5 floors · 14 apartments · 14,783 sq ft · built 1910 · class C7 · owner of record: Sobro 135 Partners Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 59 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 59 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 59 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 75 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 303 days | Registered through 2027-09-01 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-30 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 29, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AND ASSEMBLY TO VESTIBULE DOOR AT PUBLIC HALL, 1st STORY | Aug 3, 2026 |
| Jun 29, 2026 | B | Apt 10 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE FOYER LOCATED AT APT 10, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 3, 2026 |
| Jun 29, 2026 | C | Apt 10 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES TO DOOR IN THE ENTRANCE LOCATED AT APT 10, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 13, 2026 |
| Jun 29, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH TO DOOR AT VESTIBULE AT PUBLIC HALL, 1st STORY | Jul 13, 2026 |
| Oct 9, 2025 | A | §27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN PRIVATE DWELLINGS | Jan 12, 2026 |
| Oct 9, 2025 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT PUBLIC HALL, 1st STORY | Oct 15, 2025 |
| Oct 9, 2025 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Jan 12, 2026 |
| Oct 9, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 1st STORY | Nov 13, 2025 |
| Oct 9, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY | Jan 12, 2026 |
| Oct 9, 2025 | A | §27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAILBOX AT PUBLIC HALL, 1st STORY | Jan 12, 2026 |
| Oct 9, 2025 | B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE REFUSE AND RECYCLING AT BUILDING FRONT AT FRONT AREAWAY | Nov 13, 2025 |
| Oct 9, 2025 | A | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY | Jan 12, 2026 |
| Sep 22, 2025 | C | Apt 3N · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3N, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 18, 2025 |
| Sep 22, 2025 | C | Apt 3N · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3N, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 11, 2025 |
| Sep 22, 2025 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BOILER ROOM | Sep 28, 2025 |
| Sep 22, 2025 | B | Apt 3N · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 3N, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 27, 2025 |
| Sep 22, 2025 | C | Apt 3N · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3N, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 18, 2025 |
| Sep 12, 2025 | B | Apt 3N · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 3N, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 17, 2025 |
| Sep 12, 2025 | B | Apt 3N · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 3N, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 17, 2025 |
| Jul 10, 2025 | A | Apt 3N · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION STEAM RISER PIPE AT SOUTH IN THE 2nd ROOM FROM NORTH AT CENTER LOCATED AT APT 3N, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 13, 2025 |
| Jul 10, 2025 | A | Apt 3N · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND WEST WALL IN THE 2nd ROOM FROM NORTH AT CENTER LOCATED AT APT 3N, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 13, 2025 |
| Jul 10, 2025 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Jul 16, 2025 |
| Jul 10, 2025 | B | Apt 3N · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 3N, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 14, 2025 |
| Jul 10, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE THE CERAMIC TILES AT ALL FLOORS AND STAIRS AT ALL STYS AT PUBLIC HALL | Aug 14, 2025 |
| Jul 10, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL FIRE RETARDANT CEILINGS WALLS DOORS AND TRIM AT ALL STYS AT PUBLIC HALL | Oct 13, 2025 |
| Jul 10, 2025 | C | Apt 3N · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3N, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 5, 2025 |
| Jul 10, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ALL FIRE RETARDANT CEILINGS WALLS DOORS AND TRIM AT ALL STYS AT PUBLIC HALL | Aug 14, 2025 |
| Jul 8, 2025 | C | Apt 3N · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3N, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 7, 2025 |
| Jun 13, 2025 | B | Apt 3N · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 3N, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 17690110 ISSUED 12-FEB-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE | Jul 18, 2025 |
| Jun 13, 2025 | B | Apt 3N · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 3N, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 17690109 ISSUED 12-FEB-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE | Jul 18, 2025 |
| Jun 4, 2025 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF WOOD PLANKS, PLYWOOD AT PUBLIC HALL, 5th STORY | Jul 9, 2025 |
| Jun 4, 2025 | C | Apt 10 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 10, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 4, 2025 |
| Jun 4, 2025 | A | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY | Sep 7, 2025 |
| May 30, 2025 | C | Apt 3N · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3N, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | May 29, 2025 |
| May 30, 2025 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CONSTRUCTION MATERIALS (WOOD) AT PUBLIC HALL, 5th STORY | Jul 4, 2025 |
| May 30, 2025 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR TO BOILER ROOM AT BASEMENT | Jun 5, 2025 |
| Feb 21, 2025 | C | Apt 3N · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3N, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 21, 2025 |
| Feb 13, 2025 | B | § 27-2005 ADM CODE PROVIDE APPROVED TYPE MESH UNDER SKYLIGHT AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 5th STORY | Mar 20, 2025 |
| Feb 13, 2025 | C | Apt 3N · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3N, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 13, 2025 |
| Feb 13, 2025 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Feb 19, 2025 |
| Feb 13, 2025 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM PAPER SIGN POSTED, WRONG INFORMATION AT PUBLIC HALL, 1st STORY | Feb 19, 2025 |
| Feb 11, 2025 | C | Apt 3N · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3N, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 11, 2025 |
| Feb 11, 2025 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Feb 17, 2025 |
| Feb 11, 2025 | C | Apt 3N · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3N, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 11, 2025 |
| Jan 6, 2025 | C | Apt 12 · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 12, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 5, 2025 |
| Nov 12, 2024 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM ROOM LOCKED AT BOILER ROOM | Nov 18, 2024 |
| Oct 28, 2024 | B | Apt 4 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK INSTALLED AT DOOR LEADING TO FIRE ESCAPE WINDOW IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 4, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 2, 2024 |
| Oct 16, 2024 | C | Apt 4 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 16, 2024 |
| Oct 15, 2024 | B | Apt 4 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 19, 2024 |
| Oct 15, 2024 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BOILER ROOM | Oct 21, 2024 |
| Oct 15, 2024 | B | Apt 4 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 19, 2024 |
| Oct 15, 2024 | C | Apt 4 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE KITCHEN LOCATED AT APT 4, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 12, 2024 |
| Sep 3, 2024 | C | Apt 3 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK INSTALLED AT DOOR LEADING TO FIRE ESCAPE WINDOW IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 3, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 9, 2024 |
| Sep 3, 2024 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR [FROM VESTIBULE TO PUBLIC HALL] AT PUBLIC HALL, 1st STORY | Sep 17, 2024 |
| Sep 3, 2024 | B | Apt 3 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH SPRING BALANCE AT NORTH WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 3, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 8, 2024 |
| Aug 12, 2024 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BUILDING ENTRANCE DOOR HANDLE LEADING TO VESTIBULE AT PUBLIC HALL, 1st STORY | Sep 16, 2024 |
| Aug 12, 2024 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AND ASSEMBLY AT BUILDING VESTIBULE DOOR LEADING TO 1ST STORY PUBLIC HALL AT PUBLIC HALL, 1st STORY | Aug 26, 2024 |
| Jul 27, 2022 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR THATS MISSING AT PUBLIC HALL, 1st STORY | Oct 30, 2022 |
| Jul 27, 2022 | A | § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX THATS MISSING AT PUBLIC HALL, 1st STORY | Oct 30, 2022 |
| Jul 27, 2022 | A | § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. | Oct 30, 2022 |
Showing 60 of 80. Full list on the agency site.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 2, 2026, 8:41 PM ET. BBL 2023520053.