3 floors · 24,766 sq ft · built 1920 · class O5 · owner of record: Flatbush-Fulton Rtyasso
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-10-31 (Accepted). Agency page | Dec 31, 2026 in 47 days | 1 of 1 without an accepted 2026 report yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1143 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 15, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTE:-AT THE TIME OF INSPECTION OBSERVED, AT EXPO. #1 EAST ELEVATION CRACK/SPALLING MASONARY FROM TOP LEVEL OF BULKHEAD. REMEDY: REPAIR AND REPLACE AS PER #35682564Y | Jul 24, 2024 IN VIOLATION | $625 |
| Nov 14, 2023 | Construction CLASS - 1 FAILURE TO MAINTAIN WALL(S) AND APPURTENANCES. AT TIME OF INSPECTION OBSERVED, CRACK OF THE CORNIS AT EXPOSURE(1) EAST ELEVATION/3 FLOOR LINE. A SPALLED CORNIS RIGHT NEXT TO THE CRACKED STONE CORNIS. ON THE 7 F #35675359J | Jul 29, 2024 IN VIOLATION | $2,500 |
| Oct 10, 2023 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AS NOTED: AT TIME OF INSPECTION I OBSERVED ON EXPOSURE 1 SOUTH ELEVATION: CRACK DISLODGED COPING STONE ON TOP LEVEL OF STAIR-WELL ENCLOSURE, CRACKED MASO #35674570K | Dec 20, 2023 DEFAULT | $3,125 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #01444 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #31814 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #31815 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 5:57 AM ET. BBL 3001610043.