Bronx · Block 5786 · Lot 204 · 10463

540 West 235 Street

1 floors · 29,693 sq ft · built 1955 · class K1 · owner of record: Riverdale Center Ny Llc

35open violations
$3,125ECB/OATH penalties owed
0HPD class C (immediately hazardous)
50dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 50 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 29,693 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 171 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 171 days
Annual filing
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-13 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (4) · $3,125 owed
IssuedViolationHearingBalance
Jan 13, 2026Elevators CLASS - 1
CLASS 1(CU):FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. SERVICE ELEVATOR EQUIPMENT AS PER BC3001.2 & 27-987. UPON INSPECTION, DOOR ZONE RESTRICTOR INOPERATIVE/MISSING PARTS,REPAIR AND TEST DEVICE.JUM
#39173686M
Mar 20, 2026
DEFAULT
$3,125
Nov 20, 2025Unknown CLASS - 2
I OBSERVED ELECTRICAL WORK FOR REFRIGERATION, MOTORS, WIRING, DISCONNECTS WITHOUT A PERMIT ON FILE, OBTAIN PERMIT; OBTAIN AN ELECTRICAL PERMIT
#39168051M
Jan 30, 2026
ADMIT/IN-VIO
$0
Nov 20, 2025Unknown CLASS - 1
I OBSERVED UNSAFE UNSUITABLE CONDITIONS ELECTRICAL WIRING FOR LIGHT FIXTURES OPEN EXPOSED WIRING THROUGHOUT BASEMENT OF SUPERMARKET, COMPLY WITH EC; FIX ALL UNSAFE CONDITIONS AS PER NEC AND NYC AMENDMENTS
#39168055J
Jan 30, 2026
ADMIT/IN-VIO
$0
Apr 11, 2018Construction CLASS - 2
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS FOR JOB #220227582 NOTED: COOKING EQUIPMENT COUNT AND FIRE SUPPRESSION NOZZLE COUNT NOT AS PER PLAN; 2-HOOD LOCATION NOT AS PE
#35307648R
Jun 1, 2018
STIPULATION/IN-VIO
$0
DOB (9)
IssuedViolationStatus
Sep 23, 2024HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
#01150
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
#00142
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#05995
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
#03435
DOB VIOLATION - ACTIVE
Sep 6, 2019(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
#08150
DOB VIOLATION - ACTIVE
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#06220
DOB VIOLATION - ACTIVE
Sep 15, 2017ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
#04237
DOB VIOLATION - ACTIVE
May 17, 2017ELEVATOR
CEASE USE
#9027H602752
DOB VIOLATION - ACTIVE
May 13, 2016ELEVATOR

#9027/576182
DOB VIOLATION - ACTIVE
DOB NOW Safety (23)
IssuedViolationStatus
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Mar 17, 2026AEUHAZ FTC-AEU-HAZ
Active
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 8)
Active
Oct 25, 2024Boiler FTC-BE-EXT-HP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for HP Device
Active
Sep 23, 2024Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
Active
Nov 14, 2023Boiler FTC-BE-INT-HP
Violation Issued-Failure To File 2021 Internal Inspection Affirmation of Correction for HP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-HP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for HP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-HP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for HP Device
Active
Nov 14, 2023Boiler FTC-BE-INT-HP
Violation Issued-Failure To File 2022 Internal Inspection Affirmation of Correction for HP Device
Active
Nov 14, 2023Boiler FTC-BE-INT-HP
Violation Issued-Failure To File 2020 Internal Inspection Affirmation of Correction for HP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-HP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for HP Device
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
Active
Sep 6, 2019Elevators ACC1
Active
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Active
Sep 15, 2017Elevators EVCAT1
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 9:01 AM ET. BBL 2057860204.

Look up another building