Queens · Block 1952 · Lot 21 · 11368

56-22 Waldron Street

4 floors · 8 apartments · 3,940 sq ft · built 1991 · class C1 · owner of record: Kmba Realty Llc

9open violations
$0ECB/OATH penalties owed
1HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 70 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 70 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 70 days
Annual
Annual boiler inspection (3 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-21 (Accepted). Agency page

Dec 31, 2026
in 70 days
1 of 3 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 86 days
Annual

Open violations

ECB / OATH (0)

None open.

DOB (2)
IssuedViolationStatus
Jan 17, 2020LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#02661
DOB VIOLATION - ACTIVE
Jan 17, 2020LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#02663
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Jan 17, 2020Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
Jan 17, 2020Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
HPD (5) · C 1 · B 3 · A 1
IssuedClassViolationCorrect by
Nov 25, 2019CApt 1B · § 27-2005, 2007 HMC: REMOVE THE ILLEGAL DOUBLE CYLINDER KEY OPERATED LOCKING DEVICE AT DOOR IRON SECURITY DOOR LEADING TO REAR YARD IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1B, 1st STORY, APARTMENT AT SOUTHDec 3, 2019
Aug 13, 2015B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDED SHEETROCK CEILING AT CELLARSep 17, 2015
Aug 13, 2015B§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PAVING .. AT CELLARSep 17, 2015
Jul 28, 2006AApt 4A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WINDOW SILL NORTHEAST ROOM 4 STY NORTH APT 4A. , SECTION '' ''Nov 26, 2006
Jun 20, 2002BApt 3B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR AT NORTHWEST ROOM IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, APARTMENT AT WESTJul 30, 2002

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 22, 2026, 12:29 AM ET. BBL 4019520021.

Look up another building