Bronx · Block 2268 · Lot 22 · 10454

540 East 142 Street

4 floors · 8 apartments · 5,496 sq ft · built 2018 · class C1 · owner of record: Shg 540 Llc

0open violations
$30,625ECB/OATH penalties owed
0HPD class C (immediately hazardous)
46dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 46 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 46 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 62 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 290 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 777 days
Next cycle year 2028

Open violations

ECB / OATH (9) · $30,625 owed
IssuedViolationHearingBalance
Sep 30, 2019Construction CLASS - 2
BC33091-FAILURE TO PROTECT OR ADEQUATELY PROTECT ADJOINING PROPERTIES.DURING CONSTRUCTION OR DEMOLITION OPERATION.AT TIME OF INSPECTION I OBSERVED AT CONSTRUCTION SITE WAS PERFORM CONSTRUCTION WORK,DURING INSPE
#35449939K
May 14, 2021
IN VIOLATION
$1,250
Jul 17, 2019Construction CLASS - 1
3303.7.2:FIRE EXTINGUISHER AT TIME OF INSPECTION OF NEW 4 STORY BUILDING ACTIEV JOBSITE I OBSERVED MISSING FIRE EXTINGUISHERS THROUGHOUT JOBSITE THIS CONDITION CREATES AN UNSAFE CONDITION IN CASE OF FIRE PROVI
#35440810Z
Sep 27, 2019
IN VIOLATION
$625
Jul 17, 2019Construction CLASS - 1
3301.2:CONTROL ACCESS ZOEN AT TIME OF INSEPCTION FO NEW 4 STORY BUILDING ACTIVE JOBSITE I OBSERVED INADEQUATE GUARDRAIL SYSTEM AT BALCONIES WITH OPEN DOORS MISSING TOE BAORDS AND ALSO MISSING CONTROL ACCESS RON
#35440806X
Sep 27, 2019
IN VIOLATION
$625
Apr 17, 2019Construction CLASS - 1
SEC. 3303.2.3.1 TEMPORARY LIGHTING FOR CONSTRUCTION SITES. AT THE TIMEOF MY INSPECTION OF A PROPOSED 4 STY NEW BLDG I OBSERVED NO TEMPORARY LIHGHTING IN THE BLDG. THERE WERE 2 WORKERS WORKING IN THE DARK ON THE
#35405477K
Nov 8, 2019
IN VIOLATION
$625
Apr 17, 2019Construction CLASS - 1
FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. ATTHE TIME OF MY INSPECTION OF A PROPOSED 4 STY NEW BLDG I OBSERVED A LACK OF HOUSEKEEPING. THE 1ST FL HAD MASONRY DEBRIS THROUGHOUT THE STAIR
#35405478M
Nov 8, 2019
IN VIOLATION
$2,500
Feb 7, 2019Site Safety CLASS - 1
CONST SUPER FAILED TO PERFORM HIS DUTIES.@TIME OF INSP ON ACTIVE JOBSITE,UPON REQUEST TO SEE CONST SUPER COMPETENT PERSON,NO ONE WAS AVAILABLE OR PRESENT,UPON REVIEWING DESIGNATED CONST SUPER ON PW2-JOHN BRANDI
#35385723L
Dec 6, 2019
IN VIOLATION
$10,000
Feb 7, 2019Construction CLASS - 1
3305.3.5.2 CONST LOADS.@TIME OF INSP ON ACTIVE JOBSITE IT WAS OBSERVEDAT FL BOARDS WERE BROKEN W/LARGE HOLES & W/HEAVY LOADS ON PALLETS OF CONCRETE BASS & CMU BLOCKS,ALSO LARGE AMOUNTS OF DEBRIS.UPON REVIEWING
#35385720X
Dec 6, 2019
IN VIOLATION
$2,500
Feb 7, 2019Construction CLASS - 1
FAILURE TO PROVIDE & MAINTAIN HOUSEKEEPING.@TIME OF INSP ON ACTIVE JOBSITE WAS OBSERVED THAT @REAR EXP #3 IT WAS FULL OF DEBRIS,BLDG MATERIALS & GARBAGE,@ 2 FL,FL FULL OF PALLETS OF CMU BLOCK & DEBRIS,SCATTERED
#35385722J
Dec 6, 2019
IN VIOLATION
$2,500
Feb 1, 2019Construction CLASS - 1
FAILURE TO PROVIDE SIDEWALK SHED WHERE REQUIRED. AT TIME OF INSPECTIONI OBSERVED A NEW BUILDING AT THE SECOND STORY LEVEL WITH CMU WALL AT EXP1 STILL UNDER CONSTRUCTION W/O OVERHEAD PROTECTION IN PLACE.PROPOSE
#35385731L
Dec 19, 2019
IN VIOLATION
$10,000
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 15, 2026, 9:11 PM ET. BBL 2022680022.

Look up another building