2 floors · 12 apartments · 14,496 sq ft · built 1981 · class C9 · owner of record: Lrf Housing Associates
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 314 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 801 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-18 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 20, 2012 | Construction CLASS - 1 SECTION OF STONE RETAINING WALL AT REAR IS MISSING AND LOOSE ALSO VERTICAL CRACKS OBSERVED FROM TOP TO BOTTOM OF RETAINING WALL RETAINING WALL IS APPX 25FT HIGH AND 80FT LONG REM: MAINTAIN BLDG OBTAIN PERMIT PR #34956627L | Oct 12, 2012 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 29, 2012 | CONSTRUCTION #FEU2011DR | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT #07619 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #10256 | DOB VIOLATION - ACTIVE |
| Mar 19, 2003 | LOCAL LAW 62/91 - BOILERS #09177 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #10045 | DOB VIOLATION - ACTIVE |
| Feb 27, 2001 | LOCAL LAW 62/91 - BOILERS #09452 | DOB VIOLATION - ACTIVE |
| Feb 7, 2000 | LOCAL LAW 62/91 - BOILERS #09772 | DOB VIOLATION - ACTIVE |
| Mar 16, 1999 | LOCAL LAW 62/91 - BOILERS #09635 | DOB VIOLATION - ACTIVE |
| May 4, 1998 | LOCAL LAW 62/91 - BOILERS #11652 | DOB VIOLATION - ACTIVE |
| Sep 16, 1997 | LOCAL LAW 62/91 - BOILERS #199325 | DOB VIOLATION - ACTIVE |
| Aug 29, 1995 | LOCAL LAW 62/91 - BOILERS #18685 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Dec 13, 2011 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT | Active |
| Feb 13, 2004 | Boiler LL6291 | Active |
| Mar 19, 2003 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Feb 27, 2001 | Boiler LL6291 | Active |
| Feb 7, 2000 | Boiler LL6291 | Active |
| Mar 16, 1999 | Boiler LL6291 | Active |
| May 4, 1998 | Boiler LL6291 | Active |
| Sep 16, 1997 | Boiler LL6291 | Active |
| Aug 29, 1995 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 7, 2026 | B | Apt GROUND · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER THE CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT GROUND, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''566'' | Nov 11, 2026 |
| Oct 7, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTAR JOINTS AT BUILDING FRONT | Nov 11, 2026 |
| Oct 7, 2026 | B | Apt GROUND · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENT AT CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT GROUND, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''566'' | Nov 11, 2026 |
| Oct 7, 2026 | B | Apt GROUND · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD DOORS AT BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT GROUND, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''566'' | Nov 11, 2026 |
| Feb 28, 2025 | B | Apt PH · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WEST WALL CABINET DOOR IN THE KITCHEN LOCATED AT APT PH, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Apr 4, 2025 |
| Oct 16, 2024 | B | Apt J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT J, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''560J'' | Nov 20, 2024 |
| Jul 15, 2024 | A | Apt J · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT J, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 18, 2024 |
| Jun 18, 2024 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BROKEN BRICKS AT BUILDING FRONT PARAPET WALL | Jul 23, 2024 |
| Jun 18, 2024 | C | Apt J · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT J, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''560J'' | Jul 14, 2024 |
| Jun 18, 2024 | C | Apt J · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT J, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''560J'' | Jul 14, 2024 |
| Jun 14, 2024 | C | Apt J · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT J, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''560'' | Jul 10, 2024 |
| Jun 14, 2024 | C | Apt J · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT J, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''560'' | Jul 10, 2024 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 7, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER THE CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT GROUND, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''566'' | Open |
| Oct 7, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTAR JOINTS AT BUILDING FRONT | Open |
| Oct 7, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENT AT CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT GROUND, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''566'' | Open |
| Oct 7, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD DOORS AT BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT GROUND, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''566'' | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 9:39 AM ET. BBL 2026230004.