9 floors · 813 apartments · 820,910 sq ft · built 1960 · class D3 · owner of record: Ocean Bay Rad Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 820,910 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 182 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 182 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 305 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 426 days | Next cycle year 2027 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $230,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 844 days | Filing window not open yet |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 16002). Agency page | Dec 31, 2032 in 2253 days | Next due 2032 |
| Annual boiler inspection (24 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-23 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 17, 2022 | Construction CLASS - 1 FAILURE TO PROVIDE SAFETY MEASURES TO PROTECT PUBLIC SAFETY FROM DOCUMENTED UNSAFE FACADE.NOTE QEWI SUBMITTED UNSAFE NOTIFICATION#911807 DATED ON 10/10/2022 WHICH REQUIRES RESPONDENT TO PROVIDE SAFETY MEASURES #35664488M | Aug 22, 2023 IN VIOLATION | $10,000 |
| Oct 17, 2022 | Construction CLASS - 1 FAILURE TO PROVIDE SAFETY MEASURES TO PROTECT PUBLIC SAFETY FROM DOCUMENTED UNSAFE FACADE.NOTE QEWI SUBMITTED UNSAFE NOTIFICATION#911805 DATED ON 10/11/2022 WHICH REQUIRES RESPONDENT TO PROVIDE SAFETY MEASURES #35664489Y | Aug 22, 2023 IN VIOLATION | $10,000 |
| Sep 15, 2022 | Construction CLASS - 1 FAILURE TO PROVIDE SAFETY MEASURES TO PROTECT PUBLIC SAFETY FROM DOC UNSAFE FACADE NOTE:RESPONDENT FAILED TO CORRECT PREV ISSUED ECB35651581Y DATED6/2/22,WHICH REQ RESPONDENT TO PROVIDE SAFETY MEASURES.HOWEVER, #35664292K | Sep 26, 2023 IN VIOLATION | $25,000 |
| Sep 15, 2022 | Construction CLASS - 1 FAILURE TO PROVIDE SAFETY MEASURES TO PROTECT PUBLIC SAFETY FROM DOC UNSAFE FACADE NOTE:RESPONDENT FAILED TO CORRECT PREV ISSUED ECB35651582X DATED6/2/22,WHICH REQ RESPONDENT TO PROVIDE SAFETY MEASURES.HOWEVER, #35664293M | Sep 26, 2023 IN VIOLATION | $25,000 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #01421 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #12157 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #12158 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #38354 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #43989 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #08482 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #32962 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #32963 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #08483 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #08507 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #08508 | DOB VIOLATION - ACTIVE |
| Nov 24, 2015 | FACADE SAFETY PROGRAM #85884 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 13, 2026 | C | Apt 9D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 9D, 9th STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 8, 2026 |
| Oct 8, 2026 | C | Apt 2F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 3, 2026 |
| Oct 8, 2026 | A | Apt 2F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE BATHROOM , THE PRIVATE HALLWAY , THE 2nd ROOM FROM NORTH, THE 1st ROOM FROM NORTH LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jan 11, 2027 |
| Oct 5, 2026 | B | Apt 2F · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE COUNTERTOPS AT WOOD BASE CABINETS AT NORTH AND SOUTH WALLS IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 9, 2026 |
| Oct 5, 2026 | C | Apt 2F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Oct 31, 2026 |
| Sep 21, 2026 | B | Apt 2B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THEN 10 SQ FT AT CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Oct 26, 2026 |
| Sep 21, 2026 | C | Apt 2B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Oct 17, 2026 |
| Sep 21, 2026 | C | Apt 2B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Oct 17, 2026 |
| Sep 21, 2026 | A | Apt 7H · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE FOYER LOCATED AT APT 7H, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 25, 2026 |
| Sep 21, 2026 | C | Apt 2B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQUARE FEET AT SOUTH WALL, CEILING,EAST WALL AND WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 19155954 ISSUED 21-AUG-26 HAS BEEN | Oct 17, 2026 |
| Sep 21, 2026 | C | Apt 2B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQUARE FEET AT CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 19155945 ISSUED 21-AUG-26 HAS BEEN UPGRADED TO CLASS C PER ADMIN | Oct 17, 2026 |
| Sep 21, 2026 | C | Apt 7H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 7H, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 17, 2026 |
| Sep 21, 2026 | A | Apt 2B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THEN 10 SQ FT AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Dec 25, 2026 |
| Aug 31, 2026 | A | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 6th STORY | Dec 4, 2026 |
| Aug 27, 2026 | B | Apt 1D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL, SOUTH WALL AND CEILING IN THE KITCHEN LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Oct 1, 2026 |
| Aug 27, 2026 | B | Apt 1D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 10 SQ FT BUT LESS THAN 30 SQ FT OBSERVED AT NORTH WALL, EAST WALL AND WEST WALL IN THE KITCHEN LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Oct 1, 2026 |
