1 floors · 4,540 sq ft · built 1940 · class K1 · owner of record: Troia Realty Co
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-04-26 (Accepted). Agency page | Dec 31, 2026 in 65 days | 1 of 1 without an accepted 2026 report yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1161 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 8, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR 39153168Y., FILE A CERTIFICATE OF CORRECTION #39207353R | Dec 15, 2026 PENDING | $1,250 |
| Jul 9, 2025 | Construction CLASS - 1 NOTED, APPROXIMATELY 9' (H) X 8' (W)METAL STORAGE UNIT WITH A ROLL-DOWN GATE WITH STORAGE ON THE ROOF CONSISTING OF STACKED BOTTLES, WOOD PALLETS, AND OTHER RECYCLING/REFUSE, CAUSING A HAZARD TO THE PUBLIC IN S #39153168Y | Apr 5, 2027 DEFAULT | $12,500 |
| Jul 9, 2025 | Construction CLASS - 2 NOTED, APPROXIMATELY 9' (H) X 12' (W)METAL STORAGE UNIT WITH A ROLL-DOWN GATE AND SEPARATE METAL GATE ENTRY. UPON DOB RESEARCH, NO PERMITS ISSUED FOR THIS BUILDING., OBTAIN ALL PERMITS #39153169X | Apr 5, 2027 DEFAULT | $6,250 |
| Oct 1, 2024 | Construction CLASS - 2 CURB-CUT CREATED WITHOUT DOB APPROVAL REQUIRED BY BC 3202.2.2.4 & DOT SPECIFICATION. INSPECTION TIME NOTED, "REDEMPTION CENTER" IS A PART OF ADDRESS-55-07 CREATED AN ILLEGAL APPROX. 15FEET LONG CURB CUT ALONG W #39126233H | Feb 9, 2027 DEFAULT | $3,125 |
| Sep 9, 2009 | Construction CLASS - 2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. FOR ALT 2, JOB #410097791, PLAN DATED 4.11.08, PERMIT EXPIRED @ 6.30.08. NOTED: 1) AN EXTENSION APPROX 25' X 12' W/A DOOR AND #34795541X | Apr 27, 2010 DEFAULT | $0 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 8, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR 39153168Y., FILE A CERTIFICATE OF CORRECTION | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 4:16 PM ET. BBL 4025000025.