Manhattan · Block 1078 · Lot 53 · 10019

540 West 50 Street

7 floors · 27 apartments · 25,399 sq ft · built 2005 · class D1 · owner of record: 540 West 50th Street Llc

6open violations
$2,500ECB/OATH penalties owed
4HPD class C (immediately hazardous)
47dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 47 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 25,399 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Registered through 2027-09-01
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $140,000 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: SWARMP (2025-02-22)

Open violations

ECB / OATH (2) · $2,500 owed
IssuedViolationHearingBalance
May 5, 2025Construction CLASS - 1
FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. AT TIME OF INSPECTION OBSERVED HAZARDOUS LOOSE CRACK IN THE MASONRY ON EXPOSURE 1 NORTH ELE(W 50H STR) 4TH FLOOR, ALSO SPALLING CONDITION ON BRICK
#35693711Z
Dec 5, 2025
IN VIOLATION
$2,500
Apr 11, 2024Local Law CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #913549. REMEDY: SUBMIT ACCEPTABLE REQU
#37027693M
Aug 8, 2024
IN VIOLATION
$0
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (5) · C 4 · B 0 · A 1
IssuedClassViolationCorrect by
Feb 16, 2021CApt 5B · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM NORTH AT EASTFeb 22, 2021
Feb 16, 2021C§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF AN UNACCEPTABLE ELECTROMAGNETIC LOCKING DEVICE INSTALLED AT BUILDING ENTRANCE DOOR. , 1st STORYFeb 22, 2021
Feb 16, 2021C§ 27-2005 ADM CODE PROVIDE SECURITY IN THE EVENT OF A POWER OUTAGE BY MEANS OF AN ACCEPTABLE MECHANICAL HEAVY DUTY LOCK AND LATCH SET AT VESTIBULE ENTRANCE DOOR. , 1st STORYFeb 22, 2021
Feb 16, 2021C§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF AN UNACCEPTABLE ELECTROMAGNETIC LOCKING DEVICE INSTALLED AT VESTIBULE ENTRANCE DOOR. , 1st STORYFeb 22, 2021
Nov 4, 2019A§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORYFeb 7, 2020

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 11:07 AM ET. BBL 1010780053.

Look up another building