Manhattan · Block 761 · Lot 32 · 10018

543 8 Avenue

4 floors · 5,753 sq ft · built 1925 · class K9 · owner of record: 541 Construction Corp

13open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
63dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 63 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 63 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2021-05-18 (Accepted). Agency page

Dec 31, 2026
in 63 days
1 of 1 without an accepted 2026 report yet

Open violations

ECB / OATH (3)
IssuedViolationHearingBalance
Sep 5, 2017Boilers CLASS - 2
36-FOUND HEATMAKER BOILER MODEL HW M2-130N 130,000 BTUS UNREGISTERED AND OPERATING. REGISTER BOILER AND CORRECT ANY VIOLATING CONDITIONS AND SUBMIT A CERTIFICATE OF CORRECTION.
#32091533H
Feb 1, 2018
WRITTEN OFF
$0
Sep 5, 2017Construction CLASS - 1
B101 FOUND LAARS BOILER MODEL EBP0175NAIF2AX,175,000 BTUS. INSTALLED AND OPERATING. APPLY FOR PROPER PERMITS CORRECT ALL VIOLATING CONDITIONS AND SUBMIT A CERTIFICATE OF CORRECTION.
#32091532X
Feb 1, 2018
WRITTEN OFF
$0
Sep 5, 2017Boilers CLASS - 2
36-FOUND LAARS BOILER MODEL EBP0175NAIF2AX 175,000 BTUS UNREGISTERED AND OPERATING. REGISTER BOILER AND CORRECT ANY VIOLATING CONDITIONS AND SUBMIT A CERTIFICATE OF CORRECTION.
#32091534J
Feb 1, 2018
WRITTEN OFF
$0
DOB (5)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#02522
DOB VIOLATION - ACTIVE
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#02554
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#06057
DOB VIOLATION - ACTIVE
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#03999
DOB VIOLATION - ACTIVE
Oct 1, 2015LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
#02560
DOB VIOLATION - ACTIVE
DOB NOW Safety (5)
IssuedViolationStatus
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Sep 23, 2024Boiler LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Active
Oct 1, 2015Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 29, 2026, 5:52 AM ET. BBL 1007610032.

Look up another building