4 floors · 6 apartments · 142,826 sq ft · built 1953 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 142,826 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 186 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 186 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 387). Agency page | Dec 31, 2027 in 430 days | Next due 2027 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 796 days | Next cycle year 2028 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-18 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 4, 2026 | Construction CLASS - 2 RE-ISSUE #35721049Z. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS AS PER BC 1006.1; 27-381. NOTED: THERE WERE SEVERAL EMERGENCY LIGHTS THAT #35734573H | Aug 17, 2026 POP/IN-VIO | $0 |
| Aug 4, 2026 | Construction CLASS - 2 RE-ISSUE #35693250P. EXIT DOOR NOT SELF-CLOSING. NOTED: THE DOORS AT EXITS #6, #4 AND #1 ARE NOT OPERATING PROPERLY AND/OR SELF-CLOSING. REMEDY: REPAIR/REPLACE. #35734574J | Aug 17, 2026 POP/IN-VIO | $0 |
| Sep 5, 2025 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED PERMITTED SIDEWALK SHED WITH NO PARAPET INFORMATION PANEL. THIS CAUSES UNSAFE CONDITIONS TO THE PUBLIC AND EMERGENCY SERVICES BY NOT BEING ABLE TO LOCATE THE ADDRESS.PROVIDE AND M #39544470N | Jul 10, 2026 ADMIT/IN-VIO | $0 |
| Aug 12, 2025 | Construction CLASS - 2 RE-ISSUE #35688650H. EXIT DOOR NOT SELF-CLOSING. OBSERVED AT T. O. I.,THE DOORS AT EXITS 6, 4 AND 1 ARE NOT OPERATING PROPERLY OR SELF-CLOSING. REMEDY: REPAIR/REPLACE DOORS. #35693250P | Sep 10, 2025 POP/IN-VIO | $0 |
| Aug 12, 2025 | Construction CLASS - 2 RE-ISSUE #35688651J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PERBC 1006.1; 27-381. NOTED: THERE WERE SEVERAL EMERGENCY LIGHTS THAT WER #35721049Z | Sep 10, 2025 POP/IN-VIO | $0 |
| Apr 10, 2025 | Construction CLASS - 2 AT TIME OF INSPECTION OF A 3-STORY EDUCATION BUILDING SIDEWALK SHED ERECTED EXP#1 WITH VALID PERMIT.DURING MY INSPECTION I NOTICED SIDEWALK SHED HAS NO CONTACT INFORMATION PANEL.THIS CREATE A HAZARDOUS SITUATIO #39538941J | Dec 1, 2026 PENDING | $1,280 |
| Apr 10, 2025 | Construction CLASS - 2 AT 6:15AM I OBSERVED 3 STORY EDUCATION BUILDING WITH SIDEWALK SHED INSTALLED AT EXP#1 THAT WAS NOT ILLUMINATED AS STIPULATED AS PER BC3307.6.4.8 THIS CREATE HAZARDOUS CONDITION FOR PEDESTRIANS LEAD TO SLIP, TRI #39538940H | Dec 1, 2026 PENDING | $2,430 |
| Sep 9, 2024 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. AT EXIT DOORS 6, 4, AND 1 DOORS ARE NOT CLOSING PROPERLY. REMEDY: REPAIR/REPLACE DOOR. #35688650H | Oct 21, 2024 POP/IN-VIO | $0 |
| Sep 9, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT ROOF STAIR B, C, AUDITORIUM STAGE, STAGE LEFT OUTSIDE STAIRWELL, EXI #35688651J | Oct 21, 2024 POP/IN-VIO | $0 |
| Jan 11, 2024 | Unknown CLASS - 2 AT INSPECTION, IT WAS OBSERVED: YODOCKS OCCUPYING THE STREET AND UPON REQUEST FOR THE DOT PERMIT AS PER BC 3307.2.1 NONE WAS AVAILABLE OR PRESENTED CONTRARY TO CODE. OBTAIN PERMIT AS PER CODE.OBTAIN DOT PERMIT #39524753P | Jan 30, 2025 DEFAULT | $5,000 |
| Jan 11, 2024 | Unknown CLASS - 2 AT INSPECTION, IT WAS OBSERVED: GC FAILED TO ACT IN A RESPONSIBLE MANNER TO MAINTAIN A SAFE CONSTRUCTION JOBSITE AS PER BC 3301.1.1- NO CLEARLY DEFINED MEANS OF EGRESS/INGRESS FROM EXCAVATION, NO PROTECTION AT #39524752N | Jan 30, 2025 DEFAULT | $10,000 |
| Issued | Violation | Status |
|---|---|---|
| Feb 20, 2022 | HAZARDOUS CONDITION (FACADE) UNSAFE REPORT #88005 | DOB VIOLATION - ACTIVE |
| Nov 28, 2010 | ELEVATOR #9027/362243 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Oct 28, 2010 | ELEVATOR #9027/362243 | DOB VIOLATION - ACTIVE |
| Oct 28, 2010 | ELEVATOR #9027H362243 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 4, 2026 | ECB | Construction: RE-ISSUE #35721049Z. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS AS PER BC 1006.1; 27-381. NOTED: THERE WERE SEVERAL EMERGENCY LIGHTS THAT | Open |
| Aug 4, 2026 | ECB | Construction: RE-ISSUE #35693250P. EXIT DOOR NOT SELF-CLOSING. NOTED: THE DOORS AT EXITS #6, #4 AND #1 ARE NOT OPERATING PROPERLY AND/OR SELF-CLOSING. REMEDY: REPAIR/REPLACE. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 8:07 AM ET. BBL 1003870001.