10 floors · 239 apartments · 208,560 sq ft · built 1973 · class D1 · owner of record: Nyc Housing Authority
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 44 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 44 days | Annual |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-02-24 (Accepted). Agency page | Dec 31, 2026 in 44 days | 3 of 3 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 60 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 208,560 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 165 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 165 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Registered through 2027-09-01 |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3062). Agency page | Dec 31, 2032 in 2236 days | Next due 2032 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $234,000 in late-filing or failure-to-file penalties. Agency page | On file | Cycle 10 filing on record: UNSAFE (2026-07-09) |
None open.
| Issued | Violation | Status |
|---|---|---|
| May 23, 2025 | CONSTRUCTION FAILURE TO MAINTIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED I OBSE RVED BULGING,SPALLING CONCRETE ON EXP1,2,3.EXP1 EAST ELEV:VERTICAL CRA CK IN BRICK JOIN AT 4TH & 5TH FL.SPANDRELS ALSO DAMAGED MORTAR JOINTS ON 5TH FL SPANDREL.EXP2 SOUTH ELEV:AC INADEQUATELY SUPPORTED,OBJECT WO OD BLOCKS SITTING #SR0601RF | DOB VIOLATION - ACTIVE |
| May 23, 2025 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO IMMINENT HAZARDOUS CONDITIONS OBSERVED ON EXPOSURES #1&2 THESE EXPOSURES ARE STREET ELEVATIONS & IMMEDIATE INSTALLATION OF SAFETY MEASURES TO SECURE PUBLIC SAFETY @ ELEVATIONS; CONDITIONS OBSERVED: SPALLING, CRACK & BLDG CONCRETE COLUMNS & BEAMS REMEDY:INSTALL ADEQUATE SA #SR0603RF | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00538 | DOB VIOLATION - ACTIVE |
| Dec 3, 2019 | FACADE SAFETY PROGRAM #HAZ88479 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Jan 14, 2026 | Facades FTC-FC-UNSAFE Unsafe report filed | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Dec 3, 2019 | Facades FISP CYCLE 8C UNSAFE REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 7, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 10, 2026 |
| Nov 20, 2025 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY | Feb 23, 2026 |
| Nov 20, 2025 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BOILER ROOM | Nov 26, 2025 |
| Nov 20, 2025 | C | Apt 10C · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 10C, 10th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''A-D'', AT NORTH | Nov 20, 2025 |
| Sep 18, 2025 | A | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL | Dec 22, 2025 |
| Sep 18, 2025 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM SIGN PRESENT, INFORMATION MISSING AT PUBLIC HALL | Sep 24, 2025 |
| Sep 18, 2025 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL | Dec 22, 2025 |
| Sep 18, 2025 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR FRAME MISSING AT PUBLIC HALL | Dec 22, 2025 |
| Jun 11, 1984 | A | Apt 10H · D26-10.01 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEALED WALL LEAK 10 STY SOUTH APT 10H KITCHEN & CENTER ROOM WEST SECTION. , SECTION '' '' | Sep 27, 1984 |
| Jun 11, 1984 | A | Apt 10H · D26-12.01 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS 10 STY SOUTH APT 10H CENTER ROOM & KITCHEN WEST SECTION. , SECTION '' '' | Sep 27, 1984 |
| Jun 11, 1984 | B | Apt 10H · D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALL UNDER SINK 10 STY SOUTH APT 10H KITCHEN WEST SECTION. , SECTION '' '' | Jul 29, 1984 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |