1 floors · 2,880 sq ft · built 1931 · class K1 · owner of record: Brooklyn Cathedral Of Praise Church Of G Od Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 17 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 428 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 23, 2025 | Construction CLASS - 1 SUMMONS ISSUED FOR FAILURE TO MAINTAIN DUE TO SECTION OF CONCRETE STUCCO MISSING ALONG WITH MISSING BRICKS AND MORTAR JOINTS ON EXPOSURE 2 EXTERIOR WALL (EAST 57 STREET SIDE) OF BUILDING, REPAIR AND/REPLACE #39158173L | Nov 5, 2025 ADMIT/IN-VIO | $0 |
| Mar 12, 1998 | Construction Non-Hazardous WORK WITHOUT A PERMIT (WORK NOTED) HAVING BUILT A ONE STORY MASONRY EXTENSION AT REAR OF PREMISES APPROX SIZE 25'X75' FT. REMEDY: OBTAIN A PERMIT IF FEASIBLE OR REMOVE ILLEGAL EXTENSION. #34173345M | Jun 15, 1998 WRITTEN OFF | $0 |
| Jun 12, 1996 | Construction Non-Hazardous FAILURE TO MAINTAIN DEFECT NOTED PARAPET WALL AT REAR AT SIDE (E 57 ST) DETECTIVE & COLLAPSING MASONAY. REMEDY: REPAR OR REPLACE DETECTIVE MASONRY PARAPET WALL. #34140625X | Aug 26, 1996 WRITTEN OFF | $0 |
| May 23, 1996 | Construction Non-Hazardous WORK WITHOUT A PERMIT WORK NOTED A ONE STORY WOOD EXTENSION OF APPROX 25X75FT IS BEING BUILT AT REAR.REMEDY STOP ALL WORK.OBTAIN A PERMIT IF FEASIBLE OR REMOVE ILLEGAL EXTENSION. #34138992P | Aug 19, 1996 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 23, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TME OF INSPE CTION OBSERVED PARAPET WITH STPE CRACKING/ DETERIORATED STRUCTURAL STE EL WITH RUST/ MISSING BRICK AND MORTAR. ( 718-286-3460) SUBMIT ENGINEE RS REPORT EVALUATING CITED CONDITIONS WITH PHOTOS AND TIMES FRAME FOR RAPIRS TO ERTINPE #CR01CM | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 17) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 1:50 PM ET. BBL 3047770007.