3 floors · 45,750 sq ft · built 1922 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 62 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-31 (Accepted). Agency page | Dec 31, 2026 in 62 days | 1 of 3 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 45,750 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 183 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 183 days | Annual filing |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 1, 2026 | Construction CLASS - 2 REISSUE#35720953M FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:CLASSROOM DOORS DO NOT SELF-CLOSE PROPERLY WHEN TESTED AT 2ND FLR RM#'S 204,207 AND 208.REM:REPAIR AND/OR REPLACE. #35732155X | Jul 24, 2026 POP/IN-VIO | $0 |
| May 1, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:CLASSROOM DOORS DO NOT SELF-CLOSE PROPERLY AT 1ST FLR RM#'S-M104,M106,M109,M110.REM:REPAIR AND/OR REPLACE. #35732157J | Jul 24, 2026 POP/IN-VIO | $0 |
| May 1, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:ON THE FIRST FLOOR EXIT SIGN AT EXIT 2 WAS NOT OPERATIONAL AT THE TIME #35732156H | Jul 24, 2026 POP/IN-VIO | $0 |
| Jul 14, 2025 | Construction CLASS - 2 REISSUE#35688900L FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT INTERIOR EXIT DOORS 2,3,7 3RD FL 311 2ND FL 204,1ST FL 100 DOORS NOT WORKING PROPERLY.REM:COMPLY WITH CODE. #35720953M | Sep 5, 2025 POP/IN-VIO | $0 |
| Jul 14, 2025 | Construction CLASS - 2 REISSUE#35688905K FAILURE TO MAINTAIN BUILDING WALL(S)OR APPURTENANCESAT ALL EXPOSURES AT RETAINING WALLS HAVE CRACKS AND MISSING CONCRETE.REM:COMPLY WITH CODE. #35720951Z | Sep 5, 2025 POP/IN-VIO | $0 |
| Sep 16, 2024 | Construction CLASS - 2 REISSUE #35673030P. FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. AT ALL EXPOSURES RETAINING WALLS HAVE CRACKS AND MISSING CONCRETE. REMEDY: MAINTAIN EXTERIOR BUILDING WALL. #35688905K | Oct 25, 2024 POP/IN-VIO | $0 |
| Sep 16, 2024 | Construction CLASS - 2 REISSUE #35673033K. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER. AT INTERIOR EXIT DOORS 2, 3, 7, 3FL. 311, 2FL. 204, 210 AND 1FL. 101 DOOR ARE NOT CLOSING PROPERLY. REMEDY: REPAIR AND/OR REPLACE. #35688900L | Oct 25, 2024 POP/IN-VIO | $0 |
| May 8, 2023 | Construction CLASS - 2 RE-ISSUE#35665431K-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTE:OBSERVED DEFECTIVE INTERIOR DOORS LOCATED AT 3RD FLOOR-STAIR BROOM#308 & #306.AT 2ND FLOOR-STAIR C AND AT 1ST FLOOR-INTERIOR DOOR FO #35673033K | Aug 4, 2023 POP/IN-VIO | $0 |
| May 8, 2023 | Construction CLASS - 2 REISSUE#35665436P FAILURE TO MAINTAIN BUILDING WALL(S)OR APPURTENANCESNOTE:OBSERVED AT EXP#2 & #3 RETAINING WALL FOR SCHOOL PLAYGROUND HAS VERTICAL STEP CRACKS,SPALLING CONCRETE AND EXPOSED REINFORCEMENT THAT A #35673030P | Aug 4, 2023 POP/IN-VIO | $0 |
| Jun 17, 2022 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING WALL(S)OR APPURTENANCES.NOTED:OBSERVED SCHOOL YARD'S RETAINING WALLS AT EAST ELEVATION,NORTH ELEVATION AND SOUTH EAST CORNER HAVE VERTICAL CRACKS,MISSING CHUNKS OF CONCRETE AND A ON #35665436P | Sep 16, 2022 POP/IN-VIO | $0 |
| Jun 17, 2022 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER:NOTED:OBSERVED FIREPROOF SELFCLOSING DOORS@EXIT2,3,7(DOORS BEFORE EXTERIOR DOORS),2FL STAIRC,3FL STAIRB ARE RACKED/OUT OF SQUARE,DOORS KNOCKING ON DOOR FRAMES&NO #35665431X | Aug 19, 2022 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06794 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06795 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
None open.