Brooklyn · Block 5692 · Lot 40 · 11219

5624 15 Avenue

6 floors · 54 apartments · 59,040 sq ft · built 1939 · class D4 · owner of record: 5614 15th Ave Corp

67open violations
$0ECB/OATH penalties owed
10HPD class C (immediately hazardous)
63dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 63 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 63 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 79 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 59,040 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 184 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 184 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 307 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 428 days
Next cycle year 2027
Energy audit and retro-commissioning (2032) Likely applies
Local Law 87 · Calendar year 2032
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5692). Agency page

Dec 31, 2032
in 2255 days
Next due 2032
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-15 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (3)
IssuedViolationStatus
Jun 30, 2021ELEVATOR

#9028/704261
DOB VIOLATION - ACTIVE
Apr 29, 2021FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2003764
DOB VIOLATION - ACTIVE
Jan 8, 1999CONSTRUCTION
WORK WITHOUT A PERMIT. WORK NOTED: HAVING INSTALLED (1) PARTITION WALL APPROX. 12'X 9' HIGH IN MASTER BEDROOM CREATING 2 BEDROOMS IN APART- MENT (5D). PARTITION ERECTED AT REAR OF APARE
#12RH01
VIOLATION WORK WITHOUT PERMIT - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Apr 29, 2021Energy Grade - LL33 FTP-EN-EGRDEA
Active
HPD (63) · C 10 · B 50 · A 3
IssuedClassViolationCorrect by
Dec 4, 2025B§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING COVERS AT TRASH BINS, IN WASTE COLLECTION AREA, AT CELLARJan 8, 2026
Dec 4, 2025B§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CARBOARD, AND HOUSEHOLD ITEMS AT PUBLIC HALL, 2nd STORYJan 8, 2026
Dec 4, 2025B§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BABY CARRIAGE, AT PUBLIC HALL, 6th STORYJan 8, 2026
May 23, 2024BApt 2C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WESTJun 27, 2024
May 23, 2024BApt 2C · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WESTJun 27, 2024
May 23, 2024BApt 2C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WESTJun 27, 2024
May 23, 2024BApt 2C · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WESTJun 27, 2024
Oct 19, 2023BApt 1H · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 5 SQ FT AT WEST WALL IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 16048435 ISSUED 19-JUN-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27Nov 23, 2023
Oct 19, 2023BApt 2H · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING, APPROXIMATELY 2 SQ FT. IN THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 16054625 ISSUED 12-JUN-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27Nov 23, 2023
Jun 23, 2023BApt 6C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6C, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTHJul 28, 2023
Jun 23, 2023BApt 6D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6D, 6th STORY, 4th APARTMENT FROM EAST AT SOUTHJul 28, 2023
Jun 23, 2023BApt 2H · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM WEST AT NORTHJul 28, 2023
Jun 23, 2023BApt 2D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2D, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTHJul 28, 2023
Jun 23, 2023BApt 1F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1F, 1st STORY, 2nd APARTMENT FROM WEST AT NORTHJul 28, 2023
Jun 23, 2023BApt 2G · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2G, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTHJul 28, 2023
Jun 21, 2023BApt 1H · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM NORTH AT EASTJul 26, 2023
Jun 21, 2023BApt 1H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WALLS INSIDE CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM NORTH AT EASTJul 26, 2023
Jun 21, 2023BApt 1H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM NORTH AT EASTJul 26, 2023
Jun 21, 2023BApt 1H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM NORTH AT EASTJul 26, 2023
Jun 21, 2023AApt 1H · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM NORTH AT EASTSep 24, 2023
Jun 6, 2023BApt 3F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHJul 11, 2023
Jun 6, 2023BApt 6B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTHJul 11, 2023
Jun 6, 2023BApt 6F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6F, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHJul 11, 2023
Jun 6, 2023BApt 6H · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6H, 6th STORY, 4th APARTMENT FROM WEST AT NORTHJul 11, 2023
Jun 6, 2023BApt 5A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHJul 11, 2023
Jun 6, 2023BApt 5H · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5H, 5th STORY, 4th APARTMENT FROM WEST AT NORTHJul 11, 2023
