6 floors · 54 apartments · 59,040 sq ft · built 1939 · class D4 · owner of record: 5614 15th Ave Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 63 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 79 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 59,040 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 184 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 184 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 307 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 428 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5692). Agency page | Dec 31, 2032 in 2255 days | Next due 2032 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-15 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jun 30, 2021 | ELEVATOR #9028/704261 | DOB VIOLATION - ACTIVE |
| Apr 29, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2003764 | DOB VIOLATION - ACTIVE |
| Jan 8, 1999 | CONSTRUCTION WORK WITHOUT A PERMIT. WORK NOTED: HAVING INSTALLED (1) PARTITION WALL APPROX. 12'X 9' HIGH IN MASTER BEDROOM CREATING 2 BEDROOMS IN APART- MENT (5D). PARTITION ERECTED AT REAR OF APARE #12RH01 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Apr 29, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Dec 4, 2025 | B | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING COVERS AT TRASH BINS, IN WASTE COLLECTION AREA, AT CELLAR | Jan 8, 2026 |
| Dec 4, 2025 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CARBOARD, AND HOUSEHOLD ITEMS AT PUBLIC HALL, 2nd STORY | Jan 8, 2026 |
| Dec 4, 2025 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BABY CARRIAGE, AT PUBLIC HALL, 6th STORY | Jan 8, 2026 |
| May 23, 2024 | B | Apt 2C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Jun 27, 2024 |
| May 23, 2024 | B | Apt 2C · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Jun 27, 2024 |
| May 23, 2024 | B | Apt 2C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Jun 27, 2024 |
| May 23, 2024 | B | Apt 2C · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Jun 27, 2024 |
| Oct 19, 2023 | B | Apt 1H · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 5 SQ FT AT WEST WALL IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 16048435 ISSUED 19-JUN-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27 | Nov 23, 2023 |
| Oct 19, 2023 | B | Apt 2H · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING, APPROXIMATELY 2 SQ FT. IN THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 16054625 ISSUED 12-JUN-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27 | Nov 23, 2023 |
| Jun 23, 2023 | B | Apt 6C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6C, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Jul 28, 2023 |
| Jun 23, 2023 | B | Apt 6D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6D, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH | Jul 28, 2023 |
| Jun 23, 2023 | B | Apt 2H · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM WEST AT NORTH | Jul 28, 2023 |
| Jun 23, 2023 | B | Apt 2D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2D, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH | Jul 28, 2023 |
| Jun 23, 2023 | B | Apt 1F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1F, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Jul 28, 2023 |
| Jun 23, 2023 | B | Apt 2G · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2G, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH | Jul 28, 2023 |
| Jun 21, 2023 | B | Apt 1H · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 26, 2023 |
| Jun 21, 2023 | B | Apt 1H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WALLS INSIDE CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 26, 2023 |
| Jun 21, 2023 | B | Apt 1H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 26, 2023 |
| Jun 21, 2023 | B | Apt 1H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 26, 2023 |
| Jun 21, 2023 | A | Apt 1H · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 24, 2023 |
| Jun 6, 2023 | B | Apt 3F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH | Jul 11, 2023 |
| Jun 6, 2023 | B | Apt 6B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jul 11, 2023 |
| Jun 6, 2023 | B | Apt 6F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6F, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | Jul 11, 2023 |
| Jun 6, 2023 | B | Apt 6H · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6H, 6th STORY, 4th APARTMENT FROM WEST AT NORTH | Jul 11, 2023 |
| Jun 6, 2023 | B | Apt 5A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 11, 2023 |
| Jun 6, 2023 | B | Apt 5H · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5H, 5th STORY, 4th APARTMENT FROM WEST AT NORTH | Jul 11, 2023 |
| Jun 6, 2023 | B | Apt 4B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jul 11, 2023 |
| Jun 6, 2023 | B | Apt 4D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4D, 4th STORY, 4th APARTMENT FROM EAST AT SOUTH | Jul 11, 2023 |
