1 floors · 3,741 sq ft · built 1931 · class E1 · owner of record: Geulah Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 42 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 42 days | Keep the report on file (not filed with DOB) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 9, 2017 | Construction CLASS - 1 SEC: BC3309.9. FAILURE TO WEATHER PROOF. NOTICED @ TIME OF INSP WEATHER PROOFING INADEQUATE @ EXP#4 FOUNDATION FOR ADJACENT BLDG CAUSING WATER TO ENTER BASEMENT. PREVIOUS VIOLATION ISSUED ECB# 35206776Z ON 1/4/ #35239876R | Jun 26, 2017 WRITTEN OFF | $0 |
| Jan 21, 2017 | Construction CLASS - 1 SEC. 3309.9 WEATHER PROOFING INTEGRITY OF ADJOINING BLDGS NOT MAINTAINED. NOTED: AT TIME OF INSPECTION,THE WEATHER PROOFING INTEGRITY OF THEADJOINING PROPERTIES @ EXP#2&4 WERE NOT ADEQUATELY WEATHER PROOFED. I #35206776Z | Mar 13, 2017 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 9, 2017 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00385 | DOB VIOLATION - ACTIVE |
| Apr 19, 2017 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00299 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | CONSTRUCTION FAILURE TO MAINTAIN: CELLAR:WATER DAMAGES APPEARED THROUGHOUT; CEILING COLLAPSED THROUGHOUT; FLOOR SEVERLY ROTTED,SAGGING,SLOPING WITH SOFT POCKETS AND HOLES. SUBCELLAR:WATER DAMAGES,WOOD JOISTSDETERIORATED JOIST BY STAIR CRUSHED WITH TEMP. SHORING. LICENSED PE TO EVALUATE ENTIRE BUILDING &OBTAIN PE #FEU30901PS | DOB VIOLATION - ACTIVE |
| Dec 17, 1990 | CONSTRUCTION #09X2 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | Active |
| Aug 9, 2017 | AEUHAZ FTC-AEU-HAZ | Active |
| Apr 19, 2017 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 19, 2026, 11:10 AM ET. BBL 3047930022.