Manhattan · Block 761 · Lot 37 · 10018

555 8 Avenue

23 floors · 162,260 sq ft · built 1927 · class O4 · owner of record: Sloyer Forman Inc

18open violations
$11,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
64dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 64 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 162,260 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 185 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 185 days
Annual filing
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $213,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2029
in 847 days
Filing window not open yet
Energy audit and retro-commissioning (2031) Likely applies
Local Law 87 · Calendar year 2031
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 761). Agency page

Dec 31, 2031
in 1890 days
Next due 2031
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-16 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2) · $11,250 owed
IssuedViolationHearingBalance
Apr 20, 2026Local Law CLASS - 2
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #901563. REMEDY: FILE ACCEPTABLE REPORT.
#37036697Y
Mar 11, 2027
PENDING
$1,250
Jul 25, 2025Unknown CLASS - 2
FACADE WORK UPON INSPECTION NOTED SSM DAVID F MCEWEN HASENT BEEN DESIGN RIGER FORMAN FOR JOB AT PRESENT ADDRESS ., IN PLACE MOHAMED FARID NOT HOLD A RIGGER LICENSE TO REPRESNT SSM AND OPEN THE WORK ., MANY ISS
#39542810L
Apr 20, 2027
DEFAULT
$10,000
DOB (8)
IssuedViolationStatus
May 7, 2025FAILURE TO CORRECT SWARMP CONDITIONS (FACADE)
CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
#00006
DOB VIOLATION - ACTIVE
Sep 3, 2024HAZARDOUS CONDITION (FACADE)
CYCLE 9C UNSAFE REPORT FILED
#911929
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#00113
DOB VIOLATION - ACTIVE
Jan 26, 2018(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
#01018
DOB VIOLATION - ACTIVE
Jan 26, 2018(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
#01015
DOB VIOLATION - ACTIVE
Jan 26, 2018(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
#01019
DOB VIOLATION - ACTIVE
Jan 26, 2018(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
#01016
DOB VIOLATION - ACTIVE
Jan 26, 2018(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
#01017
DOB VIOLATION - ACTIVE
DOB NOW Safety (8)
IssuedViolationStatus
May 7, 2025Facades FISPFCS
CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
Active
Sep 3, 2024Facades FISPHAZ
CYCLE 9C UNSAFE REPORT FILED
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Jan 26, 2018Elevators ACC1
Active
Jan 26, 2018Elevators ACC1
Active
Jan 26, 2018Elevators ACC1
Active
Jan 26, 2018Elevators ACC1
Active
Jan 26, 2018Elevators ACC1
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 1:12 PM ET. BBL 1007610037.