| Aug 27, 2026 | C | Apt 1D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 30 SQ FT OBSERVED IN THE 3rd ROOM FROM NORTH LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Sep 22, 2026 |
| Aug 26, 2026 | B | Apt 1D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 10 SQ FT BUT LESS THAN 30 SQ FT OBSERVED AT NORTH WALL, EAST WALL AND CEILING IN THE BATHROOM LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Sep 30, 2026 |
| Aug 26, 2026 | A | Apt 1D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT OBSERVED AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Nov 29, 2026 |
| Aug 26, 2026 | C | Apt 1D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 30 SQ FT OBSERVED AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Sep 21, 2026 |
| Aug 26, 2026 | B | Apt 1D · § 27-2005 HMC: REFIT ENTRANCE DOOR IN THE BATHROOM LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Sep 30, 2026 |
| Aug 26, 2026 | A | Apt 1D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT OBSERVED AT WEST WALL IN THE FOYER LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Nov 29, 2026 |
| Aug 26, 2026 | A | Apt 1D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT OBSERVED AT WINDOW FRAME AT EAST IN THE 1st ROOM FROM NORTH LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Nov 29, 2026 |
| Aug 26, 2026 | C | Apt 7D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 7D, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 21, 2026 |
| Aug 26, 2026 | B | Apt 7E · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE FIBER OPTIC CABLE AT CEILING IN THE FOYER LOCATED AT APT 7E, 7th STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 30, 2026 |
| Aug 26, 2026 | A | Apt 1D · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION WASTE PIPE AT CEILING IN THE BATHROOM LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Nov 29, 2026 |
| Aug 26, 2026 | A | Apt 7D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 7D, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 29, 2026 |
| Aug 26, 2026 | A | Apt 7D · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION WASTE PIPE AT CEILING IN THE BATHROOM LOCATED AT APT 7D, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 29, 2026 |
| Aug 26, 2026 | B | Apt 7E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE RUBBER MOLDING AT SOUTH WALL AND WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 7E, 7th STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 30, 2026 |
| Aug 26, 2026 | B | Apt 1D · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING LOCKING ASSEMBLY AT ENTRANCE DOOR IN THE 4th ROOM FROM NORTH LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Sep 30, 2026 |
| Aug 26, 2026 | A | Apt 7E · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT OBSERVED AT CEILING IN THE BATHROOM LOCATED AT APT 7E, 7th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 29, 2026 |
| Aug 24, 2026 | C | Apt 2B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Sep 19, 2026 |
| Aug 20, 2026 | A | Apt 1D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET OBSERVED AT CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 23, 2026 |
| Aug 20, 2026 | C | Apt 1G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1G, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 15, 2026 |
| Aug 20, 2026 | C | Apt 6A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 15, 2026 |
| Aug 20, 2026 | C | Apt 6A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 15, 2026 |
| Aug 19, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES AT ENTRANCE AT PUBLIC HALL, 1st STORY | Sep 23, 2026 |
| Aug 19, 2026 | C | Apt 2H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 14, 2026 |
| Aug 17, 2026 | A | Apt 4C · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT CEILING NEXT TO THE 1ST LIGHT FIXTURE AT NORTH IN THE PRIVATE HALLWAY LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''440'', AT NORTH | Nov 20, 2026 |
| Aug 17, 2026 | A | Apt 4C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING NEXT TO 1ST LIGHT FIXTURE AT NORTH IN THE PRIVATE HALLWAY LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''440'', AT NORTH | Nov 20, 2026 |
| Jul 21, 2026 | C | Apt 2H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 16, 2026 |
| Jul 21, 2026 | A | Apt 2H · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 24, 2026 |
| Jul 16, 2026 | C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE AT PUBLIC HALL, 1st STORY | Aug 11, 2026 |
| Jun 29, 2026 | B | Apt 4C · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN. IN THE BATHROOM LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 3, 2026 |
| Jun 29, 2026 | C | Apt 4C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 25, 2026 |
| Jun 29, 2026 | C | Apt 2H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 25, 2026 |
| Jun 16, 2026 | A | Apt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 19, 2026 |
| Jun 16, 2026 | A | Apt 6B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 19, 2026 |
| Jun 8, 2026 | C | Apt 7H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 7H, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 4, 2026 |
| Apr 20, 2026 | B | § 27-2005 HMC: REFIT FIRE DOOR LABELED A AT PUBLIC HALL, 2nd STORY, SECTION ''440'' | May 25, 2026 |
