Brooklyn · Block 1624 · Lot 25 · 11221

558 Lexington Avenue

4 floors · 8 apartments · 6,684 sq ft · built 1931 · class C1 · owner of record: Lexus Management Andrealty Inc

30open violations
$23,750ECB/OATH penalties owed
2HPD class C (immediately hazardous)
47dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-11-06 (Accepted). Agency page

Dec 31, 2026
in 47 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 778 days
Next cycle year 2028

Open violations

ECB / OATH (11) · $23,750 owed
IssuedViolationHearingBalance
Oct 2, 2024Construction CLASS - 2
E.C.B VIOLATION ISSUED FOR FAILURE TO MAINTAIN AT TIME OF INSPECTION OBSERVED EXPOSURE 1 FRONT BUILDING ENTRANCE TWO A.C INSTALLED ON THE THIRD FLOOR WITHOUT SUPPORT BRACKET DIRECTLY AT THE MAIN ENTRANCE DOOR W
#39126422R
Dec 11, 2024
DEFAULT
$6,250
Oct 2, 2024Zoning CLASS - 2
E.C.B VIOLATION ISSUED FOR PLANTING AT TIME OF INSPECTION OBSERVED PLANTING DIRT GRASS HAS BEEN REMOVED AND REPLACED WITH CONCRETE AT THIS LOCATION EXPOSURE 1 IN VIOLATION OF NYC ZONING REGULATION UNDER R6B GEN
#39126421P
Dec 11, 2024
DEFAULT
$6,250
Feb 27, 2019Construction CLASS - 2
FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35289763X ISSUED ON 4/26/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. OCCUPANCY CONTRARY TO THAT
#35397053J
Jun 12, 2023
IN VIOLATION
$1,250
Jan 4, 2019Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35289763X ISSUED 04/26/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. REM: COMPLY WITH COMMISSI
#35393958X
Jun 12, 2023
IN VIOLATION
$1,250
Nov 26, 2018Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35289763X ISSUED ON 04-26-18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR HAVING AN ILLEGAL PAT IN APT#1L. REMEDY: COMPLY W/COMM'S OR
#35391931R
Jun 12, 2023
IN VIOLATION
$1,250
Oct 11, 2018Construction CLASS - 2
FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35289763X ISSUED ON 4/26/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. NOTE:NO DOCUMENT FILE FOR
#35388905X
Dec 31, 2018
IN VIOLATION
$1,250
Sep 6, 2018Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35288763X ISSUED ON 04-26-18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. NOTE: NO DOCUMENT FILE FOR OCCUPANCY CONTRARY TO BLDG RECORDS.
#35388385L
Nov 26, 2018
IN VIOLATION
$1,250
Jul 19, 2018Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35289763X ISSUED ON 04-26-18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR BLDG DEPT
#35341312M
Dec 3, 2018
IN VIOLATION
$1,250
Jun 7, 2018Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35289763X ISSUED ON 04-26-18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR BLDG DEPT
#35339333Z
Jan 16, 2019
IN VIOLATION
$1,250
Apr 26, 2018Construction CLASS - 1
OCCUPANCY CONTRARY TO THAT ALLOWED BY THE BUILDING DEPT RECORDS.HPD RC#341847 INDICATES PREMISES IS A LEGAL (8) CLASS "A" UNITS(1T FLR THRU 4TH FLRS)ILLEGAL OCCUPANCY NOTED AT 1ST FLR APT#1L ERECTED FULL HEIGHT
#35289763X
Aug 6, 2018
IN VIOLATION
$2,500
Nov 30, 2009Boilers CLASS - 2
B254 16.15.50A DRAFT STAT MISSING 50B NO MIXING VALVE ON COIL FITTINGSH.W. 50C NO CHECK VALVE ON COLD WATER FEED LINE 50D NO CLEAN OUT IN CHIMNEY BASE ENG FIRE DAMPER ON FRESH AIR INTAKE 50F SEALED AROUND FRE
#32067948J
Jan 25, 2010
WRITTEN OFF
$0
DOB (8)
IssuedViolationStatus
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#08784
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
#06334
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#26236
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#27689
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#06225
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#12758
DOB VIOLATION - ACTIVE
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#09673
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#37272
DOB VIOLATION - ACTIVE
DOB NOW Safety (7)
IssuedViolationStatus
Sep 23, 2024Boiler LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Active
HPD (12) · C 2 · B 6 · A 4
IssuedClassViolationCorrect by
Oct 27, 2025B§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD STORAGE AND BICYCLES AT PUBLIC HALL, 4th STORYDec 1, 2025
Jun 12, 2024BApt 1R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT DOOR AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTJul 17, 2024
May 30, 2023CApt 1L · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE IN THE ENTRANCE LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHJun 13, 2023
Dec 20, 2018AApt 1L · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 2nd APARTMENT FROM NORTH AT EASTMar 25, 2019
Dec 19, 2018AApt 1L · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 2nd APARTMENT FROM NORTH AT EASTMar 24, 2019
Dec 19, 2018AApt 1L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1L, 1st STORY, 2nd APARTMENT FROM NORTH AT EASTMar 24, 2019
Dec 3, 2018BApt 1F1L · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 1F1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTJan 7, 2019
Nov 26, 2018AApt 1F1L · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 1F1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTMar 1, 2019
Feb 26, 2016BApt 3L · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTApr 1, 2016
Feb 26, 2016BApt 3L · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING COVER PLATE OF ELECTRICAL OUTLET AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTApr 1, 2016
Feb 26, 2016BApt 3L · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MORTISE LOCK AT DOOR IN THE ENTRANCE LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTApr 1, 2016
Oct 13, 2015CApt 3L · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 3; WG TO REPLACE = 0; WG TO REPAIR = 3; LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EASNov 10, 2015

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 9:11 AM ET. BBL 3016240025.

Look up another building