6 floors · 33 apartments · 42,265 sq ft · built 1925 · class D1 · owner of record: Columbia University
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 47 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-01 (Accepted). Agency page | Dec 31, 2026 in 47 days | 1 of 2 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 42,265 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #03991 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #03556 | DOB VIOLATION - ACTIVE |
| Aug 2, 2019 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00450 | DOB VIOLATION - ACTIVE |
| May 2, 2019 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00876 | DOB VIOLATION - ACTIVE |
| Jan 3, 2008 | LOCAL LAW 62/91 - BOILERS #01476 | DOB VIOLATION - ACTIVE |
| Sep 2, 1992 | CONSTRUCTION #D4ED01 | DOB VIOLATION - ACTIVE |
| Sep 2, 1992 | CONSTRUCTION #D4ED03VW | VIOLATION UNSERVED ECB-ACTIVE |
| Sep 2, 1992 | CONSTRUCTION #D4ED01 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Aug 2, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 2, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Jan 3, 2008 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jan 8, 2025 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE FRAME, AT BUILDING ENTRANCE DOOR | Jan 22, 2025 |
| Nov 19, 2024 | A | Apt 2D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Feb 22, 2025 |
| Nov 6, 2024 | B | Apt 2D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Dec 11, 2024 |
| Nov 6, 2024 | B | Apt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Dec 11, 2024 |
| Nov 6, 2024 | A | Apt 2D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Feb 9, 2025 |
| Nov 6, 2024 | C | Apt 2D · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 2nd APAR | Dec 2, 2024 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 5:28 PM ET. BBL 1018850011.