4 floors · 2 apartments · 9,899 sq ft · built 1910 · class K4 · owner of record: S & M Enterprises
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 66 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-12-30 (Accepted). Agency page | Dec 31, 2026 in 66 days | 2 of 2 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 310 days | Required only if the owner doesn't live there |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 5, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. LACK OF NUMBER OF MEANS OF EGRESS FOR EVERY FLOOR PER BC 1018.1(2008 CODE) 27-366 BC 1021.1(2014 CODE) FOR TRANSIENT USE AT APT 3RD LEVEL. REMEDY:DISCONTIN #35425443K | Mar 25, 2021 IN VIOLATION | $2,500 |
| Jun 5, 2019 | Construction CLASS - 1 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O#33474 INDICATES PREMISES TO BE APPROVED FOR(ACTIVE) USE. ILLEGAL OCCUPANCY NOTED THAT APT AT 3RD FL HAS BEEN USED/CONVERTED FOR TRANSIENT USE HAVING 8 GUESTS FOR #35425442Z | Mar 25, 2021 IN VIOLATION | $2,500 |
| Jun 5, 2019 | Construction CLASS - 1 BC 907.2.8 FAILURE TO PROVIDE FIRE ALARM SYSTEM FOR TRANSIENT USE AT APT-3RD LEVEL. REMEDY: DISCONTINUE ILLEGAL USE #35425444M | Mar 25, 2021 IN VIOLATION | $2,500 |
| Jan 7, 1998 | Construction Non-Hazardous FAILURE TO MAINTAIN BUILDING, DEFECT IS: HANDRAILS ARE MISSING AT FRONT ENTRANCE. LOCATION: PUBLIC HALL. REMEDY: REPLACE HANDRAILS. #34168334K | Feb 26, 1998 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Mar 7, 2009 | CONSTRUCTION #0501SL | DOB VIOLATION - ACTIVE |
| Oct 8, 2008 | CONSTRUCTION #MTF01EM | DOB VIOLATION - ACTIVE |
| Sep 4, 2008 | CONSTRUCTION #MTF03EM | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Sep 4, 2008 | CONSTRUCTION #MTF04EM | DOB VIOLATION - ACTIVE |
| Sep 4, 2008 | CONSTRUCTION #MTF06EM | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Sep 4, 2008 | CONSTRUCTION #MTF12EM | DOB VIOLATION - ACTIVE |
| Sep 4, 2008 | ZONING #MTF01EM | DOB VIOLATION - ACTIVE |
| Sep 4, 2008 | CONSTRUCTION #MTF09EM | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Sep 4, 2008 | CONSTRUCTION #MTF02EM | DOB VIOLATION - ACTIVE |
| Jul 25, 1991 | CONSTRUCTION #B1JK01 | VIOLATION UNSERVED ECB-ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 9:40 PM ET. BBL 1009170156.