4 floors · 4,484 sq ft · built 1910 · class K4 · owner of record: Maslo Realty Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1141 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-02 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 19, 2024 | Construction CLASS - 2 ATOI OF AN ONGOING CONSTRUCTION WORK AT 56 E 41ST ST. UNDER JOB NUMBER M01151621-I1-GC,FOR PROPOSED INTERIOR/EXTERIOR RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR,CONSTRUCTION WORK AS PER PLAN WITHOUT NO PE #39133300Y | Mar 27, 2025 DEFAULT | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 13, 2026 | CONSTRUCTION BOROUGH COMMISSIONER STOP WORK ORDER APPLICATION #M01151621-I1 DUE TO CONTRACTOR WITHDRAWAL. #26-02010 | DOB VIOLATION - ACTIVE |
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 13, 2026 | DOB | CONSTRUCTION: BOROUGH COMMISSIONER STOP WORK ORDER APPLICATION #M01151621-I1 DUE TO CONTRACTOR WITHDRAWAL. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 3:47 PM ET. BBL 1012750143.