Brooklyn · Block 265 · Lot 7502 · 11201

56 Court Street

7 floors · 12 apartments · 16,180 sq ft · built 1927 · class RM · owner of record: 56 Court Condominium

14open violations
$2,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
46dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 46 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 46 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 62 days
Annual
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page

Feb 21, 2027
in 98 days
No Cycle 10 report on record yet
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 290 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1142 days
Next cycle year 2029
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-15 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2) · $2,500 owed
IssuedViolationHearingBalance
Sep 19, 2023Construction CLASS - 1
FAILURE TO MAINTAIN BUILD IN CODE COMPLAINT MANNER. NOTE, CONCRETE CINDER SLAB AT SUB CELLAR, CELLAR AND 1ST CEILING IS FLAKING, CRACKED AND SECTION MISSING, EXPOSING STEEL WHICH IS RUSHING IN VARIOUS LOCATION.
#39095243M
Feb 14, 2025
IN VIOLATION
$1,250
Jul 3, 2023Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING & ALL PARTS THEREOF ON A CODE-COMPLIANT MANNER: SPALLING CONCRETE W/ ESPOSED, RUSTED REBAR IN VARIOUS LOCATIONS. PARTIAL COLLAPSE AT ELECTRICAL ROOM. ACTIVE LEAKING IN MULTIPLE LOCA
#39089609R
Sep 11, 2024
IN VIOLATION
$1,250
DOB (8)
IssuedViolationStatus
May 29, 2024CONSTRUCTION
FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION/PARTIAL VACATE.2NDFL LAUNDRY ROOM@EXP 2/3 CRNR W/CONCRETE SLAB SEVERELY SPALLNG@UNDERSIDE OF SLAB&EXPOSED/CORRODED REBAR.TEMP SHORNG@UNDERSIDE OF 2NDFL PARTIALLY VACATE 2NDFL LAUNDRY ROOM UNTIL 2NDFL SLAB HAS BEEN PERM RPAIRD UNDR PRMT W/RPAIR JOB COMPLET
#FEU30201DW
DOB VIOLATION - ACTIVE
May 16, 2024CONSTRUCTION
EMERGENCY WORK ORDER.UNDERSIDE OF CELLAR,1ST,&2NDFL CONE SLABS SEVERELY SPALLD@VARIOUS LOCATIONS W/STEEL REINF.SEVERELYCORRODED& EXPSD.EXIST SHORNG WAS IN PLACE@SOME AREAS@SUBCELLAR&1STFL.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 343281 (101323FEU30201PN)DATED 10/13/2023,TO CMPLTE EMRGNCY SHORING
#FEU30201PN
DOB VIOLATION - ACTIVE
May 16, 2024CONSTRUCTION
ADDITIONAL INFORMATION:EOR R.LEVINE SUBMITTD TO FEU ON5/4/24 AN INSUFFICIENT RPORT W/PHOTOS OF EMRGNCY SHORNG WRK.EMRGNCY SHORNG WRK DIDNT APPEAR TO BE CMPLTE,BASED ON LIMITED RPORT&PHOTOS.SBMT TO FEU BY END OF DAY ON 5/20/24,SGND&SEALD RPORT(S) OF ALL RECENT EMRGNCY SHORNG WRK WHICH BEGAN ON/ARND 5
#FEU30202PN
DOB VIOLATION - ACTIVE
Mar 15, 2024CONSTRUCTION
FTM.UNDERSDE OF CONCRETE SLABS@CELLAR,1ST,2NDFLS WERE SEVERELY CELLAR, 1ST,2NDFLS@PENETRATIONS.EXISTNG SHORNG WAS INSTALLD@SUBCELLAR&1ST FLRS 2NDFL EXP3REAR SET BACK ROOF WAS DETERIORATD&SOFT.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER #343282(101323FEU30202PN)TO PERMANENTLY REPAIR BLDG UNDER PERMI
#FEU30201PN
DOB VIOLATION - ACTIVE
Nov 14, 2023CONSTRUCTION
EMERGENCY WORK ORDER.UNDERSIDE CELLAR,1ST,&2NDFL CONE SLABS SEVERELY SPALLD@VARIOUS LOCATIONS W/STEEL REINF.SEVERELY CORRODED&EXPOSD.EXIST SHORNG WAS IN PLACE@SOME AREAS@SUBCELLARS&1STFL.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 343281 (101323FEU30201PN)DATED OCTOBER 13, 2023.CONT EMER SHORNG WRK
#FEU30201PN
DOB VIOLATION - ACTIVE
Oct 13, 2023CONSTRUCTION
FTM.UNDERSIDE OF CNCRETE SLABS@CELLAR,1ST,2NDFLS WERE SEVERELY CELLAR, 1ST,2NDFLS@PENETRATIONS.EXISTING SHORNG WAS INSTALLD@SUBCELLAR&1ST FLRS.2NDFL EXP3REAR SET BACK ROOF WAS DETERIORATD&SOFT.OWNR TO RTAIN NYS PE TO EVAL ENT BLDG&PREPARE/FILE.RPAIR DRWNGS W/DOB.BLDG TO BE PERM RPAIRD UNDR PRMT STRT
#FEU30202PN
DOB VIOLATION - ACTIVE
Oct 13, 2023CONSTRUCTION
EMERGENCY WORK ORDER.UNDERSIDE OF CELLAR,1ST,&2NDFL CONE SLABS SEVERELY SPALLD@VARIOUS LOCATIONS W/STEEL REINF.SEVERELY CORRODED & EXPOSD.EXIST SHORNG WAS IN PLACE@SOME AREAS@SUBCELLAR&1STFL.OWNR TO IMMED RTAIN NYS PE&GC REGISTRD W/DOB TO 1.INSTALL SHORNG&SAFEGUARD AREAS AS REQ'D,2.NYS PE TO PROVIDE
#FEU30201PN
DOB VIOLATION - ACTIVE
Jul 3, 2023CONSTRUCTION
PARTIAL COLLAPSE AT SUB CELLAR ELECTRICAL ROOM. OSERVED ON-GOING LEAK AT SUBCELLAR CONTRIBUTING TO DETERIORATION OF STRUCTURAL MEMBERS IN VARIOUS LOCATIONS. SPALLING CONCRETE, RUSTED REDAR & PARTIAL CONCR ETE. OWNER TO HIRE NYSPE TO SUBMIT REPORT/CONST ENF @ BLDGS..NYC GOV W/IN 30 DAYS..ADDRESSING A
#0201SW
DOB VIOLATION - ACTIVE
DOB NOW Safety (6)
IssuedViolationStatus
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 15, 2026, 7:24 AM ET. BBL 3002657502.

Look up another building