Jun 6, 2023BApt 4B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTHJul 11, 2023
Jun 6, 2023BApt 4D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4D, 4th STORY, 4th APARTMENT FROM EAST AT SOUTHJul 11, 2023
Jun 6, 2023BApt 4F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM WEST AT NORTHJul 11, 2023
Jun 6, 2023BApt 3A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHJul 11, 2023
Jun 6, 2023BApt 3C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3C, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTHJul 11, 2023
Jun 6, 2023BApt 3D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3D, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTHJul 11, 2023
Jun 6, 2023BApt 2F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTHJul 11, 2023
Jun 6, 2023BApt 1D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1D, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTHJul 11, 2023
Jun 6, 2023BApt 1G · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1G, 1st STORY, 3rd APARTMENT FROM WEST AT NORTHJul 11, 2023
May 4, 2023C§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.May 8, 2023
May 4, 2023C§ 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.May 8, 2023
Sep 14, 2021BApt 5J · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 2 SQ FT AT THE WINDOW FRAME FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 14334695 ISSUED 12-MAY-21 HAS BEEN UPGRADED TO CLASOct 19, 2021
Jun 28, 2021BApt 5J · § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE (AIR CONDITIONER AT FIRE ESCAPE WINDOW) IN THE 1st ROOM FROM NORTH LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EASTAug 2, 2021
Mar 17, 2021CApt 6B · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WESTMar 21, 2021
Jan 29, 2021CApt 1J · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ; IN THE ENTIRE APARTMENT LOCATED AT APT 1J, 1st STORY, 5th APARTMENT FROM NORTH AT EASTFeb 2, 2021
Jan 27, 2021BApt 5J · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF AIR CONDITIONER UNIT INSTALLED IN THE FIRE ESCAPE WINDOW IN THE 1st ROOM FROM NORTH LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EASTMar 3, 2021
Nov 4, 2020C§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.Nov 8, 2020
Nov 2, 2020CApt 5J · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .... IN THE ENTIRE APARTMENT LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 6, 2020
Nov 2, 2020CApt 4F · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM NORTH AT EASTNov 6, 2020
Nov 2, 2020CApt 6G · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 3rd APARTMENT FROM NORTH AT EASTNov 6, 2020
Jul 21, 2020C§ 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.Jul 25, 2020
Sep 4, 2018BApt 5B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHOct 9, 2018
Jun 7, 2016BApt 1H · SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING AT CLOSET IN THE 1st PRIVATE HALLWAY FROM NORTH LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM WEST AT NORTHJul 12, 2016
Jun 7, 2016BApt 1H · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM WEST AT NORTHJul 12, 2016
Jun 7, 2016CApt 1H · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM WEST AT NORTHJun 15, 2016
Jun 7, 2016BApt 1H · SECTION 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN DRAIN PIPE AT BATHTUB IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM WEST AT NORTHJul 12, 2016
Jun 7, 2016BApt 1H · SECTION 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM WEST AT NORTHJul 12, 2016
Jun 7, 2016BApt 1H · SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM WEST AT NORTHJul 12, 2016
Jun 7, 2016BApt 1H · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM WEST AT NORTHJul 12, 2016
Jun 7, 2016AApt 1H · SECTION 27-2043 ADM CODE PROVIDE A LOCK AND KEY TO THE ENTRANCE DOOR OF DWELLING UNIT AND, IF A CL A MULTIPLE DWELLING, ALSO DOOR CHAIN GUARD IN THE ENTRANCE LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM WEST AT NORTHSep 10, 2016
Jun 7, 2016AApt 1H · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL CEILINGS, WALLS AND TRIM IN THE ENTIRE APARTMENT LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM WEST AT NORTHSep 10, 2016
Jun 7, 2016BApt 1H · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING AT CLOSET IN THE 1st PRIVATE HALLWAY FROM NORTH LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM WEST AT NORTHJul 12, 2016
May 23, 2016BApt 1H · SECTION 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). ; MISSING AT WALL LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM WEST AT NORTHJun 27, 2016
May 23, 2016BApt 1H · SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM WEST AT NORTHJun 27, 2016

Showing 60 of 63. Full list on the agency site.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 29, 2026, 7:44 PM ET. BBL 3056920040.

Look up another building