Brooklyn · Block 5062 · Lot 59 · 11226

56 East 21 Street

7 floors · 20 apartments · 18,203 sq ft · built 2017 · class D3 · owner of record: 56 East 21 Realty Llc

1open violations
$16,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 44 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 60 days
Annual
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 409 days
Next cycle year 2027
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. Agency page

Feb 21, 2029
in 827 days
Filing window not open yet

Open violations

ECB / OATH (7) · $16,250 owed
IssuedViolationHearingBalance
Sep 7, 2023Unknown CLASS - 2
AT THE TIME OF MY INSPECTION OF A 7 STORY NEW BUILDING ACTIVE JOB SITE, I OBSERVED AT EXPOSURE # 2 THAT THERE WERE NO OVERHEAD PROTECTION TO ADJOINING BUILDING FRONT AND BACK PATIO. THIS CREATES A HAZARDOUS CON
#39521444H
Sep 24, 2024
IN VIOLATION
$2,500
Dec 2, 2019Construction CLASS - 2
FAILURE TO MAINTAIN ADEQAUET HOUSEKEEPING AT TH TIM EOF MY INSPECTION OF AN 7 STORY PROPOSED NB SITE CURRENTLY AT EXCAVATION STAGE I OBSERVED PAST HOUSEKEEPING ON EXPO #1 BY SITE ENTRANCE THERE WAS GARBAGE & WO
#35464353Z
Jun 24, 2025
IN VIOLATION
$1,250
Dec 2, 2019Construction CLASS - 2
TEMPORARY CONSTRUCTION EUQIPMENT ON SITE EXPIRED PERMIT AT THE TIME OF MY INSPECTION OF AN 7 STORY PROPOSED NB SITE CURRENTKY AT ESCAVATION STAGE AFTER RESEARCHING SITE ON BIS I NOTED THAT THE CONSTRUCTION FENC
#35464352R
Sep 21, 2020
DEFAULT
$3,125
Oct 23, 2019Construction CLASS - 2
EXPIRED PERMIT(TEMPORARY CONSTRUCTION PROTECTIVE STRUCTURE (FENCE).AT THE TIME OF INSPECTION OF A 7STORY PROPOSED RESIDENTIAL BLDG.1 OBSERVED TEMP CONSTRUCTION JFENCE ERECTED ON EXP#1 OF THE JOB SITE,WITH PICTO
#35460502P
Feb 26, 2020
DEFAULT
$3,125
Aug 17, 2018Construction CLASS - 1
SEC. 28-105.12.2 WORK CONTRARY TO PERMIT. AT TIME OF INSPECTION OBSERVED AN ACTIVE CONSTRUCTION SITE W/EXCAVATION & REBAR WORK IN PROGRESS,DURING INSPECTION. NOTED: THE BRACING OF THE SUPERSTRUCTURE OF THE ADJO
#35316087K
Oct 29, 2018
IN VIOLATION
$2,500
Aug 17, 2018Construction CLASS - 1
SEC. 3309.4.5 BRACING OF THE SUPER STRUCTURE OF THE ADJOINING BLDG WAS REMOVED CONTRARY TO THE SEQUENCE. NOTED: ON THE DESIGN DRAWING AT TIME OF INSPECTION OBSERVED AN ACTIVE CONSTRUCTION SITE W/EXCAVATION,REBA
#35316088M
Oct 29, 2018
IN VIOLATION
$2,500
Jun 26, 2018Construction CLASS - 2
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS.AT TIME OF INSPECTION OBSERVED THAT THE SUPPORT OF EXCAVATION IS IN PLACE BUT IS MISSING A WALER AT EXPOSURE #4 REAR AS PER DWGS#SK-2 NOT CONFORMING TO P
#35336238R
Aug 27, 2018
IN VIOLATION
$1,250
DOB (0)

None open.

DOB NOW Safety (1)
IssuedViolationStatus
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 14)
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 12:55 PM ET. BBL 3050620059.

Look up another building