| Mar 9, 2026 | C | Apt 7H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 7H, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 4, 2026 |
| Mar 4, 2026 | C | Apt 7H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 7H, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 30, 2026 |
| Feb 17, 2026 | C | Apt 7H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 7H, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 15, 2026 |
| Feb 2, 2026 | C | Apt 4C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 28, 2026 |
| Feb 2, 2026 | C | Apt 4C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 28, 2026 |
| Feb 2, 2026 | A | Apt 4C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE KITCHEN LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | May 8, 2026 |
| Feb 2, 2026 | C | Apt 4C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LEAKY SHUT OFF VALVE IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 8, 2026 |
| Feb 2, 2026 | B | Apt 4C · 566 (B) 27-2021.4 HMC: ABATE THE NUISANCE CONSISTING OF PESTS. EVIDENCE OF OBSERVED EVIDENCE OF DROPPING, TRAPS, AND DAMPNESS IN THE ENTIRE APARTMENT LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 9, 2026 |
| Feb 2, 2026 | B | Apt 4C · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE AT WASH BASIN IN THE BATHROOM LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 9, 2026 |
| Feb 2, 2026 | B | Apt 4C · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE AT SINK IN THE KITCHEN LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 9, 2026 |
Showing 60 of 82. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 13, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 9D, 9th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Oct 8, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Oct 8, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE BATHROOM , THE PRIVATE HALLWAY , THE 2nd ROOM FROM NORTH, THE 1st ROOM FROM NORTH LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Oct 5, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE COUNTERTOPS AT WOOD BASE CABINETS AT NORTH AND SOUTH WALLS IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Oct 5, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Sep 21, 2026 | HPD B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THEN 10 SQ FT AT CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Open |
| Sep 21, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Open |
| Sep 21, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Open |
| Sep 21, 2026 | HPD A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE FOYER LOCATED AT APT 7H, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Sep 21, 2026 | HPD C | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQUARE FEET AT SOUTH WALL, CEILING,EAST WALL AND WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 19155954 ISSUED 21-AUG-26 HAS BEEN | Open |
| Sep 21, 2026 | HPD C | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQUARE FEET AT CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 19155945 ISSUED 21-AUG-26 HAS BEEN UPGRADED TO CLASS C PER ADMIN | Open |
| Sep 21, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 7H, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Sep 21, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THEN 10 SQ FT AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Open |
| Aug 31, 2026 | HPD A | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 6th STORY | Open |
| Aug 28, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AND ITS AASSEMBLIES AT BUILDING ENTRANCE DOOR AT 1ST STORY | Closed |
| Aug 27, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL, SOUTH WALL AND CEILING IN THE KITCHEN LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Open |
| Aug 27, 2026 | HPD B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 10 SQ FT BUT LESS THAN 30 SQ FT OBSERVED AT NORTH WALL, EAST WALL AND WEST WALL IN THE KITCHEN LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Open |
| Aug 27, 2026 | HPD C | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 30 SQ FT OBSERVED IN THE 3rd ROOM FROM NORTH LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Open |
| Aug 26, 2026 | HPD B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 10 SQ FT BUT LESS THAN 30 SQ FT OBSERVED AT NORTH WALL, EAST WALL AND CEILING IN THE BATHROOM LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Open |
| Aug 26, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT OBSERVED AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Open |
| Aug 26, 2026 | HPD C | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 30 SQ FT OBSERVED AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Open |
| Aug 26, 2026 | HPD B | § 27-2005 HMC: REFIT ENTRANCE DOOR IN THE BATHROOM LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Open |
| Aug 26, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT OBSERVED AT WEST WALL IN THE FOYER LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Open |
| Aug 26, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT OBSERVED AT WINDOW FRAME AT EAST IN THE 1st ROOM FROM NORTH LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Open |
| Aug 26, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 7D, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 8:03 AM ET. BBL 4160020001.