| Jun 6, 2023 | B | Apt 4F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Jul 11, 2023 |
| Jun 6, 2023 | B | Apt 3A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 11, 2023 |
| Jun 6, 2023 | B | Apt 3C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3C, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Jul 11, 2023 |
| Jun 6, 2023 | B | Apt 3D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3D, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTH | Jul 11, 2023 |
| Jun 6, 2023 | B | Apt 2F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Jul 11, 2023 |
| Jun 6, 2023 | B | Apt 1D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1D, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH | Jul 11, 2023 |
| Jun 6, 2023 | B | Apt 1G · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1G, 1st STORY, 3rd APARTMENT FROM WEST AT NORTH | Jul 11, 2023 |
| May 4, 2023 | C | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | May 8, 2023 |
| May 4, 2023 | C | § 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | May 8, 2023 |
| Sep 14, 2021 | B | Apt 5J · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 2 SQ FT AT THE WINDOW FRAME FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 14334695 ISSUED 12-MAY-21 HAS BEEN UPGRADED TO CLAS | Oct 19, 2021 |
| Jun 28, 2021 | B | Apt 5J · § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE (AIR CONDITIONER AT FIRE ESCAPE WINDOW) IN THE 1st ROOM FROM NORTH LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 2, 2021 |
| Mar 17, 2021 | C | Apt 6B · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 21, 2021 |
| Jan 29, 2021 | C | Apt 1J · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ; IN THE ENTIRE APARTMENT LOCATED AT APT 1J, 1st STORY, 5th APARTMENT FROM NORTH AT EAST | Feb 2, 2021 |
| Jan 27, 2021 | B | Apt 5J · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF AIR CONDITIONER UNIT INSTALLED IN THE FIRE ESCAPE WINDOW IN THE 1st ROOM FROM NORTH LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 3, 2021 |
| Nov 4, 2020 | C | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Nov 8, 2020 |
| Nov 2, 2020 | C | Apt 5J · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .... IN THE ENTIRE APARTMENT LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 6, 2020 |
| Nov 2, 2020 | C | Apt 4F · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Nov 6, 2020 |
| Nov 2, 2020 | C | Apt 6G · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST | Nov 6, 2020 |
| Jul 21, 2020 | C | § 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Jul 25, 2020 |
| Sep 4, 2018 | B | Apt 5B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 9, 2018 |
| Jun 7, 2016 | B | Apt 1H · SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING AT CLOSET IN THE 1st PRIVATE HALLWAY FROM NORTH LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM WEST AT NORTH | Jul 12, 2016 |
| Jun 7, 2016 | B | Apt 1H · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM WEST AT NORTH | Jul 12, 2016 |
| Jun 7, 2016 | C | Apt 1H · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM WEST AT NORTH | Jun 15, 2016 |
| Jun 7, 2016 | B | Apt 1H · SECTION 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN DRAIN PIPE AT BATHTUB IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM WEST AT NORTH | Jul 12, 2016 |
| Jun 7, 2016 | B | Apt 1H · SECTION 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM WEST AT NORTH | Jul 12, 2016 |
| Jun 7, 2016 | B | Apt 1H · SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM WEST AT NORTH | Jul 12, 2016 |
| Jun 7, 2016 | B | Apt 1H · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM WEST AT NORTH | Jul 12, 2016 |
| Jun 7, 2016 | A | Apt 1H · SECTION 27-2043 ADM CODE PROVIDE A LOCK AND KEY TO THE ENTRANCE DOOR OF DWELLING UNIT AND, IF A CL A MULTIPLE DWELLING, ALSO DOOR CHAIN GUARD IN THE ENTRANCE LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM WEST AT NORTH | Sep 10, 2016 |
| Jun 7, 2016 | A | Apt 1H · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL CEILINGS, WALLS AND TRIM IN THE ENTIRE APARTMENT LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM WEST AT NORTH | Sep 10, 2016 |
| Jun 7, 2016 | B | Apt 1H · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING AT CLOSET IN THE 1st PRIVATE HALLWAY FROM NORTH LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM WEST AT NORTH | Jul 12, 2016 |
| May 23, 2016 | B | Apt 1H · SECTION 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). ; MISSING AT WALL LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM WEST AT NORTH | Jun 27, 2016 |
| May 23, 2016 | B | Apt 1H · SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM WEST AT NORTH | Jun 27, 2016 |
Showing 60 of 63. Full list on the agency site.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 7:44 PM ET. BBL 3056920040.