Aug 11, 2008B§ 27-2005 ADM CODE FIRE ESCAPE DEFECTIVE. PROPERLY SECURE DROP LADDER SHOE REAR YARD.Sep 15, 2008
Aug 11, 2008BD26-10.01, 10.05 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ENTRANCE TO BULKHEAD ROOF.Sep 15, 2008
Sep 12, 2007B§ 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 100 WATTS. LIGHTS NOT ON.Oct 17, 2007
Sep 12, 2007BApt 2B · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORYOct 17, 2007
Sep 12, 2007C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED TO CELLARSep 18, 2007

Issued in the last 120 days

DateSourceWhatNow
Aug 25, 2026ECBConstruction: AT TIME OF INSPECTION OBSERVED SIDEWALK SHED INSTALLED AT EXP# 1 MISSING SWS PARAPET INFORMATION PANEL CONTRARY TO BC 3301.9.2 MISSING INFORMATION PANEL CAN DELAY RESPONSE IN CASE OF AN EMERGENCY NOT HAVING THEOpen
Aug 25, 2026ECBConstruction: AT 4:45AM OBSERVED 4 STORY BUILDING WITH SIDEWALK SHED INSTALLED AT EXP# 1 THAT WAS NOT ILLUMINATED AS STIPULATED IN BC3307.6.4.8 CREATES HAZARDOUS CONDITIONS FOR PEDESTRIANS OF SLIPS AND TRIPS DUE TO INADEQUATOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 30, 2026, 8:15 PM ET. BBL 3001860031.

Look up another building