3 floors · 2 apartments · 3,833 sq ft · built 1931 · class S9 · owner of record: 4802 7th Ave Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-03-03 (Accepted). Agency page | Dec 31, 2026 in 66 days | 1 of 1 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 310 days | Required only if the owner doesn't live there |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1162 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 21, 2007 | Boilers Hazardous B4B/BQ9/4B/32A/36/38/48A/50A/50B/50C/50D/50E/50F/50G/50H/50I/.50A-LEAKS ON HARTFORD LOOP.50B-HOLES IN BOILER ROOM WALLS & CEILING.50C-FRESH AIR TOO SMALL MINIMUM 12 X 12.50D-NO FIRE DAMPER.50E-FRESH AIR SUPPORT #32052560L | May 19, 2008 WRITTEN OFF | $0 |
| May 24, 1999 | Construction Non-Hazardous WORK W/O A PERMIT. WORK NOTED: GARAGE CONVERTED TO BUSINESS, NEW STOREFRONT INSTALLED A DROP CEILING & PARTITION WALLS. AREA APPROX 15'X25'NO PERMIT ON RECORD ALSO CURB CUT AS BEEN CREATED ON 56 STREET APPROX #34209986Y | Sep 13, 1999 WRITTEN OFF | $0 |
| Apr 29, 1993 | Construction Non-Hazardous WORK WITHOUT A PERMIT WORK NOTED: GARAGE CONVERTED TO BUSINESS, NEW STORE FORNT INSTALLED, A DROP CELLING AND PARTITIONS. AREA APPROX.15'X25' NO PERMIT AT SITE AND CURB HAS BEEN CUT ON 56 STREET APPROX.20' #34090916N | Jul 12, 1993 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #41282 | DOB VIOLATION - ACTIVE |
| May 24, 1999 | CONSTRUCTION WORK WITHOUT A PERMIT. WORK NOTED: GARAGE CONVERTED TO BUSINESS, NEW STORE FRONT INSTALLED, A DROP CEILING AND PARTITION WALLS. AREA APPROX 15'X 25'. NO PERMIT ON RECORD ALSO CURB CUT HAS BEEN CREATED ON 56TH STREET APPROX 20FT. REMEDY: OBTAIN A PERMIT IF FEASIBLE OR RESTORE PREMISES TO PRIOR CONDIT #07RH03 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Jan 26, 1998 | CONSTRUCTION WORK WITHOUT A PERMIT. WORK NOTED: STORE FRONT INSTALLED, DROP CEIELIN CEILING AND PARTITIONS ERECTED. AREA APPROX. 15' X 12'. NO PERMIT AT SITE AT TIME OF INSPECTION REMEDY: OBTAIN PERMITS AND APPROVALS IF FEASIBLE OR RETURN PREMISES TO PRIOR LEGAL CONDITION #07HS01 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 7) | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 5:25 AM ET. BBL 3008420038.