2 floors · 2 apartments · 2,600 sq ft · built 1970 · class B1 · owner of record: Weng, Zhen Zhen
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 289 days | Required only if the owner doesn't live there |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 6, 2024 | A | Apt SECOND · § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRING AT EAST WALL IN THE KITCHEN LOCATED AT APT SECOND, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 10, 2024 |
| Sep 5, 2024 | B | Apt SECOND · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT SECOND, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 10, 2024 |
| Sep 5, 2024 | B | Apt SECOND · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). IN THE ENTIRE APARTMENT LOCATED AT APT SECOND, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 10, 2024 |
| Sep 5, 2024 | A | Apt SECOND · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL VENTILATION SYSTEM AT CEILING IN THE BATHROOM LOCATED AT APT SECOND, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 9, 2024 |
| Sep 5, 2024 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE METAL HANDRAIL AT BUILDING FRONT AT FRONT AREAWAY | Oct 10, 2024 |
| May 31, 2024 | C | § 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING CONSISTING OF KEY OPERATED DOUBLE CYLINDER LOCK INSTALLED AT METAL GATE AT APARTMENT ENTRANCE DOOR AT PUBLIC HALL, 1st STORY | Jun 6, 2024 |
| May 31, 2024 | C | § 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING CONSISTING OF KEY OPERATED DOUBLE CYLINDER LOCK INSTALLED AT METAL GATE TO STREET YARD | Jun 6, 2024 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 6:11 AM ET. BBL 4055960009.