Manhattan · Block 537 · Lot 21 · 10012

548 La Guardia Place

4 floors · 3 apartments · 3,120 sq ft · built 1870 · class S3 · owner of record: Name Not On File

3open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
58dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 58 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 58 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 74 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 302 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1154 days
Next cycle year 2029

Open violations

ECB / OATH (0)

None open.

DOB (1)
IssuedViolationStatus
Oct 29, 2026CONSTRUCTION
FTM BLDG IN CODE COMPLIANT MANNER-OBSVD @ EXP1 FRONT SIDE,CRACKED RATED WINDOW HEADERS AND SILLS @ EXP4 THE CORNER EDGEOF THE RIGHT SIDE PATCH REPAIR, MISSING BRICKS OWNER TO IMMED RETAIN NYSPE TO EVAL ENTIRE BLDG,PREPARE/FILE REPAIR DW BLDG UNDER PERMIT, START BY 12/29/2026
#PI10201HZ
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (2) · C 0 · B 1 · A 1
IssuedClassViolationCorrect by
May 7, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 10, 2026
Jun 4, 2008BApt 3 · D26-17.09, 18.01 ADM CODE DISCONTINUE USE OF ILLEGAL SPACE AND/OR HOT WATER HEATER AND PROVIDE FILED FOR & APPROVED HEATER WHICH OBTAINS COMBUSTION AIR DIRECTLY FROM OUTSIDE THE BUILDING OR APPROVED CENTRAL SYSTEM 3RD STY REAR APT 3 KITCHENETTE. LOCATED AT APT 3Jul 9, 2008

Issued in the last 120 days

DateSourceWhatNow
Oct 29, 2026DOBCONSTRUCTION: FTM BLDG IN CODE COMPLIANT MANNER-OBSVD @ EXP1 FRONT SIDE,CRACKED RATED WINDOW HEADERS AND SILLS @ EXP4 THE CORNER EDGEOF THE RIGHT SIDE PATCH REPAIR, MISSING BRICKS OWNER TO IMMED RETAIN NYSPE TO EVAL ENTIRE BLDG,PREPARE/FILE REPAIR DW BLDG UNDER PERMIT, START BY 12/29/2026Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 3, 2026, 7:06 PM ET. BBL 1005370021.

Look up another building