6 floors · 1020 apartments · 1,172,800 sq ft · built 1952 · class D3 · owner of record: Nyc Housing Authority
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 1,172,800 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 800 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5564). Agency page | Dec 31, 2034 in 2991 days | Next due 2034 |
| Annual boiler inspection (6 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-08 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 29, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION, OBSERVED SIDEWALK SHED PARAPET INFORMATION PANEL MISSING REQUIRED INFORMATION. FAILURE TO MAINTAIN COMPLETE AND LEGIBLE PANEL PREVENTS PUBLIC IDENTIFICATION OF RESPONSIBLE PARTIES AND PRO #39549616J | Apr 17, 2026 IN VIOLATION | $0 |
| Nov 10, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BLDG WALLS&APPURTENANCES.AS NOTED:ATOI I OBSERVED ON EXP1,2,3:OBJECTS HANGING FROM WINDOWS,AC INADEQUATELY SUPPORTED.EXP1 W ELEVATION:DAMAGE MORTAR JOINTS EXP3 E ELEVATION:SPALLING #35635134M | Mar 18, 2022 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 7, 2025 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS #00033 | DOB VIOLATION - ACTIVE |
| Feb 20, 2025 | HAZARDOUS CONDITION (FACADE) NYCHA CYCLE 9A UNSAFE REPORT FILED #912048 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00985 | DOB VIOLATION - ACTIVE |
| Jan 23, 2020 | FACADE SAFETY PROGRAM #HAZ88617 | DOB VIOLATION - ACTIVE |
| Jan 23, 2020 | FACADE SAFETY PROGRAM #HAZ88615 | DOB VIOLATION - ACTIVE |
| May 31, 2018 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 #20175 | DOB VIOLATION - ACTIVE |
| Aug 29, 1995 | LOCAL LAW 62/91 - BOILERS #17022 | DOB VIOLATION - ACTIVE |
| Aug 29, 1995 | LOCAL LAW 62/91 - BOILERS #17212 | DOB VIOLATION - ACTIVE |
| Aug 29, 1995 | LOCAL LAW 62/91 - BOILERS #17213 | DOB VIOLATION - ACTIVE |
| Aug 29, 1995 | LOCAL LAW 62/91 - BOILERS #17023 | DOB VIOLATION - ACTIVE |
| May 17, 1993 | LOCAL LAW 62/91 - BOILERS #02438 | DOB VIOLATION - ACTIVE |
| May 17, 1993 | LOCAL LAW 62/91 - BOILERS #02439 | DOB VIOLATION - ACTIVE |
| Apr 23, 1993 | LOCAL LAW 62/91 - BOILERS #100805 | DOB VIOLATION - ACTIVE |
| Apr 23, 1993 | LOCAL LAW 62/91 - BOILERS #00804 | DOB VIOLATION - ACTIVE |
| Apr 23, 1993 | LOCAL LAW 62/91 - BOILERS #00805 | DOB VIOLATION - ACTIVE |
| Apr 23, 1993 | LOCAL LAW 62/91 - BOILERS #100804 | DOB VIOLATION - ACTIVE |
| Sep 19, 1990 | ELEVATOR 73 FILE BUILD NOTICE AND SECURE PERMITE FOR NEW INSTALLATION OF CONTIDLER DOOR AND CAB AS PER NYC ADMIN CODE R 18 #1450C1 | DOB VIOLATION - ACTIVE |
| Sep 19, 1990 | ELEVATOR #1450C5 | DOB VIOLATION - ACTIVE |
| Sep 19, 1990 | ELEVATOR #1450C4 | DOB VIOLATION - ACTIVE |
| Sep 19, 1990 | ELEVATOR #1450C3 | DOB VIOLATION - ACTIVE |
| Sep 19, 1990 | ELEVATOR #1450C2 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| May 7, 2025 | Facades FISPFCS CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS | Active |
| Feb 20, 2025 | Facades FISPHAZ NYCHA CYCLE 9A UNSAFE REPORT FILED | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Jan 23, 2020 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Jan 23, 2020 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| May 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Mar 16, 2016 | B | Apt 7H · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERABLE BELL BUZZER /INTERCON SYSTEM LOCATED AT APT 7H, 7th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 20, 2016 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 8:04 PM ET. BBL 2055640001.